S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Wesfarmers LPG proposed upgrade

Attachment 1 to Ministerial Statement 556

Changes:

  • Update ‘Short Description’ in Table 1.
  • Remove description of elements from Table 2 which are duplicated in Table 1: Summary of the Proposal.
  • Increase to plant pressure storage capacities for Propane, Butane and Condensate.
  • Amalgamation of LPG and Condensate storage capacities.
  • Increase in carbon dioxide emissions.
  • Remove elements which are not considered to be key characteristics relevant to the environment.
  • Remove elements which are managed under other appropriate legislation and regulations.

Changes approved under s45C 13 August 2018.

Attachment 2 to Ministerial Statement 556

Change to Remove element “Plant Storage Capacities”, which are managed under other appropriate legislation. Change approved under s45C 26 March 2019.

PDF icon Ministerial Statement 556.pdf March 26, 2019
Onslow Marine Support Base Stage 2 Capital Dredging

Attachment 1 to Statement 1077 - Changes:

  • Increase clearing by 4.5 hectares (ha) for the revised Dredge Material Management Area (DMMA);
  • Increase development envelope by 13.7 ha for the revised DMMA; and
  • Minor relocation of the DMMA dredge spoil return water discharge point.

Changes to proposal under s45C approved on 6 March 2019.

PDF icon Ministerial Statement 1077.pdf March 6, 2019
Sandy Ridge Project

Attachment 1 to Ministerial Statement 1078 - Changes:

  • Amend the development envelope from 1004.2 hectares to 1061 hectares to allow for relocation of groundwater abstraction infrastructure
  • Installation of a 1.5 megawatt solar farm for power generation
  • Addition of two stormwater sumps on internal roads in the infrastructure area
  • Reduction in the width of internal roads to the Class II landfill and along the groundwater pipeline to Carina Iron Ore Mine
  • Addition of an access road adjacent to Mt Dimer Road
  • Addition of a flood levee
  • Change in orientation and size of accommodation camp

Change to proposal approved under S45c on 5 February 2019.

PDF icon Ministerial Statement 1078 February 5, 2019
Coastal Road from Lancelin to Cervantes

Attachment to Statement 618 - Change to definition of proposal in Schedule 1, Key Characteristics Table - change to proposal under s45C approved on 16 March 2005.

Attachment 2 to Statement 618 – Changes:

  • Increasing area of vegetation disturbance for Ocean Drive passing lanes from 224.5 ha to 229.2 ha (addition of 4.7 ha)
  • Removal of average width of road construction area
  • Removal of duration of construction
  • Removal of standard of construction

Change to proposal approved under section 45C on 7 January 2019.

PDF icon Ministerial Statement 618 January 7, 2019
Red Hill Quarry Development

Attachment 1 to Statement 912 – Increase in disturbance footprint by 3.6 hectares – change to proposal approved under section 45C on 12 December 2018.

PDF icon Ministerial Statement 912.pdf December 12, 2018
Roe Highway Stage 8 Extension

Attachment 1 to MInisterial Statement 1008 - Amendments to the development envelope to allow for additional clearing and disturbance. The additional areas will allow for works including the relocation of the pedestrian bridge over Kwinana Freeway, construction of noise walls and drainage structures, and the construction of a bridge over Farrington Road.

Attachment 2 to Ministerial Statement 1008 - Changes:

  • Amend the development envelope to define:
    • a road construction and operation zone to allow the construction and operation of the Murdoch Drive connection to Roe Highway and Kwinana Freeway
    • a rehabilitation zone to allow for the rehabilitation of areas cleared as part of the original proposal and no longer required for road construction.

S45c change to proposal approved  12 December 2018.

PDF icon Ministerial Statement 1008.pdf December 12, 2018
Perth Groundwater Replenishment Scheme Stage 2

Attachment 1 to Ministerial Statement 1065 - Increase in the development envelope to allow for laydown areas and pipe stringing; and a change in the alignment of the recharge pipeline and development envelope to allow for greater lengths of trenchless construction – change to proposal approved under s45C on 7 May 2018.

Attachment 2 to Ministerial Statement 1065:

Changes:

  • modified location and alignment of the pipe being installed using trenchless technology including relocation of the two drill pits at either end of the 'trenchless technology' instalation
  • addition of approximately 50 metres of pipe between the new trenchless technology installation and the approved alignment which will be constructed using open trench construction methods; and
  • removal from the develpment envelope of approximately 385 metres (m) of pipe installation.

Change to proposal approved under s45C on 4 December 2018.

PDF icon Ministerial Statement 1065.pdf December 4, 2018
Cape Preston East – Multi-Commodity Export Facility

Attachment 1 to Statement 949 - Increase the footprint required for marine infrastructure from 3.2 hectares (ha) to 4.8 ha; increase the overall project development envelope from 401.2 ha to 402.8 ha; update Figure 2 and coordinates defining disturbance envelopes - s45C change to proposal approved on 8 April 2015.

Attachment 2 to Statement 949 - Revise the development envelope boundaries to accommodate the access road re-alignment; decrease the development envelope area from 2,942 hectares (ha) to 2,552 ha; increase in total disturbance from 402.8 ha to 413.2 ha; and update Figures 1 and 2, and delineation coordinates - change to proposal approved on 1 May 2017.

Attachment 3 to Statement 949 - Change of purpose from a single commodity export facility (iron ore) to a multiple commodity export facility (iron ore and salt); Change to the name of the proposal - change to proposal approved on 19 September 2018.

Attachment 4 to Statement 949 - Include an increase to Project Development Envelope by 11 ha to allow for flexibility in the final trestle jetty alignment (increase Project Development Envelope from 2,552 ha to 2, 563 ha). Include a 0.7 ha disturbance limit to coral reef benthic communities and habitat (BCH) within the currently approved 4.8 ha disturbance limit that applies to the Marine Infrastructure element. - change to proposal approved on 6 November 2023.

PDF icon Ministerial Statement 00949.pdf November 12, 2018
New Road from Tom Price to Karratha

Attachment 2 to Statement 677 – Changes:
• Create a total disturbance footprint of 574 hectares, by combining the following areas of disturbance:
  - Road formation – approximately 474 hectares; and
  - Material sources – approximately 100 hectares.
• Remove the following elements which are no longer considered Key Proposal Characteristics:
  - Design speed (110 kilometres per hour).
  - Railway crossings (One road-over-rail bridge. Four new level crossings.) – change to proposal approved under section 45C on 21 June 2018.

PDF icon Ministerial Statement 0677 June 21, 2018
Technical Ammonium Nitrate Production Facility, Burrup Peninsula

Attachment 1 to Statement 870 – Removal of 'Wastewater' from the key proposal characteristics table – change to proposal approved under section 45C on 9 July 2013.

Attachment 2 to Statement 870 – Decrease in development and disturbance area; removal of TAN storage capacity– change to proposal approved under section 45C on 7 June 2017.

PDF icon Ministerial Statement 870 June 11, 2018