Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • EPA Board Meetings
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • About compliance with Ministerial conditions
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
  • News Centre

Filter by industry sector:

  • Infrastructure (373) Apply Infrastructure filter
  • Land use (288) Apply Land use filter
  • Iron Ore (210) Apply Iron Ore filter
  • Industrial (138) Apply Industrial filter
  • Sand, rock, gravel and clay (102) Apply Sand, rock, gravel and clay filter
  • Oil and gas (96) Apply Oil and gas filter
  • Waste management (74) Apply Waste management filter
  • Mineral sands (66) Apply Mineral sands filter
  • Gold (52) Apply Gold filter
  • Clearing (46) Apply Clearing filter
  • Power generation (41) Apply Power generation filter
  • Utilities (29) Apply Utilities filter
  • Rare earth elements (28) Apply Rare earth elements filter
  • Nickel (27) Apply Nickel filter
  • Aquaculture (20) Apply Aquaculture filter
  • Salt (16) Apply Salt filter
  • Diamonds (11) Apply Diamonds filter
  • Coal (10) Apply Coal filter
  • Copper (9) Apply Copper filter
  • Lead (7) Apply Lead filter
  • Uranium (5) Apply Uranium filter
  • Bauxite (4) Apply Bauxite filter
  • Molybdenum (4) Apply Molybdenum filter
  • Lithium (2) Apply Lithium filter
  • Potash (2) Apply Potash filter
  • Manganese (1) Apply Manganese filter

Filter by current status:

  • Ministerial Statement published (1054) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (246) Apply Decision on whether to assess has been published filter
  • Minister determined that the proposal should not be implemented (57) Apply Minister determined that the proposal should not be implemented filter
  • Proposal withdrawn (20) Apply Proposal withdrawn filter
  • Assessment has been terminated under s40A of the EP Act (19) Apply Assessment has been terminated under s40A of the EP Act filter
  • Seven-day public comment period closed (17) Apply Seven-day public comment period closed filter
  • Environmental Scoping Document approved (14) Apply Environmental Scoping Document approved filter
  • EPA Report and Recommendations released - not appealable (12) Apply EPA Report and Recommendations released - not appealable filter
  • Awaiting Ministerial decision (11) Apply Awaiting Ministerial decision filter
  • Waiting for Minister to reject proposal under s45(8) (11) Apply Waiting for Minister to reject proposal under s45(8) filter
  • Public Environmental Review period closed (10) Apply Public Environmental Review period closed filter
  • EPA Report and Recommendations released - appeals closed (8) Apply EPA Report and Recommendations released - appeals closed filter
  • Response to submission published (7) Apply Response to submission published filter
  • EPA Report and Recommendations released - appeals open (6) Apply EPA Report and Recommendations released - appeals open filter
  • Public Environmental Review document in preparation (4) Apply Public Environmental Review document in preparation filter
  • Assessment on Proponent Information – public submission period closed (3) Apply Assessment on Proponent Information – public submission period closed filter
  • Appealed: Not yet determined (2) Apply Appealed: Not yet determined filter
  • Assessment on Proponent Information – Request for More Information published (2) Apply Assessment on Proponent Information – Request for More Information published filter
  • Environmental Review document open for public submissions (2) Apply Environmental Review document open for public submissions filter
  • Environmental Scoping Document - public submission period closed (2) Apply Environmental Scoping Document - public submission period closed filter
  • Minister's appeals determinations published (1) Apply Minister's appeals determinations published filter
  • Referred to EPA (1) Apply Referred to EPA filter

Filter by relevant environmental factors:

  • Flora and Vegetation (602) Apply Flora and Vegetation filter
  • Terrestrial Fauna (429) Apply Terrestrial Fauna filter
  • Social Surroundings (389) Apply Social Surroundings filter
  • Inland Waters Environmental Quality (323) Apply Inland Waters Environmental Quality filter
  • Hydrological Processes (290) Apply Hydrological Processes filter
  • Air Quality (246) Apply Air Quality filter
  • Terrestrial Environmental Quality (228) Apply Terrestrial Environmental Quality filter
  • Marine Environmental Quality (184) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (126) Apply Benthic Communities and Habitats filter
  • Subterranean Fauna (118) Apply Subterranean Fauna filter
  • Inland Waters (116) Apply Inland Waters filter
  • Marine Fauna (102) Apply Marine Fauna filter
  • Coastal Processes (72) Apply Coastal Processes filter
  • Landforms (54) Apply Landforms filter
  • Human Health (49) Apply Human Health filter
  • Greenhouse Gas Emissions (48) Apply Greenhouse Gas Emissions filter
  • People (44) Apply People filter
  • Water (9) Apply Water filter
  • Air (1) Apply Air filter
  • Land (1) Apply Land filter
  • Sea (1) Apply Sea filter

Filter by Proponent:

  • Water Corporation (37) Apply Water Corporation filter
  • Main Roads Western Australia (27) Apply Main Roads Western Australia filter
  • BHP Billiton Iron Ore Pty Ltd (21) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Hamersley Iron Pty Limited (19) Apply Hamersley Iron Pty Limited filter
  • State Energy Commission of Western Australia (14) Apply State Energy Commission of Western Australia filter
  • Water Authority of Western Australia (14) Apply Water Authority of Western Australia filter
  • Chevron Australia Pty Ltd (13) Apply Chevron Australia Pty Ltd filter
  • Cable Sands (WA) Pty Ltd (12) Apply Cable Sands (WA) Pty Ltd filter
  • LandCorp (12) Apply LandCorp filter
  • Worsley Alumina Pty Ltd (12) Apply Worsley Alumina Pty Ltd filter
  • Australian Gold Reagents Pty Ltd (10) Apply Australian Gold Reagents Pty Ltd filter
  • Fortescue Metals Group Limited (10) Apply Fortescue Metals Group Limited filter
  • Polaris Metals Pty Ltd (10) Apply Polaris Metals Pty Ltd filter
  • Hamersley Iron Pty Ltd (9) Apply Hamersley Iron Pty Ltd filter
  • Eastern Metropolitan Regional Council (8) Apply Eastern Metropolitan Regional Council filter
  • Iluka Resources Limited (8) Apply Iluka Resources Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (8) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Woodside Energy Ltd (8) Apply Woodside Energy Ltd filter
  • BHP Iron Ore Pty Ltd (7) Apply BHP Iron Ore Pty Ltd filter
  • Cliffs Asia Pacific Iron Ore Pty Ltd (7) Apply Cliffs Asia Pacific Iron Ore Pty Ltd filter
  • Main Roads WA (7) Apply Main Roads WA filter
  • Roy Hill Infrastructure Pty Ltd (7) Apply Roy Hill Infrastructure Pty Ltd filter
  • Alcoa of Australia Limited (6) Apply Alcoa of Australia Limited filter
  • API Management Pty Limited (6) Apply API Management Pty Limited filter
  • Department of Transport (6) Apply Department of Transport filter
  • Grange Resources Limited (6) Apply Grange Resources Limited filter
  • Roy Hill Iron Ore Pty Ltd (6) Apply Roy Hill Iron Ore Pty Ltd filter
  • Western Power Corporation (6) Apply Western Power Corporation filter
  • Alcoa of Australia Ltd (5) Apply Alcoa of Australia Ltd filter
  • Apache Northwest Pty Ltd (5) Apply Apache Northwest Pty Ltd filter
  • City of Busselton (5) Apply City of Busselton filter
  • Covalent Lithium Pty Ltd (5) Apply Covalent Lithium Pty Ltd filter
  • CSBP Limited (5) Apply CSBP Limited filter
  • Department of Marine and Harbours (5) Apply Department of Marine and Harbours filter
  • Forge Resources Swan Pty Ltd (5) Apply Forge Resources Swan Pty Ltd filter
  • Fortescue Metals Group Ltd (5) Apply Fortescue Metals Group Ltd filter
  • Health Department of Western Australia (5) Apply Health Department of Western Australia filter
  • Karara Mining Limited (5) Apply Karara Mining Limited filter
  • Kemerton Silica Sand Pty Ltd (5) Apply Kemerton Silica Sand Pty Ltd filter
  • Midland Brick Company Pty Ltd (5) Apply Midland Brick Company Pty Ltd filter
  • Minister for State Development (5) Apply Minister for State Development filter
  • Public Transport Authority (5) Apply Public Transport Authority filter
  • Public Transport Authority of Western Australia (5) Apply Public Transport Authority of Western Australia filter
  • Robe River Mining Co. Pty. Ltd (5) Apply Robe River Mining Co. Pty. Ltd filter
  • Simcoa Operations Pty Ltd (5) Apply Simcoa Operations Pty Ltd filter
  • Fortescue Metals Group (4) Apply Fortescue Metals Group filter
  • Image Resources NL (4) Apply Image Resources NL filter
  • New Energy Corporation Pty Ltd (4) Apply New Energy Corporation Pty Ltd filter
  • Southern Ports Authority (4) Apply Southern Ports Authority filter
  • Tronox Management Pty Ltd (4) Apply Tronox Management Pty Ltd filter

Filter by region:

  • Perth (462) Apply Perth filter
  • Pilbara (324) Apply Pilbara filter
  • South West (205) Apply South West filter
  • Mid West (135) Apply Mid West filter
  • Goldfields Esperance (100) Apply Goldfields Esperance filter
  • Peel (99) Apply Peel filter
  • Wheatbelt (90) Apply Wheatbelt filter
  • Kimberley (66) Apply Kimberley filter
  • Great Southern (50) Apply Great Southern filter
  • Gascoyne (46) Apply Gascoyne filter
  • Cocos Islands, Shire of (1) Apply Cocos Islands, Shire of filter

Filter by last updated:

  • 2023 (95) Apply 2023 filter
  • 2022 (89) Apply 2022 filter
  • 2021 (76) Apply 2021 filter
  • 2020 (83) Apply 2020 filter
  • 2019 (64) Apply 2019 filter
  • 2018 (42) Apply 2018 filter
  • 2017 (48) Apply 2017 filter
  • 2016 (89) Apply 2016 filter
  • 2015 (44) Apply 2015 filter
  • 2014 (37) Apply 2014 filter
  • 2013 (64) Apply 2013 filter
  • 2012 (51) Apply 2012 filter
  • 2011 (35) Apply 2011 filter
  • 2010 (18) Apply 2010 filter
  • 2009 (28) Apply 2009 filter
  • 2008 (13) Apply 2008 filter
  • 2007 (18) Apply 2007 filter
  • 2006 (22) Apply 2006 filter
  • 2005 (28) Apply 2005 filter
  • 2004 (16) Apply 2004 filter
  • 2003 (21) Apply 2003 filter
  • 2002 (34) Apply 2002 filter
  • 2001 (14) Apply 2001 filter
  • 2000 (26) Apply 2000 filter
  • 1999 (32) Apply 1999 filter
  • 1998 (24) Apply 1998 filter
  • 1997 (31) Apply 1997 filter
  • 1996 (28) Apply 1996 filter
  • 1995 (26) Apply 1995 filter
  • 1994 (37) Apply 1994 filter
  • 1993 (37) Apply 1993 filter
  • 1992 (85) Apply 1992 filter
  • 1991 (74) Apply 1991 filter
  • 1990 (35) Apply 1990 filter
  • 1989 (35) Apply 1989 filter
  • 1988 (45) Apply 1988 filter
  • 1987 (11) Apply 1987 filter
  1. Home
  2. Proposal search

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Carpenter’s Dam

Last updated: March 27, 2023

Red Moon Property Holdings Pty Ltd and property lessee Altera Ltd propose to construct and operate Carpenter’s dam taking water from 4-mile brook. The proposal is to construct a dam not exceeding 3,400,000 cubic metres in capacity which includes an automatic bypass system that allows at least 8, 000 kilolitres of water to bypass the dam with excess water returned to the original watercourse. The proposal is in Beedelup, WA, approximately 20 kilometres Southwest of Manjimup, adjacent to the... Read more...

Perth Surf Park

Last updated: March 7, 2023

PSP Properties Pty Ltd propose to develop and operate a surf park at Lots 800 and Lot 9001 Prinsep Road, and Lot 801 Knock Way, Jandakot (City of Cockburn). The proposal includes development of an open water surfing lagoon, accommodation, food and beverage venues, function centre and events space, skating facilities, and health and wellness facilities. The proposal site is 5.78 hectares (ha) and is bound by industrial use areas to the north and south, the Kwinana Freeway to the west and remnant... Read more...

Change of land use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations (Gnangara-Moore River State Forest, State Forest 65)

Last updated: March 7, 2023

The referred proposal is for a change in the use, purpose and condition of land within the Gnangara, Pinjar and Yanchep pine plantations from commercial pine plantation managed for the purpose of timber production to a combination of new uses, purposes and conditions other than pine plantations. The change in the use, purpose and condition of land occurs through the progressive harvesting of pine without replacement and post-harvesting land management. The change in the use, purpose and... Read more...

Mulga Downs Hub and Rail Spur

Last updated: March 7, 2023

The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...

Thornlie-Cockburn Link (S46) [2333]

Last updated: February 28, 2023

Changes to condition 13-1 and 13-3 of Ministerial Statement 1114 (as amended) following a change to proposal after assessment. Read more...

Rafael Seismic Survey

Last updated: February 23, 2023

Buru Energy Ltd propose to undertake a 2D an d 3D geological survey at one site (Rafael patch) in the west Kimberley district, approximately 80 kilometres south of Derby. The proposal would include total disturbance of up to 438 hectares by raised blade clearing of 1147 km of seismic lines and construction of a temporary workers camp within an existing cleared well site. Read more...

Garden Street Extension, Southern River

Last updated: February 20, 2023

The City of Gosnells (the Proponent) proposes to extend Garden Street between Harpenden Street and Holmes Street in Southern River, which will involve the construction of an 840 m section of a dual carriageway (two lanes each direction). The Proposal is located predominantly within the suburb of Southern River, approximately 17 km south-east of Perth Central Business District (CBD) and intersects within Bush forever site 125 (Holmes Street Bushland). The construction and implementation of the... Read more...

Project Haber

Last updated: February 20, 2023

Project Haber Pty Ltd proposes to construct and operate a 1.4 million tonnes per annum (Mtpa) urea plant in East Arrowsmith (South Erregulla). The proposal is located approximately 280 km north of Perth and 45 km south east of Dongara, in the Shire of Three Springs. The urea plant comprises of an Air Separation Unit (ASU) producing nitrogen, oxygen and hydrogen for various processes; an ammonia synthesis unit; and a granulation and urea production unit. Supporting infrastructure includes gas... Read more...

Bunbury Outer Ring Road (Southern Section)

Last updated: February 15, 2023

Main Roads Western Australia is proposing to construct and operate the southern section of the Bunbury Outer Ring Road (BORR). The proposal includes 10.5 km of freeway-standard dual carriageway, 3 km of rural distributor roads and other associated road-infrastructure. The BORR southern section will connect to the proposed northern and central sections of BORR near South West Highway, which together will complete a bypass around Bunbury City from Forest Highway to Bussell Highway. The BORR... Read more...

Gnarabup Tourism Development – Resort and Beach Village

Last updated: February 10, 2023

Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and commercial premises. The proposal development envelope is 8.11 hectares. The proposal is located on the western side of Wallcliffe Road, Gnarabup Beach. Following the seven day public comment period and consideration... Read more...

Tonkin Highway Grade Separated Interchanges (Hale Road and Welshpool Road)

Last updated: February 2, 2023

The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...

Bidaminna Project

Last updated: January 23, 2023

Image Resources NL proposes to develop a mineral sands extraction project south of Orange Springs Road, Cowalla (Shire of Gingin). The proposal includes progressive and linear dredge mining of the sand resource operating over a 10-year period and the development of temporary waste dumps and tailings storage, processing facilities, solar drying ponds, water supply infrastructure and associated supporting infrastructure. The proposed mine disturbance area is approximately 950 hectares (ha) within... Read more...

Yardie Creek Road Realignment Project

Last updated: January 18, 2023

The proposal is to realign a 2 - 3 kilometre (km) section of Yardie Creek Road, Shire of Exmouth. The realignment will be about 1 km south of the existing road and to the south of the Vlamingh Head Lighthouse and Ningaloo Lighthouse Holiday Park. A new southern access road to Vlamingh Head Lighthouse is also proposed. The resulting road will be a 9 m pavement with associated drains, culverts and safety barriers where required. The alignment and design of the road is yet to be finalised with... Read more...

Hope Downs 2

Last updated: January 17, 2023

Hamersley HMS Pty Limited (the proponent) proposes to develop two new above water table (AWT) iron ore mine pits at the Hope Downs 2 proposal, located approximately 80 km north-west of the township of Newman in the Pilbara Region of Western Australia. The proposal includes a conceptual footprint of approximately 4,700 hectares (ha) to support the development, operation and closure of two new AWT iron ore deposits within a proposed Development Envelope of approximately 14,085 ha. The key... Read more...

Heated Overland Thermal Treatment Pad (‘Hottpad’) System at the Karratha Liquid Waste Treatment Plant and Waste Transfer Station

Last updated: January 9, 2023

The proposal is for the installation and operation of a Heated Overland Thermal Treatment (‘Hottpad’) system at t he Karratha liquid waste treatment plant and waste transfer station located approximately 6 kilometres south-west of Karratha. The Hottpad is intended to treat hydrocarbon-impacted ‘sludge’ from oil and gas operations in the region, that are currently transported interstate for thermal treatment. The proposal has a project life of 10 years and involves a self-sustaining smouldering... Read more...

Leslie Salt project, expansion of ponds, Port Hedland

Last updated: December 21, 2022

The proposal is to expand an existing salt mining operation by constructing a new primary concentration pond (which would lie outside the existing mining leases) and additional brine, bitterns and crystallization ponds within the existing leases. The current operation is located on coastal flats near Port Hedland with the primary concentration ponds 30 km to the east and the brine ponds 10 km to the east connected by an aqueduct. Once the brine is fully saturated it is pumped to crystallisation... Read more...

North Star Magnetite Project Extension

Last updated: December 19, 2022

FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...

Remediation of Lot 20 Adelaide Street Hazelmere

Last updated: December 19, 2022

Wasterock Pty Ltd and Hazelland Pty Ltd propose to remediate a historical inert landfill located at Lot 20 Adelaide Street Hazelmere for future commercial use. The proposal would involve recontouring the existing site and capping it with clean fill. Read more...

Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning: Revised Proposal - Fimiston South Project

Last updated: December 19, 2022

Kalgoorlie Consolidated Gold Mines is seeking to expand the Fimiston Gold mine operations (Fimiston), located 600 kilometres East of Perth, and adjacent to the City of Kalgoorlie-Boulder, Western Australia. The proposal is a significant amendment to the current Fimiston Gold Mine Operations Extension (Stage 2) and Mine Closure Planning, approved under Ministerial Statement 782, operated by Kalgoorlie Consolidated Gold Mines (KCGM). The proposal is for the expansion of the Fimiston operations in... Read more...

Yogi Magnetite Project

Last updated: November 28, 2022

FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...

Pages

  • « first
  • ‹ previous
  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • …
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on Twitter
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | Twitter | Login

wa.gov.au

All contents © 2023 Government of Western Australia. All rights reserved.