| Title | S45C changes to proposal | Ministerial Statement | Last updated |
|---|---|---|---|
| Increase in abstraction and reinjection at Cloudbreak Mine |
Attachment 1 to Statement 1010 – Increase the existing groundwater and reinjection abstraction limit at the Cloudbreak mine from 150 GL/annum to 175 GL/annum.. Change to proposal approved under section 45C on 9 February 2024. |
|
February 9, 2024 |
| Cloudbreak Life of Mine Expansion |
Attachment 1 to Statement 899 – Change to Table 1 in Schedule 1 for increase in reinjection requirements and integration of groundwater management between Christmas Creek and Cloudbreak mines – change to proposal approved under section 45C on 20 December 2013. Attachment 2 to Statement 899 – Temporary increase in dewatering from 100 GL/a to 125 GL/a until 31 July 2016 and temporary increase in reinjection from 95 GL/a to 115 GL/a until 31 July 2016 – change to proposal approved under section 45C on 24 November 2014. Attachment 3 to Statement 899 – Expansion of the Project Area by 590 hectares to include tenements M46/450 and M46/453; correction of clerical error to Project Area to state 34,800 ha and include the 590 ha increase, totalling 35,390 ha; and correction of clerical error to Existing Mine from 5,000 ha to state 5,500 ha – change to proposal approved under section 45C on 20 March 2015. Attachment 4 to Statement 899 - Temporary Presence of Water in Mining Pits – change to proposal approved under section 45C on 9 June 2017. Attachment 5 to Statement 899 - Changes:
Attachment 6 to Statement 899 - Changes:
Changes to proposal approved under section 45C on 6 June 2019. Attachment 7 to Statement 899 – Increase the existing groundwater and reinjection abstraction limit at the Cloudbreak mine from 150 GL/annum to 175 GL/annum. Change to proposal approved under section 45C on 9 February 2024. |
|
February 9, 2024 |
| Yanchep Rail Extension: Part 2 – Eglinton to Yanchep |
Attachment 1 to Statement 1129 - Increase in the development envelope of 1.3 ha. Increase in the extent of clearing of native vegetation of 3.3 ha. Change to proposal approved under s45C 4 November 2020. Attachment 2 to Statement 1129 - Increase the development envelope by 5.69 ha. Increase the extent of clearing of native vegetation by 1.21 ha Change to proposal approved under s45C 15 December 2023. |
|
December 15, 2023 |
| Resource Recovery Facility, Red Hill |
Attachment 1 and 2 to Statement 976 - Change to short description in Schedule 1 to allow aerobic composting. Removal of Schedule 2 for the gasification option. Proposal description is amended and condition 1, 6.1, 7.1 and 9 are amended. Change to conditions approved under s. 45C on 14 November 2023. |
|
November 14, 2023 |
| Port Hedland Waste to Energy and Materials Recovery Facility (Ministerial Statement 935); Resource Recovery Facility Red Hill (976); East Rockingham Waste to Energy and Materials Recovery Facility (994); Kwinana Waste to Energy Project (1016) (s46) [2159] |
Attachment 1 to Ministerial Statement 1092 - Change to conditions approved 14 November 2023. |
|
November 14, 2023 |
| Resource Recovery Facility, Red Hill (S46) [2200] |
Attachment 1 to Ministerial Statement 1122 - Change to conditions approved 14 November 2023. |
|
November 14, 2023 |
| Eliwana Iron Ore Mine |
Attachment 1 to Statement 1109 - Expand the approved Eliwana Mine Development Envelope by 2,496 ha to incorporate an additional two open cut iron ore pits (Penzance and La Manchapits), heavy haulage access and mining infrastructure to support mining of these pits above and below the water table. Direct clearing within the expanded development envelope is up to an additional 185 ha. Extend mining at the six existing approved pits in the Flying Fish area to below water table (mining in the Flying Fish area was limited to above water table mining in the original referral and EPA Report 1642), with no changes to the approval discharge extent of surplus water. Changes approved under s. 45C on 6 November 2023. |
|
November 6, 2023 |
| Coburn Mineral Sand Project |
Attachment 1 to Statement 723 – Change to the mining method and the location of the mine infrastructure – change to proposal approved under s45C on 16 March 2007. Attachment 2 to Statement 723 – Change to project life and location of disturbance footprint – change to proposal approved under s45C on 21 September 2011. Attachment 3 to Statement 723 – Removal of time restrictions for increasing rate of mining and processing as well as the estimated volume of tailings – change to proposal approved under section 45C on 10 April 2014. Attachment 4 to Statement 723 – Modification of the:
Change to proposal approved under section 45C on 23 September 2020. Attachment 5 to Statement 723 – Changes:
Change to proposal approved under section 45C on 9 November 2021. Attachment 6 to Statement 723 Realign the approved disturbance footprint of 3585.5 ha to include clearing for mine infrastructure and inclusion of a development envelope of 4,014 ha. Construct and operate an aerodrome with a disturbance footprint of 55.4 ha. Change to proposal approved under section 45C on 26 October 2023. |
|
October 26, 2023 |
| Keysbrook Mineral Sands Mine |
Attachment 2 to Statement 810 – Increase in proposal area to accommodate wet processing plant adjacent to the mining area, and change to area of vegetation to be protected – change to proposal approved under section 45C on 4 February 2013. Attachment 3 to Statement 810 – Changes:
Changes to proposal approved under section 45C on 14 October 2019. Attachment 4 to Statement 810 – Amend the approved mining area from 1532 hectares to 1602 hectares and include an additional area on Lot 56 Westcott Road, Keysbrook. Increase the Life of Mine from 9 to 10 years. Increase product quantity from 1,020,000 tonnes to 1,070,000 tonnes of heavy mineral concentrate. Amend the figures of MS 810 to include additional mining area. Change to proposal approved under section 45C on 18 September 2023. Attachment 5 to Statement 810 – Amend the approved mining area from 1602 hectares to 1744.3 hectares and include an additional area on Lot 63 Hopeland Road, Keysbrook. Increase the Life of Mine from 10 to 12 years. Increase product quantity from 1,070,000 tonnes to 1,135,000 tonnes of heavy mineral concentrate. Amend the figures of MS 810 to include additional mining area. Change to proposal approved under section 45C on 16 October 2023. |
|
September 18, 2023 |
| Kemerton Power Station |
Attachment 1 to Statement 645 - In Schedule 1, Table 1: Addition to liquid fuel (backup) of up to 300 hours ultra low sulphur diesel for the 2005/2006 financial year period (1 July 2005 - 30 June 2006) - change to proposal under s45C approved on 10 October 2005. Attachment 2 to Statement 645 - In Schedule 1, Table 1: Addition to liquid fuel (backup) of up to 300 hours ultra low sulphur diesel for the 2006/2007 financial year period (1 July 2006 - 30 June 2007) - change to proposal under s45C approved on 20 April 2006. Attachment 3 to Statement 645 - In Schedule 1, Table 1: Addition to liquid fuel (backup) of up to 600 hours ultra low sulphur diesel for the 2006/2007 financial year period (1 July 2006 - 30 June 2007) - change to proposal under s45C approved on 19 December 2006. Attachment 4 to Statement 645 - Increase in time of operation of the power station on liquid fuel (ultra low sulphur diesel) from 100 hours/year to 600 hours/year for the 2007-2008 financial year only - change to proposal under s45C approved on 6 December 2007. Attachment 5 to Statement 645 - Increase in time of operation of the power station on liquid fuel (ultra low sulphur diesel) from 100 hours/year to 600 hours/year for the 2008-2009 financial year only. Note: the maximum allowable annual operating time for the power station (i.e. natural gas and liquid fuel operating hours combined) remains unchanged at 1,000 hours/year - change to proposal under s45C approved on 5 September 2008. Attachment 6 to Statement 645 - Increase in time of operation of the power station from 1,000 hours/year [900 hours/year on natural gas and 100 hours/year on liquid fuel (ultra low sulphur diesel)] to 2,000 hours/year [1,800 hours/year on natural gas and 200 hours/year on liquid fuel (ultra low sulphur diesel)] - change to proposal under s45C approved on 9 December 2008. Attachment 7 to Statement 645 - Increase in operation of the power station from 2,000 hours per year to 13,800 hours per year on natural gas. Increased plant operating modes detailed in Table 2. Increased estimated capacity factor to 80%. Increased energy generated per year to 2,139 GWh. Increased authorised consumption of natural gas to 46 PJ. Increased greenhouse gas emissions detailed in Table 2. Increased air emissions detailed in Table 2. The Attachment is to have effect for a period of 12 months only from the date of approval after which, Attachment 6 to Statement 645 will recommence to have effect. Change to proposal under s45C approved on 11 August 2023. |
|
August 11, 2023 |