EPA Western Australia
Published on EPA Western Australia (https://www.epa.wa.gov.au)

Home > Printer-friendly > Printer-friendly > Geraldton Port Maximisation Project

Geraldton Port Maximisation Project

Project
Proponent: 
Mid West Ports Authority
Proposal description: 

The Mid West Ports Authority is proposing marine infrastructure upgrades at the Port of Geraldton. The Proposal has a disturbance footprint of up to 38 hectares (ha), of which 17 ha is a new footprint and 21 ha the existing port, within a 75 ha development envelope.

The Proposal is a significant amendment to the Geraldton Port Enhancement Project and Preparatory Works for the Town Beach Foreshore Redevelopment (Original Proposal) (Ministerial statement 600), and consists of:

  • dredging and land reclamation using dredge spoil.
  • installation of a breakwater extending north from the existing port footprint.
  • Marine infrastructure includes:

  • new wharf deck related to new Berth 1 (relocated) and Berth 8/9.
  • extension of the existing Berth 6 wharf.
  • new (relocated) tug harbour.
  • Implementation of the Proposal does not result in a throughput increase.

    Assessment Number: 
    2488
    Region: 
    Mid West
    Referred under EP Act: 
    s38
    Industry sector: 
    Infrastructure
    Last updated: 
    September 19, 2025
    Current Status: 
    EPA Report and Recommendations released - appeals closed
    EPA Report and Recommendations released - appeals closed
    1. Referral
    Comment on this referral: 
    Geraldton Port Maximisation Project
    Comment period: 
    Friday, 30 August, 2024 to Thursday, 5 September, 2024
    Referral documentation: 
    PDF icon Referral form.pdf
    PDF icon Proposal Content Document.pdf
    PDF icon Environmental Referral Supporting Information.pdf
    2. Decision on whether to assess this proposal
    Chair's Determination: 
    Assess - Additional Assessment Information
    Extract of determination: 
    PDF icon Geraldton Port Maximisation Project
    Preliminary Environmental Factors: 
    Benthic Communities and Habitats
    Coastal Processes
    Marine Environmental Quality
    Marine Fauna
    Date published: 
    Tuesday, 24 September, 2024
    3. Assessment
    Request for further information
    Date: 
    Monday, 14 October, 2024
    File upload: 
    PDF icon Request for further information - Geraldton Port Maximisation Project.pdf
    Environmental Review
    Environmental Review documentation: 
    PDF icon Geraldton Port Maximisation Project - Environmental Impact Assessment.PDF
    PDF icon PMaxP Proposal Content Document_250812 - Final.pdf
    PDF icon Coastal Processes Management Plan - Final.pdf
    PDF icon PMaxP Dredging Environmental Monitoring and Management Plan_final-July 2025.pdf
    PDF icon PMaxP Marine Construction EMP - Final.pdf
    PDF icon PMaxP Marine Fauna Management Plan - Final - August 2025.pdf
    PDF icon Appendix A_ProjectFootprint.pdf
    PDF icon Appendix A_ProjectLayout.pdf
    PDF icon Appendix B_Sediment Investigation.pdf
    PDF icon Appendix C_Berth 6 Material Characterisation.pdf
    PDF icon Appendix D_Hydrodynamic and Plume Modelling.pdf
    PDF icon Appendix E_BCH Survey Report.pdf
    PDF icon Appendix F_CLA_Optimized_Correct figures.pdf
    PDF icon Appendix G_Underwater Acoustic Modelling.pdf
    PDF icon Appendix H_Acoustic Assessment - Australian Sea Lion.PDF
    PDF icon Appendix H_Environmental Noise Impact Assessment.PDF
    PDF icon Appendix I_Sediment Transport Modelling.pdf
    PDF icon Appendix J_Landscape Visual Impact Assessment.pdf
    PDF icon Appendix K_Social Surroundings Study.pdf
    PDF icon Appendix L_GHG Assessment.pdf
    Date Published (Environmental Review documentation): 
    September 18, 2025
    4. EPA Report on assessment
    EPA Report Number: 
    1792
    EPA Report: 
    PDF icon EPA Report 1792 Geraldton Port Maximisation Project.pdf
    Key Environmental Factors: 
    Benthic Communities and Habitats
    Coastal Processes
    Marine Environmental Quality
    Marine Fauna
    Date published: 
    Friday, 19 September, 2025
    Appeals close: 
    Friday, 10 October, 2025

    Source URL:https://www.epa.wa.gov.au/proposals/geraldton-port-maximisation-project