This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: August 11, 2025
Pilbara Iron Company (Services) Pty Ltd, a member of the Rio Tinto group of companies, has developed a strategic proposal to facilitate future development throughout the East Pilbara over the next 80 years. The key components include: • new above and below water table mining, and expansions to existing mines • associated mining activities and infrastructure which commonly includes crushers, conveyors, ore processing facilities (wet and dry), waste rock landforms, stockpiles, tailings storage... Read more...Last updated: August 7, 2025
The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup... Read more...Last updated: August 4, 2025
Time limit for substantial commencement and review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for the relevant environmental factors. Read more...Last updated: August 4, 2025
The proposal is for the continuation and expansion of existing operations at the Newmont Boddington Mine which is located approximately 12km northwest of Boddington and 130km southeast of Perth. The proposal is a significant amendment to the existing proposal approved under Ministerial Statement 971 and comprises additional footprint for the safe construction and operation of the future tailings dam RDA2. The proposal also includes a range of other activities including but not limited to... Read more...Last updated: August 4, 2025
Karara Mining Limited is seeking to revise its existing Karara Iron Ore Mine, located 320 km north-northeast of Perth in the Midwest Region of Western Australia. The revised proposal includes additional ground disturbance to support the revised Life of Mine strategy, including a revised development envelope, extension of the tailings storage facility and waste rock landform, incorporation of the areas previously approved under the Mungada Iron Ore Project (MIOP) (MS 806) and areas required for... Read more...Last updated: August 4, 2025
The Ridley Magnetite Project (the Proposal) is located approximately 57 km east of Port Hedland. The Proposal is located within a 19,102 ha Development Envelope (DE) with an indicative disturbance footprint (IF) of 8,484 ha. The Proposal is for the mining and processing of iron ore to produce up to 16.5 million tonnes per annum (Mtpa) of magnetite concentrate. The Proposal includes a single pit (below water table), run-of-mine pad, concentrate stockpiles, laydown areas, waste dumps,... Read more...Last updated: July 30, 2025
Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...Last updated: July 22, 2025
The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...Last updated: July 21, 2025
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: July 9, 2025
Changes to condition 9 in order to remove prescriptive rehabilitation criteria related to the rehabilitation of the proposal. Read more...Last updated: July 7, 2025
Amendment of time limit for substantial commencement and review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for the relevant environmental factors Read more...Last updated: July 7, 2025
Horizon Power proposes to construct and operate the Derby Future Energy System (FES) for energy supply to the town of Derby within the Kimberley region of Western Australia. The proposal comprises ground-mounted solar photovoltaic (PV) system up to 21 megawatts (MW), battery energy storage systems (BESS) up to 10 MW, a new thermal power station up to 8 MW, and a transmission network connection route. The thermal power station will be installed adjacent to the existing power station on Broome... Read more...Last updated: July 4, 2025
Conditions 6-12, 9-1 to 9-5 inclusive, and 12-1 to 12-8 inclusive of Ministerial Statement 873 are to be removed from the statement and conditions 9-1 to 9-5 inclusive and conditions 12-1 to 12-8 inclusive are to be transferred into a new ministerial statement. The change will facilitate the transfer of conditions relevant to the operation of port facilities from Chevron Australia Pty Ltd to the Pilbara Ports Authority via this new Ministerial Statement. Read more...Last updated: June 30, 2025
De Grey Mining Ltd proposes to construct and operate the Hemi Gold Project (the Project) located approximately 85 km south of Port Hedland, in the Pilbara Region of WA. The Project involves the excavation of open pits, mine dewatering, surplus water management including reinjection and controlled discharge. Associated supporting infrastructure includes an integrated waste landform tailings storage facility, waste rock landforms, low-grade stockpiles, airstrip, accommodation village, sealed... Read more...Last updated: June 30, 2025
Simcoa Operations Pty Ltd is proposing to establish a new quartzite mine approximately 15 km north of Moora, in the Wheatbelt region of Western Australia, and 2 km north of the existing mine. The proposal will include the establishment of an above groundwater mine pit, waste rock landform, infrastructure corridor and associated infrastructure. Quartzite would be trucked to Simcoa’s existing smelter in the Kemerton Strategic Industrial Area 17 km north-east of Bunbury. It is anticipated the... Read more...Last updated: June 30, 2025
The Department of Transport is proposing to build a new boating facility about 300 metres south of Tantabiddi Creek, located in the Ningaloo Marine Park, the Jurabi Coastal Park and the Ningaloo Coast National and World Heritage Areas, near Exmouth. The proposed new facility would replace the existing boat ramp at Tantabiddi Creek, and involves: dredging of the harbour basin and entrance channel land reclamation and vegetation clearing construction of breakwaters, revetments, boat ramps,... Read more...Last updated: June 26, 2025
Crimson Metals Pty Ltd is proposing to develop the Mount Gibson Gold Project, located approximately 280 km northeast of Perth and less than 10 km east from the Great Northern Highway, in the Avon Wheatbelt region of Western Australia. Substantial mining occurred in the 1980’s and 1990’s and as a result, historical disturbance and infrastructure remain in the area. The proposal encompasses the re-opening and enlargement of existing open cut mines, utilisation of existing infrastructure where... Read more...Last updated: June 26, 2025
Smiths 2014 Pty Ltd proposes to develop Lot 4131 Smiths Beach Road, Yallingup (City of Busselton) into a coastal tourism village, including: Hotel accommodation and wellness centre Campground 61 holiday homes Community hub, café, bakery and general store Cape to Cape welcome centre Surf Lifesaving Club facilities The proposal is located at the southern end of Smiths Beach, adjacent to the Leeuwin-Naturaliste National Park. The total proposed development envelope is 41.79 hectares (ha). The... Read more...Last updated: June 25, 2025
Robe River Mining Co. Pty Ltd. (the proponent) propose to develop new above and below water table iron ore mine pits and associated infrastructure to sustain existing West Angelas operations. The proposal is located approximately 130 kilometres northwest of Newman in the Pilbara region of Western Australia. The proposal will involve clearing of an additional 7,200 hectares (ha) of native vegetation (in addition to the 12,205 ha currently authorised under Ministerial Statement 1113) within a... Read more...Last updated: June 23, 2025
Tronox Management Pty Ltd are proposing to expand the existing Cooljarloo Mineral Sands Project by mining a satellite pit named Osprey. The project is located approximately 20 kilometres northwest of Cataby. The Osprey Expansion has a disturbance footprint of 61 hectares (ha) of which 59.14 ha is native vegetation. Dredge mining will be used to avoid pit dewatering. Water for mining and concentrating will be sourced from existing licenced bores. The final mine void will be backfilled above the... Read more...