ProjectProponent: FQM Australia Nickel Pty LtdProposal description: FQM Australia Nickel Pty Ltd proposes to change and expand its Ravensthorpe Nickel Operations near Bandalup Hill currently approved under Ministerial Statement 633 as follows: Expand Hale-Bopp mining operations by approximately 29 hectares into the Kunzea similis ssp. mediterranea Community Conservation Area. Revise the alignment of the infrastructure corridor between the Shoemaker-Levy ore body and the processing area. Incorporate neutralised tailings to the reject rocks used to backfill mine pits and re-establish hill topographies. Following the decision to assess this proposal, the EPA consented to a change to the proposal under s43A of the Environmental Protection Act 1986 as follows: Expanding disturbance of native vegetation around the already approved disturbance area at Shoemaker-Levy by 220 ha. Assessment Number: 2100Region: Great SouthernReferred under EP Act: s38Industry sector: NickelLast updated: May 26, 2022Current Status: Public Environmental Review period closed 1. ReferralComment on this referral: Changes to Ravensthorpe Nickel OperationsComment period: Tuesday, 13 September, 2016 to Wednesday, 21 September, 2016Referral documentation: Appendix A Referral Form.pdf (PDF, 442.06 KB) Appendix C Shoemaker Levy Corridor Flora and Vegetation Assessment (1).pdf (PDF, 29.84 MB) Appendix D Kunzea similis subsp. mediterranea CCA survey.pdf (PDF, 3.77 MB) Appendix E Kunzea similis Regional Search.pdf (PDF, 3.42 MB) Appendix G Assessment of Conservation Status Against IUCN Red List Criteria.pdf (PDF, 2.25 MB) 2. Decision on whether to assess this proposalChair's Determination: Assess - Public Environmental ReviewExtract of determination: Chairman's Determination - Changes to Ravensthorpe Nickel Operations (PDF, 224.06 KB)Preliminary Environmental Factors: Flora and VegetationTerrestrial FaunaDate published: Monday, 24 October, 2016 3. AssessmentScopingEnvironmental scoping document: ESD - Ravensthorpe Nickel Operations Revised Proposal (PDF, 1.12 MB)Approved: Thursday, 30 March, 2017 Environmental ReviewPublic submissions: Monday, 11 April, 2022 to Thursday, 26 May, 2022Make a submission: Ravensthorpe Nickel Project Revised Proposal - Public Environmental ReviewEnvironmental Review documentation: FQMAN Ravensthorpe Nickel Project Environmental Review Document.pdf (PDF, 76.9 MB) Appendix A - Environmental Scoping Document.pdf (PDF, 1.21 MB) Appendix B - Proposed Update to Ministerial Statement 633 and Draft Ministerial Statement.PDF (PDF, 6.21 MB) Appendix C - Mine Closure Strategy.pdf (PDF, 6.17 MB) Appendix D - Flora and Vegetation Management Plan.pdf (PDF, 5.35 MB) Appendix E - Flora and Vegetation Studies v1.pdf (PDF, 75.77 MB) Appendix F - Fauna Management Plan.pdf (PDF, 13.25 MB) Appendix G - Fauna Studies_v1.pdf (PDF, 47.12 MB) Appendix H - Likelihood of Occurrence Priority Species.pdf (PDF, 180.2 KB) Appendix I - Likelihood of Occurrence MNES Species.pdf (PDF, 267.34 KB) Appendix J - Geochemical Studies.pdf (PDF, 53.11 MB) Appendix K - Hydrogeological Studies.pdf (PDF, 56.21 MB) Appendix L - GHGMP.pdf (PDF, 1.55 MB) Appendix M - Offset Calculations.pdf (PDF, 173.23 KB) Appendix N - Threat Abatement Plans.pdf (PDF, 236.09 KB)Date Published (Environmental Review documentation): April 11, 2022 Change to proposal during assessment under s. 43A s. 43A notice: Ravensthorpe Nickel Project Revised Proposal - s43A Notice (PDF, 281.55 KB) s43A Change to Proposal - Statement of Reasons (PDF, 195.15 KB) CMS16224 - S43A Notice - 190421.pdf (PDF, 1.38 MB) S43A Notice - 140623.pdf (PDF, 447.05 KB)Date of approval s. 43A: Wed, 14/06/2023