Ministers North Derived Proposal

Project
Proposal description: 

The proposal is for iron ore mining operations at Ministers North, located approximately 85 km north-west of the Town of Newman. The proposal is located approximately 15 km south-east of BHP’s existing Yandi Mining Operations (Yandi).

The proposal is a derived proposal for mining operations at Ministers North authorised by the Pilbara Expansion Strategic Proposal, Ministerial Statement 1105.  

The proposal includes:

  • Above water table mining in open mine pits.
  • Stockpiling of ore on a run of mine pad prior to transport of ore to Yandi.
  • A Central Overburden Storage Area and in-pit backfilling of the mine pits.
  • Infrastructure corridor connecting Ministers North to Yandi.
  • A new primary crusher at Yandi to accommodate the Brockman-type ore supply.
  • Mine access roads and tracks to connect various mining infrastructure.
  • Borrow pits, laydown areas, stockpiles (topsoil, subsoil, vegetation).
  • Surface water management infrastructure.
  • Water supply pipelines (including requirement for pump stations and turkey’s nests).
  • Associated infrastructure to support the mine construction and operation.

The proposal is located within a 5,556.6 ha development envelope and will require the clearing of up to 1,848 ha of native vegetation.

Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
October 7, 2025
Current Status: 
Seven-day public comment period closed
Seven-day public comment period closed
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info