Buckland Project

Attachment 1 to Statement 960 - removal of the original mine village location and replace it with an alternative location; addition of a Central Services Facility (CSF) and associated infrastructure; and increase to the Disturbance Area for the Stage 1 Haul Road - s45C change to proposal approved 21 September 2015.

PDF icon Ministerial Statement 960 April 28, 2020
Red Hill Waste Management Facility Extension

Attachment 1 to Statement 274 - Changes:

  • Incorporate Part of Lot 12 of the Red Hill Waste Management Facility into the authorised extent of MS 274;
  • To construct and operate landfill cells within Part of Lot 12 as per L8889; and
  • To construct separately located leachate ponds on Lot 12 where:
    • One area is used to store leachate generated from the greenwaste processing area; and
    • One area is used to store leachate generated from Class III cells.

Attachment 2 to Statement 274 – Changes:

  • Incorporate Part Lots 8, 9 and 10 of the Red Hill Waste Management Facility into the authorised extent of MS 274
  • Decommission the existing garden organics processing area within Lot 12
  • Construct and operate a garden organics processing area within Lots 9 and 10
  • No amendments to existing implementation conditions.
PDF icon Ministerial Statement 274.pdf April 28, 2020
Ocean Reef Marina

Attachment 1 to Statement 1107 – Changes:

  • Increase development envelope from 61ha to 61.9 ha to allow for a revised footprint and reconfiguration of the entrance channel.
  • Decrease zone of high impact from 49.4 ha to 47.3 ha.
  • Decrease dredging (within the indicative dredging area) from 4.5ha to 3.5ha.
  • Change the wording in the short description of ‘the development of 750 vessels’ to ‘will provide accommodation for up to 750 vessels’.

Changes to proposal approved under s45C on 6 January 2020.

PDF icon Ministerial Statement 1107.pdf January 6, 2020
Wagoo Hills Vanadium Project and Mingenew Coal Project (s46) [1184]

Attachment 1 to Statement 481 – Amendment of key proposal characteristics – change to proposal approved under s45C on 22 October 2007.

Attachment 2 to Statement 481 – Production of iron ore – change to proposal approved under s45C on 30 August 2011.

Attachment 3 to Statement 481 – Increase the ore extraction from 3,900,000 tpa to 4,500,000 tpa (increase of 600,000 tpa) – change to proposal approved under s45C on 10 December 2019.

PDF icon Ministerial Statement 481.pdf December 10, 2019
Yoongarillup Mineral Sands Project

Attachment 1 to Statement 1030 - Increase the Life of Mine from three to four years - change to proposal approved under s45C on 10 December 2019.

PDF icon Ministerial Statement 1030.pdf December 10, 2019
Windimurra Vanadium Project: Land clearing and mining below the base of weathering

Attachment 1 to Statement 773 - Revised land clearing requirements - change to proposal approved under s45C on 24 February 2009.

Attachment 2 to Statement 773 – Additional land clearing – change to proposal approved under s45C on 23 August 2011.

Attachment 3 to Statement 773

  • Increase width of the pit from 290 metres to 430 metres (increase of 140 metres).
  • Increase the depth of the pit from 90 metres to 150 metres (increase of 60 metres).
  • Increase the total disturbance area and vegetation clearing from 610 hectares to 815 hectares (increase of 205 hectares). 

Change to proposal approved under s45C on 10 December 2019.

PDF icon Ministerial Statement 773.pdf December 10, 2019
Revised Iron Valley Iron Ore Project

Attachment 1 to Ministerial Statement 1044

Proposed changes to the authorised extent of physical and operational elements within Schedule 1 of MS 1044:

  • Increase water abstraction of groundwater from 23 GL/a to 42 GL/a.
  • Increase surface discharge of surplus dewatering water to Weeli Wolli Creek from 17 GL/a to 42 GL/a.
  • Removing Pit C from the original activity description.

Changes to proposal approved under s45C on 26 November 2019.

PDF icon Ministerial Statement 1044.pdf November 26, 2019
Solid Sodium Cyanide Plant Upgrade, Kwinana

Attachment 1 to Statement 700 – Increase in the liquid sodium cyanide production capacity from 70,000 to 85,000 tonnes per annum (tpa). Minor changes to the solid sodium cyanide plant facilities to accurately reflect the requirements for achieving the currently approved production capacity of 45,000 tpa – change to proposal approved under section 45C on 4 February 2013.

Attachment 2 to Statement 700 – Remove reference to the storage capacity of liquid sodium cyanide, the storage area for liquid sodium cyanide, and atmospheric emissions of ammonia and hydrogen cyanide and sodium cyanide (combined) – change to proposal approved under section 45C on 4 November 2014.

Attachment 3 to Statement 700:

  • Increase capacity of total liquid sodium cyanide production from 85,000 tonnes per annum (tpa) to 91,000 tpa
  • Removal of the following elements from the key characteristics table:
    • Location
    • Inputs (Solid Sodium Cyanide Plant)
    • Outputs (Solid Sodium Cyanide Plant)
    • Transport (Liquid Sodium Cyanide Plant and Solid Sodium Cyanide Plant)
  • Updated Figure 1: Regional Location and Figure 2: Site Layout

Changes to proposal approved under section 45C on 8 November 2019.

 

PDF icon Ministerial Statement 700.pdf November 8, 2019
Kemerton wastewater treatment plant and treated wastewater reuse at woodlot

Attachment 1 to Statement 568 - Changes:

• Updated title and description to refer to Kemerton woodlot - Binningup woodlot deleted

• Refined general description of the wastewater treatment plant (WWTP) • Location description of the WWTP is updated to the current cadastral data description

• Removed references to the 2002, 2003 and 2004 projected treatment capacities - The current maximum treatment capacity (3.6 ML/day) is retained.

• Removed references to treated wastewater quality parameters (now retained solely under Part V Licence L7802)

• Removed reference to the 10 ML storage dam at Binningup and the 7.4 kilometre wastewater conveyance pipeline to Binningup, as neither will be constructed

• Removed reference to Eaton - as Eaton’s wastewater is now directed to Bunbury WWTP • Removed reference to 60 ha woodlot at Binningup

• Updated woodlot site details to reflect Kemerton woodlot - i.e general description, location, area (now 30ha)

• Removed 10ML on-site treated wastewater storage dam (no longer required at Binningup)

Changes to proposal approved under s45c on 1 October 2019

PDF icon Ministerial Statement 568.pdf October 1, 2019
Christmas Creek Iron Ore Mine Expansion

Attachment 1 to Statement 1033 - temporary presence of water in mining pits - change to proposal under s45C approved on 21 July 2017.

Attachment 2 to Statement 1033 - Changes:

  • Expansion of the Christmas Creek Mine Development Envelope (Depicted by the red line within Figures 1 to 4 of Schedule 1); and
  • Changes to the clearing of locally significant vegetation in Table 2 of Schedule 1.

Change to proposal under s45C approved on 12 November 2018.

Attachment 3 to Statement 1033 - Changes:

  • Changes to Table 2, removing the time limit for the temporary presence of water in mining pits.
  • Approval of presence of water in inactive mine pits.
  • Below water table pits are required to be backfilled at cessation of mining to a level which will not allow the formation of permanent lakes.

Change to proposal under s45C approved on 8 July 2019.

PDF icon Ministerial Statement 1033.pdf July 8, 2019