Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Expansion of Premier Coal Mine to include Premier Pit 4, Collie (s46) [907] |
Attachment 1 to Statement 416 - Include development and operation of a new open pit (Pit 5) within an area previously identified and approved as a Waste Rock Dump; and include the definition of approved mining area and proposal Key Characteristics not previously defined in Ministerial Statement 416 - approval of s45C decision on 29 June 2016. |
![]() |
June 29, 2016 |
Marillana Creek (Yandi) Life of Mine Proposal, Mining Leases 270SA and 47/292, 90 km north-west of Newman |
Attachment 1 to Statement 679 - Change to the description in the Consultative Environmental Review for Statement 679. Section 45C change approved on 19 May 2006. Attachment 2 to Statement 679 - Increase in production at the Yandi mine from 45 million tonnes per annum to approximately 65 million tonnes per annum. Section 45C change approved on 17 December 2007. Attachment 3 to Statement 679 - Increase production rate at the Yandi mine from 45 million tonnes per annum to 87 million tonnes per annum. Section 45C change approved on 16 September 2008. Attachment 4 - Increase to “Mining disturbance area”, removal of: ‘Total resources’, ‘Mining Method’, ‘Overburden stripping ratio’, ‘Water use’, ‘Ore processing’, ‘Ore transportation from site’, ‘Power supply’, and ‘Workforce’. Section 45C change approved on 10 December 2013. Attachment 5 - Reallocation of 82 hectares from the ‘Pits and Overburden Storage Areas’ disturbance figure to the ‘Infrastructure’ disturbance figure; formalising the disturbance allocation by allocating 18 hectares of riparian vegetation to a new element ‘Marillana Creek Crossings’; updated figures and included a table of coordinates defining Development Areas. Section 45C change approved on 1 April 2015. Attachment 6 - Increase the total mining and infrastructure disturbance area by 345 ha; increase the disturbance area associated with diverting Marillana Creek by 163 ha; amalgamate the ‘pits and overburden storage disturbance area’ and the ‘infrastructure disturbance area’; and remove references to mining leases from the key characteristics table. Section 45C change approved on 4 May 2016. |
![]() |
May 4, 2016 |
Iron Valley Above Watertable Mining Project |
Attachment 1 to Statement 933 – Changes to surface water management (changes to Table 1 and Figure 1) - change to proposal approved under section 45C on 23 January 2015. Attachment 2 to Statement 933 – Increase to water use from 360 to 720 mega litres per year - change to proposal approved under section 45C on 19 October 2015. Attachment 3 to Statement 933 – Remove ‘wholly above the watertable’ from the short description of the project; temporary approval to discharge 2 GL of surplus groundwater; remove the ‘Pit Depth’ element from the Key Characteristics Table - change to proposal approved under section 45C on 2 May 2016. |
![]() |
May 2, 2016 |
Yandicoogina Iron Ore Project - Expansion to include Junction South West and Oxbow Deposits |
Attachment 2 to Statement 914 - Above and below water table mining of an additional small satellite pit at Oxbow East (Oxbow East Pitlet); amalgamation of dewatering limits and removal of surface water discharge limit from Table 2; amendment to the Clearing Avoidance Area as defined in Figure 2; revised Figure 3; and amalgamated Abbreviations and Definitions Table (Table 3) - changes to proposal approved under s45C on 3 March 2016. |
![]() |
March 3, 2016 |
Jimblebar Iron Ore Project |
Attachment 1 to Statement 857 - Increase in land disturbance from 2,042 hectares to 2,300 hectares and increase development envelope from 7,880 hectares to 8,183 hectares. Remove power supply as not a key proposal characteristic - s45C change to proposal approved 22 October 2015. Attachment 2 to Ministerial Statement 857 - Increase to the Development Envelope from 8,183 ha to 8,324 ha. s45C change to proposal approved 9 November 2018. |
![]() |
October 22, 2015 |
Pinjarra Refinery Efficiency Upgrade |
Attachment 1 to Statement 646 - Amendment of Key Proposal Characteristics: Atmospheric emissions from 640 tpa NOx to 780 tpa NOx - change to proposal approved under s45C on 1 July 2008. Attachment 2 to Statement 646 - Increase in production, bauxite residue generation, emissions of NOx, CO and greenhouse gases; update description of the proposal including the ‘Development Envelope’; correction of a unit error; and removal of elements that are not key proposal characteristics relevant to the environment, managed under other legislation, completed, or not relevant to the proposal - change to proposal approved under s45C on 21 September 2015. |
![]() |
September 21, 2015 |
Ammonia Plant, Burrup Peninsula |
Attachment to Statement 586 - Increas in the capacity of the two captive power plants from 20 to 22 Megawatts (MWs); change the package (plant start-up) boiler configuration from two 100 tonne per hour(tph) boilers to a 150 and 50 tph boiler; and to install one 5 Megawatt emergency diesel generator instead of two 2MW emergency diesel generators - change to proposal approved under s45C on 6 October 2004. Attachment to Statement 586 - Conditional approval to use Stage 1 of the Bulk Liquids Jetty for the export of ammonia until such time that the jetty is extended to enable other ships to be loaded/unloaded concurrently - change to proposal approved under s45C on 20 October 2004. Attachment to Statement 586 - change to a Schedule 1 characteristic (start-up steam generation) - change to proposal approved under s45C on 13 December 2005. Attachment to Statement 586 - change (1) to a commitment (isolation valves along the ammonia export pipeline); and (2) to a description in the Public Environmental Review of the ammonia export process, specifically, the management of liquid ammonia in the pipeline - change to proposal approved under s45C on 11 September 2006. Attachment 5 to Statement 586 - an increase in disturbance from 28 hectares to 29 hectares; an increase in ammonia production capacity; an increase in atmospheric emissions; an increase in wastewater discharge and some contaminant concentrations; and amendments to the structure and content of Table 1: Summary of key proposal characteristics in Schedule 1 in Ministerial Statement No. 586 to reflect the above changes and to align its format with the requirements of Environmental Assessment Guideline EAG 1: Environmental Assessment Guideline for Defining the Key Characteristics of a Proposal - change to proposal approved under s45C on 5 August 2015. |
![]() |
August 5, 2015 |
Nammuldi-Silvergrass Expansion Project |
Attachment 1 to Statement 925 - Above water table extensions to authorised Pits 11-13 at Nammuldi and Pit 1 at Silvergrass; additional clearing of 400ha of native vegetation for pits and dumps; retention of the existing (original) processing plant at Nammuldi; removal of the limit on production; and expansion of the development envelope - s 45C change to proposal approved 17 June 2015. |
![]() |
July 10, 2015 |
Fimiston Gold Mine Operations Extension Stage 3 and Mine Closure Planning |
Attachment 1 to Statement 782 – Clearing for Kaltails tailings storage facility, contingency clearing for infrastructure post Kaltails recommissioning, and inclusion of hydrogen peroxide dosing facility – change to proposal approved under s45C on 6 September 2010. Attachment 3 to Statement 782 – Removal of different options for management of tailings in the description of the proposal; updated description of the proposal including the ‘Proposal footprint’ and ‘Mine Development Envelope’; and removal of elements that are not key proposal characteristics relevant to the environment or managed under other legislation – change to proposal approved under section 45C on 17 June 2015. |
![]() |
June 17, 2015 |
Voyager Quarry Avon Loc 1881, Lots 11 and 14 Horton Rd, The Lakes |
Attachment 2 to Statement 706 - Increase in the disturbance footprint by 6.5 hectares; removal of ‘Quarry Operating Hours’; removal of elements that are not key proposal characteristics, or managed under other legislation. Change to proposal made under s45C approved on 27 May 2015. |
![]() |
May 20, 2015 |