S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Warrawoona Gold Project

Attachment 1 to Statement 1150 - Increase Ore Processing of the Warrawoona Gold Project from 2.0 Mtpa to 2.5 Mtpa. Change to conditions approved under S45c on 1 April 2021.

Attachment 2 to Statement 1150 - Development of a new pit, increase tailings storage facility, inclusion of a solar farm, inclusion of a communications tower, and an increase in clearing and the development envelope to accommodate these changes. Change to conditions approved under S45c on 14 September 2021.

PDF icon Statement 1150.pdf September 14, 2021
Carlton Plain - Stage 1

Attachment 1 to Statement 1081 –

  • Change the proposals spatial coordinates from MGA Zone 50 to MGA Zone 52.
  • Change the name of the Coordinates Document Reference Number from DWERDA-024955 to DWERDA-038318.
  • Update Figure 1 with revised shapefiles to include Pump Site 2 and the revised development size from 3,086 ha to 3,055 ha.

Change to proposal approved under section 45C on 7 December 2018.

Attachment 2 to Statement 1081 –

Changes:
• Decrease the overall development envelope by 110 ha, from 3,055 ha to 2,945 ha.
• Change the name of the Coordinates Document Reference Number from DWERDA-038318 to DWERDT-471788.
• Changes to areas of clearing for irrigation and infrastructure.
• Update Figure 1 with the revised development envelope.

Change to proposal approved under section 45C on 1 September 2021.

PDF icon Ministerial Statement 1081.pdf September 1, 2021
Devil Creek Gas Development Project

Attachment 1 to Statement 795 - Discrete drilling and low level blasting of hard rock outcrops in a small portion of the onshore pipeline trench at various locations - change to proposal approved under s45C on 7 April 2010.

Attachment 2 to Statement 795 - increase the gas plants daily maximum production capacity via efficiencies created within the facilities existing infrastructure, extent and environmental footprint. - change to proposal approved under s45C on 1 September 2021.

PDF icon Statement 795.pdf September 1, 2021
Sino Iron Mine Continuation Proposal

Attachment 1 to Statement 1066 – Increase in pit dewatering – change to proposal approved under s45C on 18 July 2018.

Attachment 2 to Statement 1066 –Increase in pit dewater disposal to the Fortescue River. – change to proposal approved under s45C on 1 September 2021.

PDF icon Statement 1066.pdf September 1, 2021
Silicon Project, Kemerton and Mine at Moora - Revised Proposal

Attachment 1 to Statement 813 - Increase mine depth to mine below the water table; increase the groundwater requirements from 80,000 kilolitres per annum to 250,000 kilolitres per annum; include water discharge via Kiaka Creek to the Coonderoo River wetlands; and administrative changes to remove key characteristics which are not environmentally significant or regulated by other authorities - changes to proposal approved under s45C on 21 October 2016.

Attachment 2 to Statement 813 - Changes:
• Modification of Moora mine disturbance footprint and addition of a Development Envelope.
• Change to dewater discharge location.
• Increase in authorised extent of water consumption (groundwater) for Kemerton from 290,000 kL per annum to 312,000 kL per annum.
• Specify extent of native vegetation clearing within disturbance footprint.
• Replacement of Table 4, with a file reference number to identify the change in coordinates of the dewater discharge location.

Changes to proposal approved under s45C on 9 August 2021

PDF icon Statement 813.pdf August 9, 2021
Boonanarring Mineral Sands Mine

Attachment 1 to Statement 981 – Change to increase the disturbance area from 400 ha to 500 ha. Change to proposal approved under section 45C on 6 August 2019.

Attachment 2 to Statement 981 - Increase the disturbance area from 500 ha to 600 ha. Change to proposal approved under section 45C on 24 June 2021.

PDF icon Ministerial Statement 981.pdf June 24, 2021
Industrial Infrastructure and Harbour Development, Jervoise Bay

Attachment to Statement 490 - Construction of new infrastructure and deepening of harbour - change to proposal approved under s45C on 14 September 2006.

Attachment 1 to Statement 490 - Construction of wharf infrastructure and associated dredging - change to proposal approved under s45C on 16 March 2009.

Attachment 2 to Statement 490 - Changes:
• Construction of a 200 metre x 50 metre piled land backed wharf
• Up to 125 metre extension of the 350 metre long land backed wharf to 475 metres (AMC 1)
• Deck infill of AMC 2 by piling and cover with a concrete slab.
Changes to proposal approved under s45C on 24 May 2021.

PDF icon Statement 490.pdf May 25, 2021
Earl Grey Lithium Project

Attachment 1 to Statement 1118 - Changes:
• Addition of a water supply pipeline between Moorine Rock and the Earl Grey Lithium Project
• Change to the Development Envelope to accommodate pipeline infrastructure
• Amendment to the total footprint but no additional clearing.

Changes approvd undr S45c on 18 May 2021.

PDF icon Statement 1118.pdf May 18, 2021
Cataby Mineral Sands Project (s. 46)

Attachment 1 to Ministerial Statement 1017 - Changes:
• Increase in the Area of Disturbance by 151.5 ha from 1942 ha to 2093.5 ha
• Increase in the Development Envelope by 110.3 ha from 2514 ha to 2624.3 ha
• Decrease in native vegetation clearing by 2.9 ha from 156 ha to 153.1 ha
• Increase in the volume of overburden handled by 10 Mt from 164 Mt to 174 Mt
• Removal of Western Power corridor extension from Development Envelope

Change to conditions approved under S45c 14 May 2021.

PDF icon Statement 1017.pdf May 14, 2021
West Angelas Iron Ore Project Deposits C, D and G

Attachment 3 to Statement 1113 - Change to amend the Mine Development Envelope, approved under S45c on 16 April 2021.

PDF icon Statement 1113.pdf April 16, 2021

Pages