Last updated: January 18, 2021
Doral Mineral Sands Pty Ltd is proposing to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 453.34 hectares within a development envelope of 924.8 hectares. The majority of... Read more...Last updated: January 18, 2021
The Proposal is to develop a new bridge with a single lane dual carriage road and dual use path over the Preston River, to Turkey Point, Bunbury, Western Australia. The Proposal requires a disturbance footprint of 9.59 ha within the overall Proposal Development Envelope (DE) of 11.34 ha. Subtropical Temperate Coastal Saltmarsh Threatened Ecological Community (VT03 and VT04) is present within the Proposal DE and will require clearing of approximately 1.36 ha. 1.22 ha has been identified as... Read more...Last updated: January 14, 2021
OZ Minerals Musgrave Operations Pty Ltd propose to develop the West Musgrave Copper and Nickel Project, located in the West Musgrave Ranges of Western Australia, approximately 1,300 km north-east of Perth near to the intersection of the borders between Western Australia, South Australia and the Northern Territory. The nearest towns include the Indigenous Communities of Jameson (Mantamaru) 26 km north, Blackstone (Papulankutja) 50 km east, and Warburton (Milyirrtjarra) 110 km west of the ... Read more...Last updated: January 11, 2021
The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: January 6, 2021
The Public Transport Authority (PTA) proposes to construct and operate 8 km of new railway (including dual tracks and associated rail infrastructure), between Armadale and Byford. The proposal includes modification to the existing Armadale Station and construction and operation of a new station at Byford. The proposal includes the replacement of level crossings with grade separated crossings, either road over rail or rail over road. The proposal involves clearing of up to 50 hectares (ha) of... Read more...Last updated: January 4, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: January 4, 2021
Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...Last updated: January 4, 2021
Hamersley Iron Pty Limited propose to develop above and below water table iron ore deposits and associated infrastructure at Western Turner Syncline. The proposal also includes an infrastructure corridor connecting the mining operation to the existing Tom Price mine ore-processing facilities. Surplus water from mining below water table would be managed by use on site and controlled discharge to the environment. Clearing of up to 750 ha would be required. The proposal is located 20 km west of... Read more...Last updated: January 4, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: December 23, 2020
Changes to condition 11 Offsets following a change to proposal after assessment Read more...Last updated: December 23, 2020
Changes to condition 13 Offsets following a change to proposal after assessment. Read more...Last updated: December 21, 2020
The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 100,000 cubic metres from the berth pocket and entrance channel of the port to restore navigable depths. The berth pocket dredge area is surrounded by, but excised from, the... Read more...Last updated: December 21, 2020
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: December 21, 2020
Yara Pilbara Fertilisers Pty Ltd propose to modify the existing Pilbara Fertiliser project to include the development of a Renewable Hydrogen Plant and associated infrastructure. The proposal is located approximately 11 km north-west of Karratha in the Pilbara region of Western Australia. The proposal is adjacent to the National Heritage listed area and the Murujuga National Park. The proposal would include a total disturbance of 24.78 hectares. The proposal will result in reduction of... Read more...Last updated: December 15, 2020
The Public Transport Authority (PTA) proposes to construct and operate a new 13 kilometre (km) dual railway track between Malaga and Ellenbrook. The proposed Malaga to Ellenbrook extends from the proposed Bayswater to Malaga railway line. The proposal includes three new stations at Malaga, Whiteman Park and Ellenbrook with intermodal rail, bus, carpark and active mode (cycling and walking) facilities at each station. A potential future station is also proposed at Bennett Springs and rail... Read more...Last updated: December 14, 2020
The Commissioner of Main Roads Western Australia is proposing to construct and operate the northern section and upgrade the central section of the Bunbury Outer Ring Road (BORR). The proposal includes 19km of freeway-standard dual carriageway and associated interchanges between Forrest Highway and Boyanup-Picton Road (northern section) and between Boyanup-Picton Road and South West Highway (central section). The proposal would require the clearing of up to 73 hectares of native vegetation... Read more...Last updated: December 14, 2020
Delete conditions 8-4, 8-5, 8-6, 8-7 (Marine Wastewater Outfall) relating to the management of the marine wastewater outfall for the desalination plant. Amend condition 8-8 to remove reference to conditions 8-4 and 8-5. Read more...Last updated: December 10, 2020
The City of Canning proposes to extend Southern Link Road by 0.45 kilometres to provide a connection between Grey Street and Gerard Street. The proposal is aligned along the eastern boundary of Carousel Swamp; a Conservation Category Wetland which contains the Shrublands and Woodlands on Muchea Limestone Swan Coastal Plain Threatened Ecological Community. The total extent of the proposed development envelope is 1.15 ha. Read more...Last updated: December 4, 2020
Energy Resources Ltd proposes to undertake 3D (Romanesque) and 2D (Black Cormorant) seismic acquisition surveys to map the subsurface geology of an area within petroleum exploration permits EP 389 (R4), EP 440 (R1), and petroleum production licences L 18 and L 19. The proposal is located within the Shire of Gingin. The Romanesque 3D seismic acquisition survey comprises of 594 line kilometres of seismic lines plus 72 line kilometres of contingent lines. The Black Cormorant 2D seismic... Read more...