Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Kemerton wastewater treatment plant and treated wastewater reuse at woodlot |
Attachment 1 to Statement 568 - Changes: • Updated title and description to refer to Kemerton woodlot - Binningup woodlot deleted • Refined general description of the wastewater treatment plant (WWTP) • Location description of the WWTP is updated to the current cadastral data description • Removed references to the 2002, 2003 and 2004 projected treatment capacities - The current maximum treatment capacity (3.6 ML/day) is retained. • Removed references to treated wastewater quality parameters (now retained solely under Part V Licence L7802) • Removed reference to the 10 ML storage dam at Binningup and the 7.4 kilometre wastewater conveyance pipeline to Binningup, as neither will be constructed • Removed reference to Eaton - as Eaton’s wastewater is now directed to Bunbury WWTP • Removed reference to 60 ha woodlot at Binningup • Updated woodlot site details to reflect Kemerton woodlot - i.e general description, location, area (now 30ha) • Removed 10ML on-site treated wastewater storage dam (no longer required at Binningup) Changes to proposal approved under s45c on 1 October 2019 |
![]() |
October 1, 2019 |
Christmas Creek Iron Ore Mine Expansion |
Attachment 1 to Statement 1033 - temporary presence of water in mining pits - change to proposal under s45C approved on 21 July 2017. Attachment 2 to Statement 1033 - Changes:
Change to proposal under s45C approved on 12 November 2018. Attachment 3 to Statement 1033 - Changes:
Change to proposal under s45C approved on 8 July 2019. |
![]() |
July 8, 2019 |
Wesfarmers LPG proposed upgrade |
Attachment 1 to Ministerial Statement 556 Changes:
Changes approved under s45C 13 August 2018. Attachment 2 to Ministerial Statement 556 Change to Remove element “Plant Storage Capacities”, which are managed under other appropriate legislation. Change approved under s45C 26 March 2019. |
![]() |
March 26, 2019 |
Onslow Marine Support Base Stage 2 Capital Dredging |
Attachment 1 to Statement 1077 - Changes:
Changes to proposal under s45C approved on 6 March 2019. |
![]() |
March 6, 2019 |
Sandy Ridge Project |
Attachment 1 to Ministerial Statement 1078 - Changes:
Change to proposal approved under S45c on 5 February 2019. |
![]() |
February 5, 2019 |
Coastal Road from Lancelin to Cervantes |
Attachment to Statement 618 - Change to definition of proposal in Schedule 1, Key Characteristics Table - change to proposal under s45C approved on 16 March 2005. Attachment 2 to Statement 618 – Changes:
Change to proposal approved under section 45C on 7 January 2019. |
![]() |
January 7, 2019 |
Red Hill Quarry Development |
Attachment 1 to Statement 912 – Increase in disturbance footprint by 3.6 hectares – change to proposal approved under section 45C on 12 December 2018. |
![]() |
December 12, 2018 |
Roe Highway Stage 8 Extension |
Attachment 1 to MInisterial Statement 1008 - Amendments to the development envelope to allow for additional clearing and disturbance. The additional areas will allow for works including the relocation of the pedestrian bridge over Kwinana Freeway, construction of noise walls and drainage structures, and the construction of a bridge over Farrington Road. Attachment 2 to Ministerial Statement 1008 - Changes:
S45c change to proposal approved 12 December 2018. |
![]() |
December 12, 2018 |
Perth Groundwater Replenishment Scheme Stage 2 |
Attachment 1 to Ministerial Statement 1065 - Increase in the development envelope to allow for laydown areas and pipe stringing; and a change in the alignment of the recharge pipeline and development envelope to allow for greater lengths of trenchless construction – change to proposal approved under s45C on 7 May 2018. Attachment 2 to Ministerial Statement 1065: Changes:
Change to proposal approved under s45C on 4 December 2018. |
![]() |
December 4, 2018 |
Cape Preston East – Multi-Commodity Export Facility |
Attachment 1 to Statement 949 - Increase the footprint required for marine infrastructure from 3.2 hectares (ha) to 4.8 ha; increase the overall project development envelope from 401.2 ha to 402.8 ha; update Figure 2 and coordinates defining disturbance envelopes - s45C change to proposal approved on 8 April 2015. Attachment 2 to Statement 949 - Revise the development envelope boundaries to accommodate the access road re-alignment; decrease the development envelope area from 2,942 hectares (ha) to 2,552 ha; increase in total disturbance from 402.8 ha to 413.2 ha; and update Figures 1 and 2, and delineation coordinates - change to proposal approved on 1 May 2017. Attachment 3 to Statement 949 - Change of purpose from a single commodity export facility (iron ore) to a multiple commodity export facility (iron ore and salt); Change to the name of the proposal - change to proposal approved on 19 September 2018. Attachment 4 to Statement 949 - Include an increase to Project Development Envelope by 11 ha to allow for flexibility in the final trestle jetty alignment (increase Project Development Envelope from 2,552 ha to 2, 563 ha). Include a 0.7 ha disturbance limit to coral reef benthic communities and habitat (BCH) within the currently approved 4.8 ha disturbance limit that applies to the Marine Infrastructure element. - change to proposal approved on 6 November 2023. |
![]() |
November 12, 2018 |