S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Orebody 18 Iron Ore Mine

Attachment 1 to Statement 439 – Modification of pit areas and depths, enlargement of temporary stockpiles, adjustments to areas and locations of out-of-pit overburden storage areas, alteration to the arrangement of train wagons, increase in the workforce and establishment of a Maximum Disturbance Boundary – change to proposal approved under section 45C on 19 August 2008.

Attachment 2 to Statement 439 – Increase to maximum area of disturbance, area of pit, and area of overburden storage areas; and administrative changes to the Key Characteristics Table – change to proposal approved under section 45C on 17 June 2013.

Attachment 3 to Statement 439 - An increase in the total disturbance area, including: an increase in area of pits; an increase in area of stockpiles; and an increase in area of overburden storage areas - change to proposal approved under section 45C on 3 February 2015.

PDF icon Ministerial Statement 439 February 3, 2015
Cataby Mineral Sands Project

Attachment 1 to Statement 720 – Amend Proposal Description; Remove reference to a number of Key Characteristics; Increase Area of Disturbance; a defined Development Envelope to the proposal; Amend Size of Mines Pits; and Update figures in Schedule 1 - change to proposal approved under section 45C on 30 December 2014.

PDF icon Ministerial Statement 720 December 30, 2014
Solomon Iron Ore Project

Attachment 1 to Statement 862 – Change to Schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 13 December 2011.

Attachment 2 to Statement 862 – Up to 5 hectares of disturbance of the Priority Ecological Community 'Brockman Iron Crackling Clay Communities of the Hamersley Range'; Increase in peak dewatering rate to 25 gigalitres per annum; Changes to Schedule 1 to remove elements not environmentally relevant and to contemporise this Statement – change to proposal approved under section 45C on 21 November 2013.

Attachment 3 to Statement 862 – Increase in Total Disturbance (Mines) of 16 ha, 'Project Development Area 1' and 'Project Development Area 2' changed to 'Project Development Envelope 1’ and 'Project Development Envelope 2' and Amendments to the Project Development Envelope 1 and Rail Corridor and Rail Spur Corridor boundaries, and corresponding adjustment of area values – change to proposal approved under section 45C on 15 October 2014.

PDF icon Ministerial Statement 862 October 15, 2014
Heavy Mineral Sands Mine, Beenup, Shire of Augusta-Margaret River (s46) [986]

Attachment 1 to Statement 434 – Reduce the original proposal area from 2,900 to 697 hectares – change to proposal approved under section 45C on 28 August 2014.

PDF icon Ministerial Statement 434 August 28, 2014
Ocean outlet for treated wastewater, Bunbury wastewater treatment plant

Attachment 1 to Statement 572 - Increase of the total allowable annual load of Total Nitrogen (TN) from 60 to 70 t/a – change to proposal approved by the EPA Chairman on a temporary basis, such that the increase in TN load limit would cover only the period of time required to complete the Wastewater Treatment Plan upgrade – change to proposal approved on 18 November 2008.

Attachment 2 to Statement 572 - Removal of the Total Phosphorous (TP) limit of 10 mg/l and including it in Part V Licence and removal of the faecal coliform limit of <10,000 cfu/ 100ml as from a marine perspective this specific value is not relevant and monitoring of the bacterial levels in ocean outfall sample is addressed in Part V Licence – change to proposal approved on 22 April 2014.

PDF icon Ministerial Statement 572 April 22, 2014
Regional recreation center Stage 1 Boundary, Port Kennedy (s46)

Attachment 1 to Statement 0359 – Change to description of development approved in April 1995, under the Port Kennedy Development Agreement Act 1992 – change to proposal approved under section 45C on 22 July 2005.

Attachment 2 to Statement 0359 – Increase in the minimum coastal setback; Increase in the overall extent of the residential development area; Decrease in the overall area of the golf course; Decrease in groundwater abstraction for golf course irrigation; Changes to development layout and addition of roads and open space areas. – change to proposal approved under section 45C on 22 April 2014.

PDF icon Ministerial Statement 359 April 22, 2014
Argyle Diamond Mine - Underground Project 110 km south of Kununurra, East Kimberley

Attachment 1 to Statement 711 – Deletion of the “Key Characteristics” from Table 1 of Schedule 1 of Statement 711 which are not relevant to the environment; Amendment to daily “Dewatering Requirements” limits; Removal of reference to “Alternative Power Supply”; and update all Figures in Schedule 1 – change to proposal approved under section 45C on 17 April 2014.

PDF icon Ministerial Statement 711 April 17, 2014
Port Kennedy Regional Recreation Centre, Stage 1, Becher Pt

Attachment 1 to Statement 105 – Change to description of development approved in April 1995, under the Port Kennedy Development Agreement Act 1992 – change to proposal approved under section 45C on 22 July 2005.

Attachment 2 to Statement 105 – Increase in the minimum coastal setback; Increase in the overall extent of the residential development area; Decrease in the overall area of the golf course; Decrease in groundwater abstraction for golf course irrigation; Changes to development layout and addition of roads and open space areas. – change to proposal approved under section 45C on 22 April 2014.

PDF icon Ministerial Statement 105 April 2, 2014
Eglington Beach Resort

Attachment 1 to Statement 150 – Modification of the approved marina design described in Figure 1 and Table 1, to the changed design described in Figure 2 and Table 2 of this attachment – change to proposal approved under section 45C on 5 September 2008.

Attachment 2 to Statement 150 – Removal of golf course and associated recreational resort complex and replacement with urban development. Increase in and change to location of areas to be set aside for Conservation through Foreshore reserves, Regional Open Space and Public Open Space. – change to proposal approved under section 45C on 12 February 2014.

PDF icon Ministerial Statement 150.pdf February 12, 2014
Pilbara Iron Ore and Infrastructure Project: Port and North-South Railway (Stage A)

Attachment 1 to Statement 690 - Increase of dredging area and clearance area for Port - 45C change to proposal approved on 6 April 2006.

Attachment 2 to Statement 690 - Additional clearance for temporary access road - 45C change to proposal approved on 17 August 2006.

Attachment 3 to Statement 690 - Additional infrastructure listed as part of Rail Loop and Railway Alignment - 45C change to proposal approved on 12 September 2006.

Attachment 4 to Statement 690 - Increase of dredging area and clearance area for Port - 45C change to proposal approved on 27 April 2007.

Attachment 5 to Statement 690 - Description of conveyors as uncovered - 45C change to proposal approved on 4 April 2008.

Attachment 6 to Statement 690 - Extension of construction period and addition of two car dumpers - 45C change to proposal approved on 7 August 2008.

Attachment 7 to Statement 690 - Additional rail infrastructure and associated clearance of an additional 606 hectares - 45C change to proposal approved on 17 December 2009.

Attachment 8 to Statement 690 - Increase in railway corridor disturbance (371 hectares) due to construction of additional infrastructure, increase in port operating area (3 hectares) due to widening of causeway – section 45C change to proposal approved on 21 August 2011.

Attachment 9 to Statement 690 – Remove and amend the port elements of Schedule 1 to include wharf AP5, and removal of references to export tonnage in Schedule 1 – change to proposal approved under section 45C on 6 February 2014.

PDF icon Ministerial Statement 690 February 6, 2014