Last updated: March 2, 2021
APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...Last updated: March 2, 2021
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: February 15, 2021
RCMA Australia is proposing to drill one conventional oil exploration well to determine if there is oil in the prospect, located 11 kilometres (km) south of Dongara / Port Denison in the onshore Perth Basin, within the Beekeepers Nature Reserve. The proposal includes all activities associated with drilling a conventional oil exploration well including site preparation, equipment mobilisation, drill, case and cement, decommissioning, demobilisation, site restoration and rehabilitation. The ... Read more...Last updated: February 15, 2021
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare ... Read more...Last updated: February 10, 2021
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. Read more...Last updated: February 9, 2021
The Order of the Servants of Mary Incorporated proposes to develop Lot 9000 Wanneroo Road Sinagra for urban development. The urban development will include residential and commercial development, internal public road network, public open space, and drainage infrastructure. The development envelope for the proposal is 29.33 hectares, which includes 2.02 hectares conservation public open space. Read more...Last updated: February 8, 2021
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: February 1, 2021
The Minister has requested the EPA inquire into the question of whether the implementation conditions relating to Offsets in MS 1118 should be changed. The proponent has specifically requested: Amendment of wording of Condition 8-1 (3) to only refer to direct impacts to Ironcaps Banksia individuals. Removal of Condition 8-8 (4) and 8-8 (5), as these conditions refer to protection mechanisms and conservation reserves. Amend Conditions 8-7 to 8-12 to allow a rehabilitation based offset strategy,... Read more...Last updated: February 1, 2021
Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...Last updated: February 1, 2021
Change relates to requirements of condition 7 -1(1) and 7-1(3), and includes an update of Figure 4 and change to Schedule 2 to amend the spatial dataset to reflect the removal of Malleefowl Mound Exclusion Zone for MM23 referred to in condition 7-1(1) Amend conditions 8-1(4) and 8-8(2) to replace the reference to 6,957 individuals of Microcorys sp. Mt Holland (D.Angus DA2397) to 15.93 per cent of the regional population. This proposal was assessed in conjunction with assessment 2279. EPA Report... Read more...Last updated: February 1, 2021
Australian Potash Limited proposes to abstract brine resources to produce a sulfate of potash (SOP) product at the Lake Wells Potash Project. The proposal area is located on and adjacent to the Lake Wells Playa Lake system (salt lake terrain), approximately 160km north-northeast of Laverton in Western Australia. The proposal would include construction of an SOP processing plant, brine abstraction bores, evaporation ponds, raw water bore field, accommodation village and other associated... Read more...Last updated: February 1, 2021
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines... Read more...Last updated: February 1, 2021
Hastings Technology Metals Ltd propose to expand the existing approved Yangibana Rare Earths Project, a Rare Earth Elements mine which includes on site processing and associated infrastructure. The expansion involves mining from two additional pits (Yangibana and Auer) and one larger amalgamated pit (Bald Hill-Simon’s Find-Fraser’s). The proposal is located approximately 270 kilometres east-north-east of Carnarvon in the Shire of Upper Gascoyne. The proposal would include total disturbance of... Read more...Last updated: February 1, 2021
Peet Stratton Pty Ltd propose to develop the Lot 102 for urban uses as part of the wider Movida residential development. The proposal area is 8.6 hectares (ha) of which approximately 6ha is proposed for development. 2.65ha of native vegetation is proposed to be retained for conservation purposes. Read more...Last updated: January 28, 2021
The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...Last updated: January 25, 2021
Image Resources NL is seeking to develop a mineral sands project, located at Nambung, approximately 170 kilometres (km) north of Perth and 18 km east of Cervantes, in the Wheatbelt region of WA. The proposal includes the progressive development of mine pits, processing facilities, groundwater bores and water management infrastructure, temporary waste dumps, solar drying ponds and associated infrastructure. The proposal would require the clearing of up 320 hectares of native vegetation. Read more...Last updated: January 22, 2021
Tronox Management Pty Limited proposes to develop the Cooljarloo West Titanium Minerals Project, 30 kilometres west from Cervantes, Shire of Dandaragan. The proposal involves the dredge mining of three orebodies: Woolka, Harrier and Kestrel. The proposal will require movement of the mining dredge and ore processing plant (concentrator) from the existing Cooljarloo Mine to Cooljarloo West and back again via flotation across an open channel. Read more...Last updated: January 22, 2021
Changes to condition 11 Offsets following a change to proposal after assessment Read more...Last updated: January 22, 2021
Changes to condition 13 Offsets following a change to proposal after assessment. Read more...Last updated: January 18, 2021
Doral Mineral Sands Pty Ltd is proposing to develop and operate a mineral sands deposit approximately 11 kilometres southeast of Busselton. The proposal includes the development of mine pits and associated infrastructure, wet concentration processing plant, solar evaporation ponds, groundwater abstraction and water management infrastructure and process water pond. The proposal would include a total disturbance of 453.34 hectares within a development envelope of 924.8 hectares. The majority of... Read more...