The proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Inquiry under s46 to change conditions 6 and 8 of Ministerial Statement 873 . Read more...Last updated: January 22, 2013
Establishment of an Industrial Park at Meenaar 18 km east of Northam - Inquiry under s46 of the, Environmental Protection Act 1986, to remove the entire implementation conditions and proponent commitments of Ministerial Statement 293. Read more...Last updated: December 20, 2012
The proposal is for seven borrow pits in the Millstream Chichester National Park (MCNP) where up to 118 hectares (ha) will be disturbed, of which 90 ha is within the national park and the remainder in the excised rail corridor. All borrow pits within the MCNP are within existing Rio Tinto Iron Ore licence areas granted under the, Mining Act 1978, (Robe River Mining Company is a subsidiary of Rio Tinto) and all borrow material will only be used for projects or portions of projects that are... Read more...Last updated: August 1, 2011
The proposal is to increase the mine dewatering rate up to 50 Gigalitres per annum and to inject surplus water into two brackish and one saline injection zones at the Christmas Creek Mine. Read more...Last updated: May 23, 2011
The Environmental Protection Authority (EPA) has completed its assessment of the application to amend the Environmental Protection (Pinjar Gas Turbine Station Noise Emissions) Approval 2004 made by Verve Energy to the Minister for Environment on 8 February 2011, and which was referred to the EPA for assessment on 11 April 2011. Read more...Last updated: June 2, 2011
Inquiry under s46 to amend condition 5-1 of Ministerial Statement 847 . Read more...Last updated: May 30, 2011
The proposal is to subdivide lots 1000, 2240, 2275, 2657 and 3045 Preston Beach Road, Lake Clifton. The proposal was withdrawn from the WAPC during the appeals process, thus no Ministerial decision was required. Read more...Last updated: October 8, 2018
The Proposal is to construct and operate a 25 million tonne per annum Liquefied Natural Gas (LNG) facility and associated Domestic Gas (Domgas) facility in the proposed Ashburton North Strategic Industrial Area (ANSIA) 12 kilometres south west of the town of Onslow. Read more...Last updated: June 30, 2011
The proposal is to expand existing wharf facilities to increase storage capacity and improve the efficiency of Dampier's port in general. The expansion involves the construction of a land-backed wharf, 300m jetty, lay down areas, access road and associated infrastructure. The wharf and lay down area would be constructed using reclaimed material from the dredging required to improve the approach and berthing channels. Read more...Last updated: September 11, 2013
The Brockman 2 Detrital Iron Ore Mine (B2 Project) commenced mining operations in 1992 in the central Pilbara region of Western Australia. It is located in the Brockman Syncline area, approximately 55 kilometres (km) northwest of Tom Price. Ore from the mine is currently exported through Dampier and Cape Lambert ports. This proposal is for the Phase 2B development of the B2 Project and involves further development of parts of the existing Pit 4 Extension, Lower Pit 4, Valley Pit and Pit 6 to an... Read more...Last updated: August 28, 2012
The proposal is to construct and maintain a 45 kilometre (km) coastal walk trail from Point Ann to Hamersley Inlet, through the Wilderness Management Zone of the Fitzgerald River National Park. Camping facilities such as sleeping huts, water collection facilities and toilets would be constructed at camping points along the walk trail. The proposal would also require vehicle access tracks for ongoing maintenance of the walk trail, camping facilities, and emergency response. Read more...Last updated: November 1, 2012
The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...Last updated: September 13, 2011
Koolyanobbing Iron Ore Expansion - proposal under s46 to remove condition 7 of Ministerial Statement 627. Read more...Last updated: August 13, 2018
The proposal is to expand CSBP's Kwinana Ammonium Nitrate Production Facility (ANPF) by incorporating additional components into the existing facility and re-engineering (debottlenecking) some existing components in order to increase ammonium nitrate production capacity from 520,000 tpa to 936,000 tpa. Read more...Last updated: June 19, 2012
The proposal is to construct and operate approximately 70 km of duplicate rail line and supporting infrastructure from the Cape Lambert Port facilities to Emu Siding. Read more...Last updated: November 1, 2011
Proposal under section 46 of the, Environmental Protection Act 1986, to change condition 8-1 of Ministerial Statement 840. Read more...Last updated: June 26, 2020
The proposal is for the development and operation of the Parker Range Project, located in the Mount Caudan section of the Parker Range within the Shire of Yilgarn. It includes the development and operation of an above and below the watertable greenfields iron ore mine and associated infrastructure. An existing gazetted road (Parker Range Road) runs across the ore body. A gazetted bypass road would be required around the proposed mine site requiring approximately 10 ha of clearing. Ore from the... Read more...Last updated: January 9, 2012
The proposal consists of a designated mining area containing two open pits, integrated waste and tailings landform, ore beneficiating plant and workshops, a combined gas pipeline spur and water pipe corridor, a services (possible water, gas, power transmission) corridor to Weld Range, the Byro Sub-basin Borefield and the Murchison Palaeochannel Borefield, a power station, airstrip, village and ancillaries. The Jack Hills Expansion Project is contiguous with the Stage 1 mine. Read more...Last updated: August 19, 2016
The proposal includes an open-cut lead carbonate mine and processing facilities 30 kilometres west of the Wiluna townsite. The lead carbonate concentrate produced at the mine-site is transported in sealed bags within locked shipping containers by road from the mine-site to Leonora and then by rail to the Port of Fremantle where it is exported. Read more...