Geraldton Port Maximisation Project

Project
Proposal description

The Mid West Ports Authority is proposing marine infrastructure upgrades at the Port of Geraldton. The Proposal has a disturbance footprint of up to 38 hectares (ha), of which 17 ha is a new footprint and 21 ha the existing port, within a 75 ha development envelope.

The Proposal is a significant amendment to the Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment (Original Proposal) (Ministerial statement 600), and consists of:

  • dredging and land reclamation using dredge spoil.
  • installation of a breakwater extending north from the existing port footprint.
  • Marine infrastructure includes:

  • new wharf deck related to new Berth 1 (relocated) and Berth 8/9.
  • extension of the existing Berth 6 wharf.
  • new (relocated) tug harbour.
  • Implementation of the Proposal does not result in a throughput increase.

    Assessment Number
    2488
    Region
    Referred under EP Act
    s38
    Industry sector
    Last updated
    Current Status
    Ministerial Statement published
    1. Referral
    2. Decision on whether to assess this proposal
    Date published
    3. Assessment
    Request for further information
    Environmental Review
    4. EPA Report on assessment
    EPA Report Number
    1792
    Date published
    Appeals close
    5. Decision on proposal and implementation of proposal
    Ministerial Statement
    Date of approval
    Get notified of updates and new content

    Login to Subscribe to this page | Subscription Info

    Printer Friendly, PDF & Email