The Proposal would include the following activities:

  • shore crossing site preparation including installation of temporary facilities along the shoreline at the Pluto LNG Facility to facilitate the installation of the trunkline in shallower depths
  • preparation works associated with the installation of the trunkline including dredging and associated spoil disposal at existing spoil grounds
  • trunkline installation (about 32.7 kilometres long within State waters)
  • shore crossing site reinstatement
  • rock supply and dumping/sand supply and backfilling of the trench with sand and/or rock to protect the trunkline
  • pre-commissioning testing
  • commissioning and operation
  • decommissioning.
Assessment Number: 
2194
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
June 14, 2022
Current Status: 
Ministerial Statement published
Ministerial Statement published