S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
High Street Upgrade

Attachment 1 to Ministerial Statement 1096 - Changes:

  • Clearing of an additional 19 trees.
  • Amendment of the height and location of the noise walls on High Street west of Stirling Highway, at Montreal Street and on Wood Street.
  • Updated Figures 1.1, 1.2 and 1.3 to show the trees to be removed, retained and the amended noise walls.
  • Updated coordinates defining the High Street Upgrade development envelope. Trees to be retained and noise wall locations shown in Figures 1.1 to 1.3 are held by the Department of Water and Environmental Regulation, document reference numbers DWERDT272012 (11 April 2020).

Changes approved under s45c on 22 April 2020.

Attachment 2 to Ministerial Statement 1096 - Changes:

  • Clearing of an additional 6 trees.
  • Updated Figures 1.1, 1.2 and 1.3 to show the trees to be removed and retained.
  • Updated coordinates identifying trees to be removed and retained shown in Figures 1.1, 1.2 and 1.3 are held by the Department of Water and Environmental Regulation, document reference number DWERDT407702.

Changes approved under s45c on 3 February 2021.

PDF icon Ministerial Statement 1096.pdf February 3, 2021
Lake Wells Potash Project

Attachment 1 to Statement 1162 - Changes:
• Realignment of the on-playa development envelope and operations resulting in 498 ha increase in the development envelope and reduction of disturbance by 1,015 ha • Realignment of the off-playa development envelope and operations resulting in 2,199 ha reduction in development envelope and reduction in clearing of 247 ha • Increase the rate of brine abstraction in the first 16 years to 21.3 GL per annum with abstraction rates dropping during years 17 to 30, resulting in an overall abstraction of up to 597 GL over the life of the project • Increase in process/potable water abstraction by 0.3 GL per annum.

Changes approved under S45c on 25 January 2022

PDF icon Statement 1162.pdf February 1, 2021
Hope Downs 4 Iron Ore Mine

Attachment 1 to Statement 854 – Realignment of the infrastructure corridor and the Kalgan Creek excess water pipeline realignment, and re-development and relocation of two existing groundwater bores – change to proposal approved under s45C on 28 March 2012.

Attachment 2 to Statement 854 – Removal of Infrastructure Corridor Option 6, changes to Project Area – change to proposal approved under section 45C on 7 January 2013.

Attachment 3 to Statement 854 – Change to Project Area to expand the excess water discharge infrastructure corridor – change to proposal approved under section 45C on 17 September 2013.

Attachment 4 to Statement 854

  • Construction, commissioning, and operation of a new tailings storage facility in previously mined pits in Area 3.
  • The change is for abstraction of recirculation water as a result of seepage from in-pit storage of tailings. Abstraction of up to 3 gigalitres per annum (GL/a) to account for recirculation water in addition to 20 GL/a for dewatering is required (total of 23 GL/a). There is no change to the abstraction of groundwater that is not recirculation water, or the extent of groundwater drawdown from dewatering authorised under Schedule 1 of MS 854 (up to 140 metres of drawdown to approximately 500 metres relative to sea level (RSL)).
  • Figures 2 and 3 have been referenced in the Key Characteristics Table.

The conceptual mine layout and associated infrastructure for the proposal in Schedule 1 of MS 854 (Figure 3) has been updated to reflect the changes described above and the elements of the proposal that have been implemented in accordance with the key characteristics of the approved proposal.

The reference to figures depicting the location of the physical and operational elements have been corrected in the Key Characteristics Table (to Figures 2 and 3) as it is these figures that show the mine layout and associated infrastructure for the proposal. – change to proposal approved under section 45C on 2 October 2020.

PDF icon Ministerial Statement 854.pdf October 2, 2020
Roy Hill 1 Iron Ore Mining Stage 2

Attachment 1 to Statement 829 - Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates - approved on 3 February 2012.

Attachment 2 to Statement 829 - Change to mine dewatering volume and rate; change to description of saline water disposal to include use for dust supression; minor changes to units of measurement (volume) - approved on 11 February 2016.

Attachment 3 to Statement 829 - Change to allow for an increase in mine dewatering volumes and Managed Aquifer Recharge reinjection of surplus dewatered groundwaterfor a trial period of two (2) years - approved on 11 May 2018.

Attachment 4 to Statement 829 - Removal of processing rate - approved on 21 May 2018.

Attachment 5 to Statement 829 – Up to three year extension of the current two year reinjection trial disposing of surplus water resulting from mine dewatering, reject water from reverse osmosis plant and decant from Tailings Storage Facilities (TSF), with salinity up to 30,000 mg/L TDS, into recharge basins and/or reinjection bores within the mine tenement – change to proposal approved under section 45C on 30 September 2020.

PDF icon Ministerial Statement 829.pdf September 30, 2020
Roy Hill 1 Iron Ore Mining Project Stage 1

Attachment 1 to Statement 824 – Revision of the approved realignment of Marble Bar Road – change to proposal approved under s45C on 15 December 2010.

Attachment 2 to Statement 824 – Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates (this attachment replaces Figure 2, Figure 3, Figure 4 and Figure 5 of Schedule 1, and the table of GIS coordinates in Schedule 2) – change to proposal approved under section 45C on 3 February 2012.

Attachement 3 to Statement 824 – Condition 10-1(6) is deleted, and replaced - change to conditions approved under section 45C on 16 June 2015.

Attachment 4 to Statement 824 – Change to mine dewatering volume and rate; change to description of saline water disposal to include use for dust suppression; minor changes to units of measurement (volume) – change to conditions approved under section 45C on 11 February 2016.

Attachment 5 to Statement 824 - Change to allow for an increase in mine dewatering volumes and Managed Aquifer Recharge reinjection of surplus dewatered groundwater for a trial period of two (2) years - change to conditions approved under section 45C on 11 May 2018.

Attachment 6 to Statement 824 - Removal of processing rate - change to conditions approved under section 45C on 21 May 2018.

Attachment 7 to Statement 824 - Change to in-pit tailings disposal at Zulu 5 Pit - change to conditions approved under section 45C on 25 March 2019.

Attachment 8 to Statement 824 - Up to three year extension of the current two year reinjection trial disposing of surplus water resulting from mine dewatering, reject water from reverse osmosis plant and decant from Tailings Storage Facilities (TSF), with salinity up to 30,000 mg/L TDS, into recharge basins and/or reinjection bores within the mine tenement. Change to proposal approved under S45c on 30 September 2020.

PDF icon Ministerial Statement 824.pdf September 30, 2020
Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning

Attachment 3 to Statement 782 – Removal of different options for management of tailings in the description of the proposal; updated description of the proposal including the ‘Proposal footprint’ and ‘Mine Development Envelope’; and removal of elements that are not key proposal characteristics relevant to the environment or managed under other legislation – change to proposal approved under section 45C on 17 June 2015.

Attachment 4 to Statement 782 – Addition to pit area to enable pit remediation and removal of 2 ha from the Environmental Noise Bund area– change to proposal approved under section 45C on 12 June 2017.

Attachment 5 to Statement 782:

  • Clearing of 200 hectares within the development envelope to mine two areas within the existing Fimiston open pit, referred to as Morrison and Brownhill, and develop additional supporting infrastructure;
  • Addition of 4 hectares to pit area to enable mining within the Firmiston open pit; and
  • Removal of 4 hectares from the Environmental Noise Bund area including updated coordinates

Change to proposal approved under section 45C on 26 June 2018

Attachment 6 to Statement 782:

  • Revision of the proposal’s Development Envelope to include the Kaltails Supply Borefield
    utilised as a water supply borefield in a defined development envelope (borefield formerly
    approved under a previous ministerial statement);
  • Establishment of a Managed Aquifer Recharge system (the Kaltails Managed Aquifer
    Recharge Project) utilising the existing Kaltails Supply Borefield; and
  • Inclusion of 73 hectares of clearing within the revised Development Envelope to support the
    Kaltails Managed Aquifer Recharge Project (clearing formerly approved for the borefield
    under a previous ministerial statement).

Change to proposal approved under section 45C on 10 October 2018.

Attachment 7 to Statement 782 - • Changes:

  • Expansion of the proposal’s Development Envelope by 272 hectares to includea two-cell paddock expansion of the Fimiston II TSF and associated infrastructure.
  • Increase in the authorised extent of clearing by 295 hectares to allow the construction of the two-cell paddock expansion of the Fimiston II TSF and associated infrastructure.
  • Extension of the Fimiston Open Pit to include Fimiston South.
  • Change to Figure 1 and Figure 2 to detail expansion of the Fimiston II TSF, expansion of Fimiston Open Pit, change to noise bund location and Development Envelope.

Change to proposal approved under section 45C on 30 September 2020

PDF icon Ministerial Statement 782.pdf September 30, 2020
Telfer Project, Expansion of Telfer Gold Mine, Great Sandy Desert

Attachment 1 to Statement 606 - To clear 145 hectares of land to house an additional waste dump and additional topsoil stockpiles – change to proposal approved under section 45C on 7 January 2008.

Attachment 2 to Statement 606 – To increase disturbance impacts, by clearing an additional 11.5 hectares for extension of the existing staggers borefield, and increase to ore production, processing throughput and water supply – change to proposal approved under section 45C on 11 January 2012.

Attachment 3 to Statement 606 – Increase land disturbance area, correct miscalculated land disturbance area, extend waste rock dumps, expand dump leach facilities, amend water supply and administrative changes to key characteristics table – change to proposal approved under section 45C on 28 Jun 2013.

Attachment 4 to Statement 606 – construction of an additional tailings storage facility (TSF8) on an area previously approved for waste rock disposal – change to proposal approved under section 45C on 16 September 2020.

PDF icon Statement 606.pdf September 16, 2020
Proposed Rare Earths Mining and Beneficiation at Mt Weld, Laverton and Secondary Processing at Meenaar, near Northam (s46)

Attachment 1 to Statement 476 – Removal of secondary processing at Meenaar; increased rate of mining and beneficiation, change in transport routes, and return of residues to Mt Weld for disposal – change to proposal approved under s45C on 14 May 2003.

Attachment 2 to Statement 476 – Change to transport route to allow transport of concentrate through Fremantle or Esperance – change to proposal approved under s45C on 8 February 2005.

Attachment 3 to Statement 476 – Construction of an access road requiring vegetation clearance between Mt Weld Mine Site and Mt Weld – Elora Road – change to proposal approved under s45C on 31 July 2006.

Attachment 4 to Statement 476 – Mt Weld Rare Earths Project Stage 2 Expansion of Operations - increase in production and associated additional infrastructure – change to proposal approved under s45C on 11 January 2012.

Attachment 5 to Statement 476 – Increase “life of project”; increase in the “area of disturbance” from approximately <270 hectares (ha) to <370 ha (55 ha for Mining Campaign 2, and 45 ha for the increase in Tailings Dam Area footprint from 27.3 to 67.3 ha) and Process Water Pond Facility (5 ha); remove “size of ore body”; remove “maximum carbon dioxide output”; and remove “development stages” – change to proposal approved under section 45C on 10 December 2013.

Attachment 7 to Statement 476 – Increase in the area of disturbance from 370 ha to 429 ha – an increase of 59 ha; and • An increase in the development envelope from 455 ha to 505 ha – an increase of 50 ha. – changes to proposal approved under section 45C on 16 September 2020.

PDF icon Ministerial Statement 476.pdf September 16, 2020
Port Facility Upgrade - Dredging and Wharf Construction - Third Berth Anderson Point Port Hedland

Attachment 1 to Statement 771 - Dredging of the third berth at Anderson Point - program additions and new dredge spoil settlement area - change to proposal approved on 14 November 2008.

PDF icon Ministerial Statement 771 August 12, 2020
Parker Range (Mount Caudan) Iron Ore Project

Attachment 1 to Ministerial Statement 892 - Changes:

  • Change in development envelope
  • Change in disturbance footprint and vegetation clearing
  • Change in open pit dimensions
  • Removal of tailings storage facility
  • Change in pit dewatering volume
  • Change in surplus dewater management

Changes to conditions approved under S45C on 26 June 2020.

PDF icon Ministerial Statement 892.pdf June 26, 2020

Pages