S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
New Road from Tom Price to Karratha

Attachment 2 to Statement 677 – Changes:
• Create a total disturbance footprint of 574 hectares, by combining the following areas of disturbance:
  - Road formation – approximately 474 hectares; and
  - Material sources – approximately 100 hectares.
• Remove the following elements which are no longer considered Key Proposal Characteristics:
  - Design speed (110 kilometres per hour).
  - Railway crossings (One road-over-rail bridge. Four new level crossings.) – change to proposal approved under section 45C on 21 June 2018.

PDF icon Ministerial Statement 0677 June 21, 2018
Technical Ammonium Nitrate Production Facility, Burrup Peninsula

Attachment 1 to Statement 870 – Removal of 'Wastewater' from the key proposal characteristics table – change to proposal approved under section 45C on 9 July 2013.

Attachment 2 to Statement 870 – Decrease in development and disturbance area; removal of TAN storage capacity– change to proposal approved under section 45C on 7 June 2017.

PDF icon Ministerial Statement 870 June 11, 2018
Gruyere Gold Project

Increase the development envelope from 18,629 ha to 19,925 ha; Increase the disturbance footprint from 2,260 ha to 2,930 ha; Increase impacts to GDE DD-MWS1 from 7 ha to 15 ha; and Update Figure 1 and delineation coordinates - Changes to proposal under s45C approved 4 September 2017

Attachment 2 to Ministerial Statement 1048 - Changes: • Increase in the development envelope from 19,925 ha to 19,931 ha; • Increase in the disturbance footprint from 2,930 ha to 2,938 ha; and • Updated Figure 1 and delineation coordinates. Change to proposal approved under section 45C on 18 April 2018

PDF icon Ministerial Statement 1048 April 18, 2018
Bluewaters Power Station Phase II

Attachment 1 to Statement 724 – Modification of the location footprint and clarification of "Maximum Facility Footprint", "Maximum Total Area", "Infrastructure", and "Construction Laydown Envelope" - s45C change to proposal approved on 9 October 2006.

Attachment 2 to Statement 724 – Increase in power generating capacity from 200 megawatts to 208 megawatts, increase in the size of the laydown area, changes to the air emissions profile, relocation of the wastewater treatment plant, and re-alignment of the coal conveyor - s45C change to proposal approved on 18 September 2007.

Attachment 3 to Statement 724 – Increase ancillary infrastructure area - s45C change to proposal approved on 12 August 2008.

Attachment 4 to Statement 724 – Addition of a second ash disposal site - s45C change to proposal approved on 7 November 2008.

Attachment 5 to Statement 724 – Increase greenhouse gas emissions to 1,562,000 tonnes per annum of carbon dioxide equivalent - s45C change to proposal approved on 2 September 2009.

Attachment 6 to Statement 724 – Increase power generating capacity from 208 megawatts to 212 megawatts - change to proposal approved under s45C on 23 March 2010.

Attachment 7 to Statement 724 – Removal of maximum sulphur oxides in emissions and plant thermal efficiency – change to proposal approved under section 45C on 7 January 2013.

Attachment 9 to Statement 724 – Adjustment of annual pollutant loads emitted to air - change to proposal approved under S45c on 4 April 2018.

PDF icon Ministerial Statement 0724 April 4, 2018
Bluewaters Power Station Phase I

Attachment 1 to Statement 685 – Modification of the location plan and clarification of "Maximum Facility Footprint", "Maximum Total Area", "Infrastructure", and "Construction Laydown Envelope" - s45C change to proposal approved on 28 March 2006.

Attachment 2 to Statement 685 – Increase in power generating capacity from 200 megawatts to 208 megawatts, increase in the size of the construction laydown area, changes to the air emissions profile, relocation of the wastewater treatment plant, and re-alignment of the coal conveyor - s45C change to proposal approved on 18 September 2007.

Attachment 3 to Statement 685 – change to ancillary infrastructure area - s45C change to proposal approved on 12 August 2008.

Attachment 4 to Statement 685– Addition of a second ash disposal site - s45C change to proposal approved on 7 November 2008.

Attachment 5 to Statement 685 – Increase greenhouse gas emissions to 1,562,000 tonnes per annum of carbon dioxide equivalent - s45C change to proposal approved on 2 September 2009.

Attachment 6 to Statement 685 – Increase the power generating capacity from 208 megawatts to 217 megawatts - s45C change to proposal approved on 23 October 2009.

Attachment 7 to Statement 685 – Removal of maximum sulphur oxides in emissions and plant thermal efficiency – change to proposal approved under section 45C on 7 January 2013.

Attachment 9 to Statement 685 - Adjustment of annual pollutant loads emitted to air - change to proposal approved under S45c on 4 April 2020.

PDF icon Ministerial Statement 685 April 4, 2018
Continuation of lime sand mining, Ocean Beach Quarry, Portion of Reserve A24913, Denmark

Attachment 1 to Statement 521 – Changes:

  • Removal of vegetation Buffer Zone;
  • Change the depth of mining
  • Change to Production rate
  • Change to time period for the liming season
  • Remove key characteristics which:
  • Have no direct environmental impact; and
  • Are regulated through legislation enforced by other agencies – change to proposal approved under section 45C on 24 January 2018.
PDF icon Ministerial Statement 521 January 24, 2018
Koolanooka Hills and Blue Hills Remnant Direct Shipping Iron Ore Mining Project

Attachment 1 to Statement 811 - Mine detritals, expand Koolanooka South fold Cutback, increase the size of overburden stockpiles, and in-pit backfilling - change to proposal approved under s45C on 17 March 2010.

Attachment 2 to Statement 811 – Additional ore stockpile areas for Koolanooka Mine – change to proposal approved under s45C on 17 May 2011.

Attachment 3 to Statement 811 – Amendments to the Blue Hills component of the Koolanooka/Blue Hills DSO Mining Project to include expansion of the Mungada West and East pits, relocation of the processing facilities, relocation and expansion of waste stockpiles and ore stockpiles, relocate the access tracks and haul roads and reduction of clearing of the Mungada haul road between Koolanooka and Blue Hills – change to proposal approved under section 45C on 3 May 2013.

Attachment 4 to Statement 811 – Extension of the Mungada West pit and new access Haul Road – change to proposal approved under section 45C on 10 December 2014.

Attachment 5 to Statement 811 – Mining up to 4 m below the water table in Mungada West pit, Mining up to 38 m below the water table in Mungada East pit, Two in-pit sumps, each pit with a holding capacity of 175 kL, Up to 3.2 km of dewatering pipeline from Mungada West and East pits (within the alignment of the existing haul road) to the existing ‘turkey’s nest’ with a holding capacity of 4,860 kL, Up to 0.44 GL/ a of dewatering from the in-pit sumps from both Mungada East and West pits to the existing Turkey’s nest  – change to proposal approved under section 45C on 21 December 2017.

PDF icon Ministerial Statement 0811 December 21, 2017
Exploration drilling Mungada Blue Hills East

Attachment 1 to Statement 1013 -
• Change in the number and location of cut and fill drill pads from 16 to 11.
• Change in the location and length of access tracks.
• Decrease of 0.055 hectares (ha) in the extent of authorised clearing for access tracks and drill pads. Change to proposal approved under section 45C on 21 December 2017.

PDF icon Ministerial Statement 1013 - Exploration drilling Mungada Blue Hills East December 21, 2017
Karara Iron Ore Project

Attachment 1 to Statement 805 - Relocation of the accommodation village, relocation of the airstrip, consolidation of mine infrastructure and removal of internal roads, a borrow pit and a water pipeline - change to proposal approved under s45C on 15 March 2010.

Attachment 2 to Statement 805 – Increase in disturbance area to allow for increased waste dump area, rail loop and airstrip clearing – change to proposal approved under section 45C on 21 June 2012.

Attachment 3 to Statement 805 – Additional clearing for construction of processing plant to facilitate the phased KIOP Expansion Project – change to proposal approved under section 45C on 20 February 2013.

Attachment 4 to Statement 805 – Dry stack and wet tailings cells within the final tailings storage facility landform, being a single dry stack tailings storage facility - change to proposal approved under section 45C on 13 December 2017.

Attachment 5 to Statement 805 – Increase the current authorised area of disturbance by an additional 69 ha to facilitate:

  • relocation of the landfill facility;
  • extension of the ROM pad;
  • adding additional topsoil storage; and
  • supporting service/infrastructure corridors. 

Change to proposal approved under section 45C on 18 March 2019.

PDF icon Ministerial Statement 805.pdf December 13, 2017
Kwinana Freeway Extension, Forrest Road to Thomas Road - Wetland Impact Management

Attachment 1 to Statement 304 – Construction of a third lane from Forrest Road to Russell Road – change to proposal approved under section 45C on 25 September 2014.

Attachment 2 to Statement 304 – Construction of a third lane between Russel Road and Armadale Road – change to proposal approved under section 45C on 13 December 2017.

PDF icon Ministerial Statement 304 December 13, 2017

Pages