Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
High Street Upgrade |
Attachment 1 to Ministerial Statement 1096 - Changes:
Changes approved under s45c on 22 April 2020. Attachment 2 to Ministerial Statement 1096 - Changes:
Changes approved under s45c on 3 February 2021. |
![]() |
February 3, 2021 |
Lake Wells Potash Project |
Attachment 1 to Statement 1162 - Changes: Changes approved under S45c on 25 January 2022 |
![]() |
February 1, 2021 |
Hope Downs 4 Iron Ore Mine |
Attachment 1 to Statement 854 – Realignment of the infrastructure corridor and the Kalgan Creek excess water pipeline realignment, and re-development and relocation of two existing groundwater bores – change to proposal approved under s45C on 28 March 2012. Attachment 2 to Statement 854 – Removal of Infrastructure Corridor Option 6, changes to Project Area – change to proposal approved under section 45C on 7 January 2013. Attachment 3 to Statement 854 – Change to Project Area to expand the excess water discharge infrastructure corridor – change to proposal approved under section 45C on 17 September 2013. Attachment 4 to Statement 854
The conceptual mine layout and associated infrastructure for the proposal in Schedule 1 of MS 854 (Figure 3) has been updated to reflect the changes described above and the elements of the proposal that have been implemented in accordance with the key characteristics of the approved proposal. The reference to figures depicting the location of the physical and operational elements have been corrected in the Key Characteristics Table (to Figures 2 and 3) as it is these figures that show the mine layout and associated infrastructure for the proposal. – change to proposal approved under section 45C on 2 October 2020. |
![]() |
October 2, 2020 |
Roy Hill 1 Iron Ore Mining Stage 2 |
Attachment 1 to Statement 829 - Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates - approved on 3 February 2012. Attachment 2 to Statement 829 - Change to mine dewatering volume and rate; change to description of saline water disposal to include use for dust supression; minor changes to units of measurement (volume) - approved on 11 February 2016. Attachment 3 to Statement 829 - Change to allow for an increase in mine dewatering volumes and Managed Aquifer Recharge reinjection of surplus dewatered groundwaterfor a trial period of two (2) years - approved on 11 May 2018. Attachment 4 to Statement 829 - Removal of processing rate - approved on 21 May 2018. Attachment 5 to Statement 829 – Up to three year extension of the current two year reinjection trial disposing of surplus water resulting from mine dewatering, reject water from reverse osmosis plant and decant from Tailings Storage Facilities (TSF), with salinity up to 30,000 mg/L TDS, into recharge basins and/or reinjection bores within the mine tenement – change to proposal approved under section 45C on 30 September 2020. |
![]() |
September 30, 2020 |
Roy Hill 1 Iron Ore Mining Project Stage 1 |
Attachment 1 to Statement 824 – Revision of the approved realignment of Marble Bar Road – change to proposal approved under s45C on 15 December 2010. Attachment 2 to Statement 824 – Change to mining schedule, location of key infrastructure, groundwater drawdown figure and coordinates (this attachment replaces Figure 2, Figure 3, Figure 4 and Figure 5 of Schedule 1, and the table of GIS coordinates in Schedule 2) – change to proposal approved under section 45C on 3 February 2012. Attachement 3 to Statement 824 – Condition 10-1(6) is deleted, and replaced - change to conditions approved under section 45C on 16 June 2015. Attachment 4 to Statement 824 – Change to mine dewatering volume and rate; change to description of saline water disposal to include use for dust suppression; minor changes to units of measurement (volume) – change to conditions approved under section 45C on 11 February 2016. Attachment 5 to Statement 824 - Change to allow for an increase in mine dewatering volumes and Managed Aquifer Recharge reinjection of surplus dewatered groundwater for a trial period of two (2) years - change to conditions approved under section 45C on 11 May 2018. Attachment 6 to Statement 824 - Removal of processing rate - change to conditions approved under section 45C on 21 May 2018. Attachment 7 to Statement 824 - Change to in-pit tailings disposal at Zulu 5 Pit - change to conditions approved under section 45C on 25 March 2019. Attachment 8 to Statement 824 - Up to three year extension of the current two year reinjection trial disposing of surplus water resulting from mine dewatering, reject water from reverse osmosis plant and decant from Tailings Storage Facilities (TSF), with salinity up to 30,000 mg/L TDS, into recharge basins and/or reinjection bores within the mine tenement. Change to proposal approved under S45c on 30 September 2020. |
![]() |
September 30, 2020 |
Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning |
Attachment 3 to Statement 782 – Removal of different options for management of tailings in the description of the proposal; updated description of the proposal including the ‘Proposal footprint’ and ‘Mine Development Envelope’; and removal of elements that are not key proposal characteristics relevant to the environment or managed under other legislation – change to proposal approved under section 45C on 17 June 2015. Attachment 4 to Statement 782 – Addition to pit area to enable pit remediation and removal of 2 ha from the Environmental Noise Bund area– change to proposal approved under section 45C on 12 June 2017. Attachment 5 to Statement 782:
Change to proposal approved under section 45C on 26 June 2018 Attachment 6 to Statement 782:
Change to proposal approved under section 45C on 10 October 2018. Attachment 7 to Statement 782 - • Changes:
Change to proposal approved under section 45C on 30 September 2020 |
![]() |
September 30, 2020 |
Telfer Project, Expansion of Telfer Gold Mine, Great Sandy Desert |
Attachment 1 to Statement 606 - To clear 145 hectares of land to house an additional waste dump and additional topsoil stockpiles – change to proposal approved under section 45C on 7 January 2008. Attachment 2 to Statement 606 – To increase disturbance impacts, by clearing an additional 11.5 hectares for extension of the existing staggers borefield, and increase to ore production, processing throughput and water supply – change to proposal approved under section 45C on 11 January 2012. Attachment 3 to Statement 606 – Increase land disturbance area, correct miscalculated land disturbance area, extend waste rock dumps, expand dump leach facilities, amend water supply and administrative changes to key characteristics table – change to proposal approved under section 45C on 28 Jun 2013. Attachment 4 to Statement 606 – construction of an additional tailings storage facility (TSF8) on an area previously approved for waste rock disposal – change to proposal approved under section 45C on 16 September 2020. |
![]() |
September 16, 2020 |
Proposed Rare Earths Mining and Beneficiation at Mt Weld, Laverton and Secondary Processing at Meenaar, near Northam (s46) |
Attachment 1 to Statement 476 – Removal of secondary processing at Meenaar; increased rate of mining and beneficiation, change in transport routes, and return of residues to Mt Weld for disposal – change to proposal approved under s45C on 14 May 2003. Attachment 2 to Statement 476 – Change to transport route to allow transport of concentrate through Fremantle or Esperance – change to proposal approved under s45C on 8 February 2005. Attachment 3 to Statement 476 – Construction of an access road requiring vegetation clearance between Mt Weld Mine Site and Mt Weld – Elora Road – change to proposal approved under s45C on 31 July 2006. Attachment 4 to Statement 476 – Mt Weld Rare Earths Project Stage 2 Expansion of Operations - increase in production and associated additional infrastructure – change to proposal approved under s45C on 11 January 2012. Attachment 5 to Statement 476 – Increase “life of project”; increase in the “area of disturbance” from approximately <270 hectares (ha) to <370 ha (55 ha for Mining Campaign 2, and 45 ha for the increase in Tailings Dam Area footprint from 27.3 to 67.3 ha) and Process Water Pond Facility (5 ha); remove “size of ore body”; remove “maximum carbon dioxide output”; and remove “development stages” – change to proposal approved under section 45C on 10 December 2013. Attachment 7 to Statement 476 – Increase in the area of disturbance from 370 ha to 429 ha – an increase of 59 ha; and • An increase in the development envelope from 455 ha to 505 ha – an increase of 50 ha. – changes to proposal approved under section 45C on 16 September 2020. |
![]() |
September 16, 2020 |
Port Facility Upgrade - Dredging and Wharf Construction - Third Berth Anderson Point Port Hedland |
Attachment 1 to Statement 771 - Dredging of the third berth at Anderson Point - program additions and new dredge spoil settlement area - change to proposal approved on 14 November 2008. |
![]() |
August 12, 2020 |
Parker Range (Mount Caudan) Iron Ore Project |
Attachment 1 to Ministerial Statement 892 - Changes:
Changes to conditions approved under S45C on 26 June 2020. |
![]() |
June 26, 2020 |