S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Port Kennedy Regional Recreation Centre, Stage 1, Becher Pt

Attachment 1 to Statement 105 – Change to description of development approved in April 1995, under the Port Kennedy Development Agreement Act 1992 – change to proposal approved under section 45C on 22 July 2005.

Attachment 2 to Statement 105 – Increase in the minimum coastal setback; Increase in the overall extent of the residential development area; Decrease in the overall area of the golf course; Decrease in groundwater abstraction for golf course irrigation; Changes to development layout and addition of roads and open space areas. – change to proposal approved under section 45C on 22 April 2014.

PDF icon Ministerial Statement 105 April 2, 2014
Eglington Beach Resort

Attachment 1 to Statement 150 – Modification of the approved marina design described in Figure 1 and Table 1, to the changed design described in Figure 2 and Table 2 of this attachment – change to proposal approved under section 45C on 5 September 2008.

Attachment 2 to Statement 150 – Removal of golf course and associated recreational resort complex and replacement with urban development. Increase in and change to location of areas to be set aside for Conservation through Foreshore reserves, Regional Open Space and Public Open Space. – change to proposal approved under section 45C on 12 February 2014.

PDF icon Ministerial Statement 150.pdf February 12, 2014
Pilbara Iron Ore and Infrastructure Project: Port and North-South Railway (Stage A)

Attachment 1 to Statement 690 - Increase of dredging area and clearance area for Port - 45C change to proposal approved on 6 April 2006.

Attachment 2 to Statement 690 - Additional clearance for temporary access road - 45C change to proposal approved on 17 August 2006.

Attachment 3 to Statement 690 - Additional infrastructure listed as part of Rail Loop and Railway Alignment - 45C change to proposal approved on 12 September 2006.

Attachment 4 to Statement 690 - Increase of dredging area and clearance area for Port - 45C change to proposal approved on 27 April 2007.

Attachment 5 to Statement 690 - Description of conveyors as uncovered - 45C change to proposal approved on 4 April 2008.

Attachment 6 to Statement 690 - Extension of construction period and addition of two car dumpers - 45C change to proposal approved on 7 August 2008.

Attachment 7 to Statement 690 - Additional rail infrastructure and associated clearance of an additional 606 hectares - 45C change to proposal approved on 17 December 2009.

Attachment 8 to Statement 690 - Increase in railway corridor disturbance (371 hectares) due to construction of additional infrastructure, increase in port operating area (3 hectares) due to widening of causeway – section 45C change to proposal approved on 21 August 2011.

Attachment 9 to Statement 690 – Remove and amend the port elements of Schedule 1 to include wharf AP5, and removal of references to export tonnage in Schedule 1 – change to proposal approved under section 45C on 6 February 2014.

PDF icon Ministerial Statement 690 February 6, 2014
West Angelas Iron Ore Project

Attachment to Statement 514 - Increase mining rate from 25 million tonnes per annum to approximately 30 million tonnes per annum - change to proposal approved on 11 April 2006.

Attachment 1 to Statement 514 - Additional rail siding, Spoonbill - change to proposal approved on 29 November 2006.

Attachment 2 to Statement 514 - Change to the rail alignment along Hamersley Flats - change to proposal approved on 13 February 2009.

Attachment 3 to Statement 514 - increase throughput to 40 million tonnes per annum, update of mine figure (Figure 10) and amendments to Key Characteristics Table - s45C change to proposal approved on 20 August 2009.

Attachment 4 to Statement 514 – Deepening of existing pits and addition of Pit E – change to proposal approved under section 45C on 30 January 2012.

Attachment 5 to Statement 514 – Amendment to proposal description and deletion of the key characteristics from Schedule 1 which are not relevant to the environment or managed by another process – change to proposal approved under section 45C on 16 January 2014.

PDF icon Ministerial Statement 514 January 16, 2014
Western Turner Syncline - Section 10 Iron Ore Mine

Attachment 1 to Statement 807 – Removal of Water Supply and Production Limits – change to proposal approved under section 45C on 10 December 2013.

PDF icon Ministerial Statement 807 December 10, 2013
Yilgarn Operations - Windarling Range W4 East Deposit

Attachment 1 – Extension to the area of the W4 East Deposit Haul Road and revision of proposal description – change to proposal approved under section 45C on 20 November 2013.

PDF icon Ministerial Statement 909 - Yilgarn Operations - Windarling Range W4 East Deposit November 20, 2013
Koolyanobbing Iron Ore Expansion

Attachment 1 to Statement 627 – In schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 5 May 2005.

Attachment 2 to Statement 627 – Increase in area of native vegetation clearing at the Windarling W3/5 pit area by 52.9 hectares to develop a new waste dump (47.9 hectares with maximum height of 540m AHD) and extend the area for stock piling (5 hectares) – change to proposal approved under s45C on 11 March 2008.

Attachment 4 to Statement 627 – An increase in ore production of 10/% – change to proposal approved under s45C on 7 October 2008.

Attachment 5 to Statement 627 – Increase ore production at the ore handling plant at Koolyanobbing from 8.8 million tonnes per annum up to 11.5 million tonnes per annum – change to proposal approved under s45C on 20 August 2010.

Attachment 6 to Statement 627 – Change to Schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 13 December 2011.

Attachment 7 to Statement 627 – Reduction of project impacts to Declared Rare Flora – change to proposal approved under section 45C on 25 September 2012.

Attachment 8 to Statement 627 – Increase in disturbance footprint of 45 ha at Windarling to allow for stockpiling of topsoil, subsoil and vegetation materials to be used in future rehabilitation – change to proposal approved under section 45C on 12 October 2012.

Attachment 9 to Statement 627 – Mining of Windarling Range W1 deposit below the groundwater table – change to proposal approved under section 45C on 20 November 2012.

Attachment 10 to Statement 627 – Increase to Windarling W4 West waste rock dump area and ore stockpile area – change to proposal approved under section 45C on 20 November 2013.

PDF icon Ministerial Statement 627 November 20, 2013
South West Creek Dredging and Reclamation Proposal

Attachment 1 to Statement 859 – Relocation of DMMA G Discharge Point and Modification of Zone of Permanent Mangrove loss - change to proposal approved under s45C on 27 October 2011.

Attachment 2 to Statement 859 – Realignment of the access track between Utah Point Road and the dredging area, and associated changes to the zone of permanent mangrove loss – change to proposal approved under s45C on 2 May 2012.

PDF icon Ministerial Statement 859 November 8, 2013
Hope Downs Iron Ore Mine

First Attachment to Statement 584 - Production rate increase 25 mega tonnes per annum to 30 mega tonnes per annum - change to proposal approved under s45C on 3 Oct 2005.

Second Attachment to Statement 584 - Change to mine infrastructure and disturbance areas - change to proposal approved under s45C on 19 Sep 2006.

Third Attachment to Statement 584 - Increase in the area of rail corridor disturbance - change to proposal approved under s45C on 31 Oct 2006.

Attachment 1 to Statement 584 - Increase in project clearance disturbance area from 1,600 hectares to 1,850 hectares, and updating of Key Characteristics Table - change to proposal approved under s45C on 14 Jul 2009.

Attachment 2 to Statement 584 – Increase to approved disturbance area and redefinition of Project Area – change to proposal approved under s45C on 6 Sept 2010.

Attachment 3 to Statement 584– Remove Weeli Wolli Spring supplementation limit in Schedule 1 – change to proposal approved under s45C on 20 Apr 2012.

Attachment 4 to Statement 584 – Removal of ore mining rate and expansion of disturbance footprint – change to proposal approved under s45C on 28 Aug 2012.

Attachment 5 to Statement 584 – Annualise Mine Pit Dewatering Rate – change to proposal approved under section 45C on 7 November 2013.

PDF icon Ministerial Statement 584 November 7, 2013
Yilgarn Operations Deception Deposit

Attachment 1 to Statement 900 – Realignment of the Deception Deposit Haul Road and the siting of the Deception Deposit Waste Rock Landform – change to proposal approved under section 45C on 19 November 2012.

Attachment 2 to Statement 900 – Realignment of Haul Road, co-location of support infrastructure to Ore Stockpile areas – change to proposal approved under section 45C on 5 November 2013.

PDF icon Ministerial Statement 900 November 5, 2013

Pages