Ietto Farms proposes to extract sand and limestone from Lots 1498 and 1504 Finn Road, Myalup in the Shire of Harvey. The original extractive industry licence for this proposal expired in July 2014. The proposal would extract sand and limestone from the site, to facilitate road construction projects throughout the southwest of Western Australia. The proposal is located adjacent to Lake Preston, a conservation category wetland and RAMSAR listed wetland. The proposal would require the clearing of... Read more...Last updated: September 28, 2021
Busselton Jetty Incorporated is proposing to construct and operate an underwater observatory, the Australian Underwater Discovery Centre (AUDC) at the existing Busselton Jetty, Busselton, south-west Australia. The proposal includes the towing of the pre-fabricated AUDC by vessel approximately 100 nautical miles, underwater debris removal, piling activities, installation of the AUDC and installation of a pre-fabricated modular building on the jetty. Piling works associated with the installation... Read more...Last updated: September 20, 2021
Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...Last updated: September 20, 2021
Pantoro South Pty Ltd propose to recommence operations of the Norseman Gold Project located adjacent to the town of Norseman, 200 kilometres (km) south of Kalgoorlie. The proposal involves extensions to existing mines and excavation of new open pits, associated mine dewatering, onsite ore processing and waste (tailings and waste rock) disposal and the construction of additional supporting infrastructure. The total disturbance footprint of the proposal is 590 hectares (ha), comprising 150 ha... Read more...Last updated: September 20, 2021
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: September 14, 2021
The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Read more...Last updated: September 14, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: September 13, 2021
Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...Last updated: September 9, 2021
Strike West Pty Ltd propose to undertake a three-dimensional (3D) seismic acquisition survey within permits EP368, EP426, EP469, EP320 and L22; and acquisition of 2D seismic data along a single east-west seismic line within EP320 to tie into the existing Munganooka well. The proposal is located within the Shires of Three Springs, Irwin and Mingenew in the Wheatbelt region of Western Australia. The proposal comprises a disturbance footprint of 919.11 linear kilometres within a development... Read more...Last updated: September 6, 2021
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: September 1, 2021
Kimberley Agricultural Investment (KAI) Pty Ltd proposes to develop 3086 hectares of land for the purposes of perennial and annual cropping, including grains, cotton and horticulture (which may include citrus and/or mango trees or other tree crops). The proposal is located between House Roof Hill and the Ord River, approximately 40 kilometres north-west of Kununurra, in the Shire of Wyndham-East Kimberley. Carlton Plains Stage 1 forms the initial component of the staged development of four... Read more...Last updated: September 1, 2021
The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: August 31, 2021
Digital 4 Pty Ltd proposes to develop Lot 802 Erindale Road Hamersley for urban development. Clearing of native vegetation will also occur within the western portion of Lot 803 to establish an Asset Protection Zone to meet requirements for bushfire management. The urban development will include residential development, internal public road network, public open space, a conservation area, drainage swales/basins and sewer easements. The development envelope for the proposal is 13.55 hectares. The... Read more...Last updated: August 24, 2021
The Proposal is for the above and below water table mining of iron ore from five open cut pits, located approximately 30 km north of Nullagine. The Proposal includes the development of mine pits and associated infrastructure including but not limited to crushing and screening facilities, waste landforms, run of mine pad, access roads, solar field, administration, accommodation camp, stockpile and laydown areas, borrow pits, groundwater bores and transfer infrastructure, explosives magazine,... Read more...Last updated: August 24, 2021
Image Resources NL is seeking to develop a mineral sands project, located at Nambung, approximately 170 kilometres (km) north of Perth and 18 km east of Cervantes, in the Wheatbelt region of WA. The proposal includes the progressive development of mine pits, processing facilities, groundwater bores and water management infrastructure, temporary waste dumps, solar drying ponds and associated infrastructure. The proposal would require the clearing of up 320 hectares of native vegetation. Read more...Last updated: August 19, 2021
Ocean Hill Pty Ltd propose to undertake a three-dimensional (3D) seismic acquisition survey within petroleum exploration permits EP495, EP454 and EP320 in the Midwest region of Western Australia. The proposal comprises a disturbance footprint of 801.91 hectares (ha) within a development envelope of 28,203.54 ha. A total of 113.52 ha of native vegetation would require clearing within the disturbance footprint. Following completion of proposed activities, seismic access tracks would be... Read more...Last updated: August 16, 2021
The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...Last updated: August 11, 2021
The Proposal would include the following activities: shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds trunkline installation (about 32.7 kilometres long within State waters) shore crossing site reinstatement rock... Read more...Last updated: August 9, 2021
The Banksia Road Landfill is located in the Shire of Dardanup approximately 10 kilometres (km) from the City of Bunbury and 3.8 km south-east of the town of Dardanup. The Landfill is currently operating under a Licence issued through Part V of the Environmental Protection Act (Licence - L8904/2015/1) which allows for the acceptance of Liquid Waste; and Class II and Class III putrescible waste. The proposal would be a continuation of the current operations and including the establishment of... Read more...