This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: October 25, 2021
Kimberley Technology Solutions Pty Ltd is referring the Cockatoo Island Multi-User Supply Base to develop an upgraded airfield, a wharf and an aftermarket subsea workshop as well as other related support infrastructure. The proposal is located on Cockatoo Island in the Shire of Derby. The proposal would include a loss of 0.54 hectares (ha) of hard coral and algae of which 0.3 ha is very sparse hard coral. The proposed new wharf would run parallel to the shoreline. The impacts to terrestrial... Read more...Last updated: October 21, 2021
The proponent, Shark Bay Resources Pty Ltd, operates two solar salt fields and an associated port facility at Useless Loop in the Shark Bay area of Western Australia. The site is located approximately 25 kilometres west southwest of Denham. The proponent is proposing to undertake maintenance and capital dredging of up to 80,000 cubic metres from the entrance channel of the port and seabed levelling of 10,000 cubic metres in the berth pocket to restore navigable depths. The development envelopes... Read more...Last updated: October 20, 2021
The proposal is to construct and operate a railway of approximately 320 kilometres length and associated infrastructure to transport iron ore from the Roy Hill 1 Iron Ore Mining Project Stages 1 and 2 to facilities at Port Hedland. Read more...Last updated: October 18, 2021
Lot 902 Flynn Drive Neerabup is 22.03 hectares (ha) hectares (ha) in size, and is proposed to be subdivided into two lots; one conservation lots of 8.01 ha and a balance 14.02 ha lot for future industrial development with clearing and earthworks. The proposal is within Bush Forever Site 295, and fully vegetated. Read more...Last updated: October 4, 2021
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines and... Read more...Last updated: September 28, 2021
The proposal is to develop an additional small satellite nickel deposit at New Morning. The project is located within the Shire of Kondinin, approximately 80 kilometres east of Hyden. The proposal includes development of the New Morning deposit, waste dump, ROM pad, transport and infrastructure corridors. The proposal would require a maximum clearing extent of 29 hectares of native vegetation within a 64.5-hectare development envelope. The proposed life of mine is 2- 3 years. Read more...Last updated: September 28, 2021
Ietto Farms proposes to extract sand and limestone from Lots 1498 and 1504 Finn Road, Myalup in the Shire of Harvey. The original extractive industry licence for this proposal expired in July 2014. The proposal would extract sand and limestone from the site, to facilitate road construction projects throughout the southwest of Western Australia. The proposal is located adjacent to Lake Preston, a conservation category wetland and RAMSAR listed wetland. The proposal would require the clearing of... Read more...Last updated: September 28, 2021
Busselton Jetty Incorporated is proposing to construct and operate an underwater observatory, the Australian Underwater Discovery Centre (AUDC) at the existing Busselton Jetty, Busselton, south-west Australia. The proposal includes the towing of the pre-fabricated AUDC by vessel approximately 100 nautical miles, underwater debris removal, piling activities, installation of the AUDC and installation of a pre-fabricated modular building on the jetty. Piling works associated with the installation... Read more...Last updated: September 20, 2021
Pantoro South Pty Ltd propose to recommence operations of the Norseman Gold Project located adjacent to the town of Norseman, 200 kilometres (km) south of Kalgoorlie. The proposal involves extensions to existing mines and excavation of new open pits, associated mine dewatering, onsite ore processing and waste (tailings and waste rock) disposal and the construction of additional supporting infrastructure. The total disturbance footprint of the proposal is 590 hectares (ha), comprising 150 ha... Read more...Last updated: September 14, 2021
The Warrawoona Gold Project, located approximately 20km south of Marble Bar, will abstract ore from an open pit and underground mine at the Klondyke deposit as well as a cutback of the existing Copenhagen pit. Ore will be processes at around 2Mtpa at Klondyke. The project will produce gold bar and gold concentrate and is expected to operate for approximately six years. The proposal would include a total disturbance of 398 hectares. Read more...Last updated: September 14, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: September 13, 2021
Alinta Energy (subsidiary of Alinta DEWAP Pty Ltd) currently owns and operates the existing Port Hedland Power Station (PHPS) located within the Boodarie Strategic Industrial Area approximately 12 km south of the Port Hedland town centre and approximately 5 km west of South Hedland, ., The Proposal utilises new technologies providing more energy efficient and reliable power to customers in the Port Hedland area. This will include the installation of a 60 Megawatts (MW) natural gas fuelled... Read more...Last updated: September 9, 2021
Strike West Pty Ltd propose to undertake a three-dimensional (3D) seismic acquisition survey within permits EP368, EP426, EP469, EP320 and L22; and acquisition of 2D seismic data along a single east-west seismic line within EP320 to tie into the existing Munganooka well. The proposal is located within the Shires of Three Springs, Irwin and Mingenew in the Wheatbelt region of Western Australia. The proposal comprises a disturbance footprint of 919.11 linear kilometres within a development... Read more...Last updated: September 1, 2021
Kimberley Agricultural Investment (KAI) Pty Ltd proposes to develop 3086 hectares of land for the purposes of perennial and annual cropping, including grains, cotton and horticulture (which may include citrus and/or mango trees or other tree crops). The proposal is located between House Roof Hill and the Ord River, approximately 40 kilometres north-west of Kununurra, in the Shire of Wyndham-East Kimberley. Carlton Plains Stage 1 forms the initial component of the staged development of four... Read more...Last updated: September 1, 2021
The proposal is an expansion of the existing Sino Iron Project approved under Ministerial Statement 635 (as amended). The proposal is required to accommodate continuation of mine operations associated with the existing two billion tonnes mining rights afforded to Sino Iron and Korean Steel in accordance with existing commercial agreements. It includes the expansion of the mine pit, waste dumps and Tailings Storage Facilities. The proposed mine pit expansion will increase in depth from 220 m to... Read more...Last updated: September 1, 2021
The proposal is for the construction and operation of a gas processing plant, onshore supply gas pipeline, onshore sales gas pipeline, and horizontal directionally drilled shore crossing. Read more...Last updated: August 31, 2021
Digital 4 Pty Ltd proposes to develop Lot 802 Erindale Road Hamersley for urban development. Clearing of native vegetation will also occur within the western portion of Lot 803 to establish an Asset Protection Zone to meet requirements for bushfire management. The urban development will include residential development, internal public road network, public open space, a conservation area, drainage swales/basins and sewer easements. The development envelope for the proposal is 13.55 hectares. The... Read more...Last updated: August 24, 2021
Image Resources NL is seeking to develop a mineral sands project, located at Nambung, approximately 170 kilometres (km) north of Perth and 18 km east of Cervantes, in the Wheatbelt region of WA. The proposal includes the progressive development of mine pits, processing facilities, groundwater bores and water management infrastructure, temporary waste dumps, solar drying ponds and associated infrastructure. The proposal would require the clearing of up 320 hectares of native vegetation. Read more...Last updated: August 19, 2021
Ocean Hill Pty Ltd propose to undertake a three-dimensional (3D) seismic acquisition survey within petroleum exploration permits EP495, EP454 and EP320 in the Midwest region of Western Australia. The proposal comprises a disturbance footprint of 801.91 hectares (ha) within a development envelope of 28,203.54 ha. A total of 113.52 ha of native vegetation would require clearing within the disturbance footprint. Following completion of proposed activities, seismic access tracks would be... Read more...Last updated: August 9, 2021
The original proposal is for mining of silica (quartzite) rock approximately 15 kilometres north of Moora on Mining Lease M70/191, and smelting to produce silicon, employing wood, charcoal, coal and the silica mined at Moora, in the Kemerton Industrial Area approximately 20 kilometres north of Bunbury in the Shire of Harvey. This revised proposal is for an increase from the approved three submerged electric arc furnaces to four submerged electric arc furnaces at the Kemerton site, and the... Read more...