Status of Active Formal Assessments

Scroll down for a searchable list of current active proposals.

The documents below set out the details of those proposals being formally assessed by the Environmental Protection Authority (EPA). Their timelines and the stage they have reached within the environmental impact assessment process are updated on a monthly basis.

Please contact us if you require further information about Active Formal Assessments.

*Note - The Status of Active Formal Assessments for s38 Proposals are now presented within one pdf. document.

Active assessments

Displaying 1 - 87 of 87

Northern Goldfields Interconnect Pipeline

Type: Proposals

Proponent: APA Northern Goldfields Interconnect Pty Ltd

Formal Assessment Status: Active

Last Updated: September 15, 2021

Assessment Number: 2284

Current status: Response to submission published


Yangibana Expansion 1

Type: Proposals

Proponent: Hastings Technology Metals Ltd

Formal Assessment Status: Active

Last Updated: September 14, 2021

Assessment Number: 2280

Current status: Decision on whether to assess has been published


Port Hedland Power Station Expansion

Type: Proposals

Proponent: Alina DEWAP Pty Ltd

Formal Assessment Status: Active

Last Updated: September 13, 2021

Assessment Number: 2307

Current status: Decision on whether to assess has been published


Lynas Kalgoorlie Rare Earths Processing Facility

Type: Proposals

Proponent: Lynas Kalgoorlie Pty Ltd

Formal Assessment Status: Active

Last Updated: September 9, 2021

Assessment Number: 2269

Current status: Response to submission published


Bunbury Outer Ring Road (Southern Section)

Type: Proposals

Proponent: Main Roads WA

Formal Assessment Status: Active

Last Updated: September 6, 2021

Assessment Number: 2225

Current status: Response to submission published


Eramurra Solar Salt Project

Type: Proposals

Proponent: Leichhardt Industrials Pty Ltd

Formal Assessment Status: Active

Last Updated: September 6, 2021

Assessment Number: 2306

Current status: Decision on whether to assess has been published


Revised Proposal for the Roy Hill Iron Ore Mine

Type: Proposals

Proponent: Roy Hill Iron Ore Pty Ltd

Formal Assessment Status: Active

Last Updated: August 31, 2021

Assessment Number: 2214

Current status: Environmental Review document open for public submissions


West Erregulla Processing Plant and Pipeline

Type: Proposals

Proponent: AGI Operations Pty Limited

Formal Assessment Status: Active

Last Updated: August 30, 2021

Assessment Number: 2305

Current status: Decision on whether to assess has been published


Malaga to Ellenbrook Rail Works

Type: Proposals

Proponent: Public Transport Authority

Formal Assessment Status: Active

Last Updated: August 18, 2021

Assessment Number: 2238

Current status: Ministerial Statement published


Yardie Creek Road Realignment Project

Type: Proposals

Proponent: Main Roads Western Australia

Formal Assessment Status: Active

Last Updated: August 16, 2021

Assessment Number: 2304

Current status: Decision on whether to assess has been published


Warton Road Mining Proposal

Type: Proposals

Proponent: Hanson Australia Pty Ltd

Formal Assessment Status: Active

Last Updated: July 28, 2021

Assessment Number: 2089

Current status: Assessment has been terminated under s40A of the EP Act


CBH Kwinana Fertiliser Project

Type: Proposals

Proponent: Co-operative Bulk Handling Limited (CBH Ltd)

Formal Assessment Status: Active

Last Updated: July 15, 2021

Assessment Number: 2277

Current status: Ministerial Statement published


Covalent Lithium Hydroxide Refinery

Type: Proposals

Proponent: Covalent Lithium Pty Ltd

Formal Assessment Status: Active

Last Updated: July 15, 2021

Assessment Number: 2282

Current status: Ministerial Statement published


Mardie Project

Type: Proposals

Proponent: Mardie Minerals Pty Ltd

Formal Assessment Status: Active

Last Updated: July 7, 2021

Assessment Number: 2167

Current status: EPA Report and Recommendations released - appeals open


Ningaloo Lighthouse Resort Project

Type: Proposals

Proponent: Z1Z Resorts Pty Ltd

Formal Assessment Status: Active

Last Updated: July 5, 2021

Assessment Number: 2301

Current status: Decision on whether to assess has been published


Single Jetty Deep Water Port & Renewable Hub

Type: Proposals

Proponent: Gascoyne Gateway Ltd

Formal Assessment Status: Active

Last Updated: July 5, 2021

Assessment Number: 2302

Current status: Decision on whether to assess has been published


Limestone Quarry, Lot 4 Binningup Road, Binningup

Type: Proposals

Proponent: The GM Giacci Family Trust

Formal Assessment Status: Active

Last Updated: July 2, 2021

Assessment Number: 2300

Current status: Decision on whether to assess has been published


West Musgrave Copper and Nickel Project

Type: Proposals

Proponent: OZ Minerals Musgrave Operations Pty Ltd

Formal Assessment Status: Active

Last Updated: June 28, 2021

Assessment Number: 2286

Current status: Assessment on Proponent Information – open for public submissions


Mackay Sulphate of Potash Project

Type: Proposals

Proponent: Agrimin Limited

Formal Assessment Status: Active

Last Updated: June 11, 2021

Assessment Number: 2193

Current status: Environmental Scoping Document approved


Wuudagu Bauxite Project

Type: Proposals

Proponent: VBX Limited

Formal Assessment Status: Active

Last Updated: June 9, 2021

Assessment Number: 2237

Current status: Environmental Scoping Document approved


Pinjarra Alumina Refinery Revised Proposal

Type: Proposals

Proponent: Alcoa of Australia Limited

Formal Assessment Status: Active

Last Updated: May 31, 2021

Assessment Number: 2253

Current status: Decision on whether to assess has been published


WA Offshore Windfarm Project

Type: Proposals

Proponent: WA Offshore Windfarm Pty Ltd

Formal Assessment Status: Active

Last Updated: May 31, 2021

Assessment Number: 2294

Current status: Decision on whether to assess has been published


Arrowsmith North Silica Sand Project

Type: Proposals

Proponent: VRX Silica Limited

Formal Assessment Status: Active

Last Updated: May 24, 2021

Assessment Number: 2291

Current status: Decision on whether to assess has been published


Tonkin Highway Grade Separated Interchanges (Hale Road and Welshpool Road)

Type: Proposals

Proponent: Commissioner of Main Roads Western Australia (Main Roads)

Formal Assessment Status: Active

Last Updated: May 24, 2021

Assessment Number: 2293

Current status: Decision on whether to assess has been published


Earl Grey Lithium Project

Type: Proposals

Proponent: Covalent Lithium Pty Ltd

Formal Assessment Status: Active

Last Updated: May 18, 2021

Assessment Number: 2123

Current status: Ministerial Statement published


Yalyalup Mineral Sands Project

Type: Proposals

Proponent: Doral Mineral Sands Pty Ltd

Formal Assessment Status: Active

Last Updated: May 17, 2021

Assessment Number: 2141

Current status: Ministerial Statement published


Eneabba Mineral Sand Mine

Type: Proposals

Proponent: Iluka Resources Limited

Formal Assessment Status: Active

Last Updated: May 12, 2021

Assessment Number: 1927

Current status: Assessment has been terminated under s40A of the EP Act


Ammonia Plant, Murujuga (Burrup Peninsula), Renewable Hydrogen Project

Type: Proposals

Proponent:

Formal Assessment Status: Active

Last Updated: May 11, 2021

Assessment Number: 2274

Current status: Assessment on Proponent Information – public submission period closed


Gabanintha Vanadium Project

Type: Proposals

Proponent: Technology Metals Australia Limited

Formal Assessment Status: Active

Last Updated: May 6, 2021

Assessment Number: 2190

Current status: Environmental Scoping Document approved


Brine Pipeline and Outfall

Type: Proposals

Proponent: Harvey Water

Formal Assessment Status: Active

Last Updated: May 6, 2021

Assessment Number: 2289

Current status: Decision on whether to assess has been published


Medcalf Vanadium Project

Type: Proposals

Proponent: Audalia Resources Limited

Formal Assessment Status: Active

Last Updated: May 3, 2021

Assessment Number: 2156

Current status: Public Environmental Review period closed


Lake Way Sulphate of Potash Project

Type: Proposals

Proponent: Piper Preston Pty Ltd

Formal Assessment Status: Active

Last Updated: April 28, 2021

Assessment Number: 2228

Current status: Ministerial Statement published


West Angelas Revised Proposal

Type: Proposals

Proponent: Robe River Mining Co. Pty Ltd.

Formal Assessment Status: Active

Last Updated: April 27, 2021

Assessment Number: 2290

Current status: Decision on whether to assess has been published


Ravensthorpe Nickel Project Revised Proposal

Type: Proposals

Proponent: Ravensthorpe Nickel Operations Pty Ltd

Formal Assessment Status: Active

Last Updated: April 19, 2021

Assessment Number: 2100

Current status: Environmental Scoping Document approved


Australian Vanadium Project – Mining and Beneficiation Operations

Type: Proposals

Proponent: Australian Vanadium Limited

Formal Assessment Status: Active

Last Updated: April 19, 2021

Assessment Number: 2287

Current status: Decision on whether to assess has been published


Sodium Cyanide Plants (Liquid and Solid) at Kwinana and Transport of Sodium Cyanide by Road and Rail from Kwinana

Type: Proposals

Proponent: Australian Gold Reagents Pty Ltd

Formal Assessment Status: Active

Last Updated: April 19, 2021

Assessment Number: 2288

Current status: Decision on whether to assess has been published


Southern Forest Irrigation Scheme

Type: Proposals

Proponent: SF Irrigation Cooperative Limited

Formal Assessment Status: Active

Last Updated: April 19, 2021

Assessment Number: 2203

Current status: Decision on whether to assess has been published


Munglinup Graphite Project

Type: Proposals

Proponent: MRC Graphite Pty Ltd

Formal Assessment Status: Active

Last Updated: April 12, 2021

Assessment Number: 2206

Current status: Assessment on Proponent Information – open for public submissions


Alkimos Seawater Desalination Plant

Type: Proposals

Proponent: Water Corporation

Formal Assessment Status: Active

Last Updated: April 6, 2021

Assessment Number: 2210

Current status: Environmental Scoping Document approved


Urban Development of Lot 9000 Wanneroo Road Sinagra

Type: Proposals

Proponent: The Order of the Servants of Mary Inc.

Formal Assessment Status: Active

Last Updated: February 9, 2021

Assessment Number: 2268

Current status: Decision on whether to assess has been published


Atlas Project

Type: Proposals

Proponent: Image Resources NL

Formal Assessment Status: Active

Last Updated: January 25, 2021

Assessment Number: 2276

Current status: Decision on whether to assess has been published


Manuwarra Red Dog Highway – Revised Proposal

Type: Proposals

Proponent: Main Roads Western Australia

Formal Assessment Status: Active

Last Updated: December 21, 2020

Assessment Number: 2273

Current status: Decision on whether to assess has been published


Cardup Brickworks Redevelopment

Type: Proposals

Proponent: Austral Bricks (WA) Pty Ltd

Formal Assessment Status: Active

Last Updated: November 30, 2020

Assessment Number: 2270

Current status: Decision on whether to assess has been published


Miralga Creek DSO Project

Type: Proposals

Proponent: Atlas Iron Pty. Ltd.

Formal Assessment Status: Active

Last Updated: November 23, 2020

Assessment Number: 2249

Current status: Ministerial Statement published


Asian Renewable Energy Hub Revised Proposal

Type: Proposals

Proponent: NW Interconnected Power Pty Ltd

Formal Assessment Status: Active

Last Updated: November 9, 2020

Assessment Number: 2265

Current status: Decision on whether to assess has been published


Yanchep Rail Extension: Part 2 – Eglinton to Yanchep

Type: Proposals

Proponent: Public Transport Authority

Formal Assessment Status: Active

Last Updated: November 4, 2020

Assessment Number: 2174

Current status: Ministerial Statement published


Yogi Magnetite Project

Type: Proposals

Proponent: FI Joint Venture Pty Ltd (FIJV)

Formal Assessment Status: Active

Last Updated: October 6, 2020

Assessment Number: 2154

Current status: Public Environmental Review period closed


Worsley Mine Expansion – Revised Proposal

Type: Proposals

Proponent: South32 Worsley Alumina Pty Ltd

Formal Assessment Status: Active

Last Updated: October 6, 2020

Assessment Number: 2216

Current status: Environmental Scoping Document approved


Subdivision of Lot 123 Mortimer Road Casuarina

Type: Proposals

Proponent: Ivan Yujnovich

Formal Assessment Status: Active

Last Updated: September 29, 2020

Assessment Number: 2254

Current status: Decision on whether to assess has been published


Keysbrook Motorsport Facility

Type: Proposals

Proponent: Stati Group of Companies

Formal Assessment Status: Active

Last Updated: August 10, 2020

Assessment Number: 2242

Current status: Environmental Scoping Document approved


Great Southern Landfill at Allawuna Farm Lots 4869, 5931, 9926 and 26934 Great Southern Highway, St Ronans

Type: Proposals

Proponent: Alkina Holdings Pty Ltd

Formal Assessment Status: Active

Last Updated: August 10, 2020

Assessment Number: 2204

Current status: Public Environmental Review period closed


Ravensthorpe Gold Project

Type: Proposals

Proponent: ACH Minerals Pty Ltd

Formal Assessment Status: Active

Last Updated: July 21, 2020

Assessment Number: 2117

Current status: Ministerial Statement published


Urban Development of lots 11 and 74 Beenyup Road Banjup

Type: Proposals

Proponent: Aigle Royal

Formal Assessment Status: Active

Last Updated: July 20, 2020

Assessment Number: 2255

Current status: Decision on whether to assess has been published


Mesa H Proposal (Revision to Mesa J Iron Ore Development)

Type: Proposals

Proponent: Robe River Mining Co. Pty. Ltd

Formal Assessment Status: Active

Last Updated: July 9, 2020

Assessment Number: 2121

Current status: Ministerial Statement published


Great Northern Highway Muchea to Wubin Upgrade – Stage 2 - Bindoon Bypass

Type: Proposals

Proponent: Main Roads

Formal Assessment Status: Active

Last Updated: July 6, 2020

Assessment Number: 2135

Current status: Public Environmental Review period closed


Learmonth Pipeline Fabrication Facility

Type: Proposals

Proponent: Subsea 7 Contracting Pty Ltd

Formal Assessment Status: Active

Last Updated: June 29, 2020

Assessment Number: 2208

Current status: Response to submission published


Raven 2D Seismic Acquisition Survey

Type: Proposals

Proponent: Energy Resources Limited

Formal Assessment Status: Active

Last Updated: June 29, 2020

Assessment Number: 2252

Current status: Decision on whether to assess has been published


2D Seismic Acquisition Survey

Type: Proposals

Proponent: UIL Energy

Formal Assessment Status: Active

Last Updated: June 3, 2020

Assessment Number: 2096

Current status: Assessment has been terminated under s40A of the EP Act


Greater Paraburdoo Iron Ore Hub Proposal

Type: Proposals

Proponent: Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto)

Formal Assessment Status: Active

Last Updated: May 27, 2020

Assessment Number: 2189

Current status: Public Environmental Review period closed


Sulphur Springs Zinc-Copper Project

Type: Proposals

Proponent: Venturex Resources Limited

Formal Assessment Status: Active

Last Updated: May 20, 2020

Assessment Number: 2120

Current status: Ministerial Statement published


Woodie Continued Operations Project

Type: Proposals

Proponent: Consolidated Minerals Pty Ltd

Formal Assessment Status: Active

Last Updated: May 11, 2020

Assessment Number: 2245

Current status: Decision on whether to assess has been published


Brockman Syncline 4 Iron Ore Project – Marra Mambas Proposal

Type: Proposals

Proponent: Hamersley Iron Pty Limited

Formal Assessment Status: Active

Last Updated: April 6, 2020

Assessment Number: 2165

Current status: Assessment has been terminated under s40A of the EP Act


Brockman Syncline Proposal

Type: Proposals

Proponent: Hamersley Iron Pty Limited

Formal Assessment Status: Active

Last Updated: March 31, 2020

Assessment Number: 2219

Current status: Environmental Scoping Document approved


Rottnest Lodge Development

Type: Proposals

Proponent: Rottnest Island Authority

Formal Assessment Status: Active

Last Updated: February 24, 2020

Current status: Decision on whether to assess has been published


North West Shelf Project Extension

Type: Proposals

Proponent: Woodside Energy Ltd

Formal Assessment Status: Active

Last Updated: February 12, 2020

Assessment Number: 2186

Current status: Public Environmental Review period closed


Proposed Browse to NWS Development

Type: Proposals

Proponent: Woodside Energy Ltd

Formal Assessment Status: Active

Last Updated: February 12, 2020

Assessment Number: 2191

Current status: Public Environmental Review period closed


Lots 2 and 10 Rowley Road, Mandogalup

Type: Proposals

Proponent: Questdale Holdings Pty Ltd

Formal Assessment Status: Active

Last Updated: December 10, 2019

Assessment Number: 2197

Current status: Environmental Scoping Document approved


Hard Rock Quarry, Lot 800 Pruden Road, Whitby

Type: Proposals

Proponent: Italia Stone Group Pty Ltd

Formal Assessment Status: Active

Last Updated: August 29, 2019

Assessment Number: 2160

Current status: Environmental Scoping Document approved


Limestone and Sand Quarry Lot 1002 Preston Beach

Type: Proposals

Proponent: Doyles Lime Services Pty Ltd

Formal Assessment Status: Active

Last Updated: May 17, 2019

Assessment Number: 2095

Current status: Environmental Scoping Document approved


Pivot Irrigation System Research

Type: Proposals

Proponent: Kelliher Bros.

Formal Assessment Status: Active

Last Updated: April 15, 2019

Assessment Number: 2202

Current status: Decision on whether to assess has been published


Remediation of Lot 20 Adelaide Street Hazelmere

Type: Proposals

Proponent: Wasterock Pty Ltd; Hazelland Pty Ltd

Formal Assessment Status: Active

Last Updated: February 25, 2019

Assessment Number: 2196

Current status: Decision on whether to assess has been published


Esperance Waste Management Facility

Type: Proposals

Proponent: Shire of Esperance

Formal Assessment Status: Active

Last Updated: December 13, 2018

Assessment Number: 2152

Current status: Environmental Scoping Document approved


Downstream Processing Chemical Production Facility

Type: Proposals

Proponent: Wesfarmers Chemicals Energy & Fertilisers Limited

Formal Assessment Status: Active

Last Updated: December 3, 2018

Assessment Number: 2185

Current status: Decision on whether to assess has been published


Gogo Station Irrigated Agricultural Development

Type: Proposals

Proponent: Gogo Station Pty Ltd

Formal Assessment Status: Active

Last Updated: September 6, 2018

Assessment Number: 2134

Current status: Environmental Scoping Document approved


Proposed Extension of Existing Transport Depot, Lot 14 (No 1527) Great Northern Highway, Upper Swan

Type: Proposals

Proponent: Mr Adrian Brajkovich

Formal Assessment Status: Active

Last Updated: January 22, 2018

Assessment Number: 2142

Current status: Decision on whether to assess has been published


Ashburton Salt Project

Type: Proposals

Proponent: K + S Salt Australia Pty Ltd

Formal Assessment Status: Active

Last Updated: August 18, 2017

Assessment Number: 2101

Current status: Public Environmental Review document in preparation


Gravel Mining at Scrivener Road Reserve Serpentine

Type: Proposals

Proponent: Shire of Serpentine Jarrahdale

Formal Assessment Status: Active

Last Updated: April 10, 2017

Assessment Number: 2084

Current status: Decision on whether to assess has been published


Bunbury Port Inner Harbour Structure Plan

Type: Proposals

Proponent: Bunbury Port Authority

Formal Assessment Status: Active

Last Updated: November 22, 2016

Assessment Number: 1879

Current status: Public Environmental Review document in preparation


Koombana Bay Marine Strucures

Type: Proposals

Proponent: South West Development Commission

Formal Assessment Status: Active

Last Updated: June 26, 2015

Assessment Number: 2049

Current status: Public Environmental Review document in preparation


City of Swan Local Planning Scheme 17 Amendment 88

Type: Schemes

Proponent:

Formal Assessment Status:

Active

Last Updated: May 31, 2021

Assessment Number:

2295

Current status: Decision on whether to assess has been published


Shire of Exmouth Local Planning Scheme 4 Amendment 1

Type: Schemes

Proponent:

Formal Assessment Status:

Active

Last Updated: June 29, 2020

Assessment Number:

2209

Current status: Response to submission published


Shire of Mundaring Local Planning Scheme 4 Amendment 15

Type: Schemes

Proponent:

Formal Assessment Status:

Active

Last Updated: August 5, 2019

Assessment Number:

2213

Current status: Decision on whether to assess has been published


City of Kalamunda - Local Planning Scheme 3 - Amendment 98

Type: Schemes

Proponent:

Formal Assessment Status:

Active

Last Updated: February 22, 2019

Assessment Number:

2187

Current status: Decision on whether to assess has been published


City of Gosnells - Local Planning Scheme 6 - Amendment 166

Type: Schemes

Proponent:

Formal Assessment Status:

Active

Last Updated: December 21, 2018

Assessment Number:

2176

Current status: Decision on whether to assess has been published


City of Gosnells - Local Planning Scheme 6 - Amendment 169

Type: Schemes

Proponent:

Formal Assessment Status:

Active

Last Updated: December 21, 2018

Assessment Number:

2177

Current status: Decision on whether to assess has been published


Metropolitan Region Scheme Amendment 1344/57 Maida Vale Urban Precinct

Type: Schemes

Proponent:

Formal Assessment Status:

Active

Last Updated: October 29, 2018

Assessment Number:

2175

Current status: Decision on whether to assess has been published