Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Thornlie-Cockburn Link |
Attachment 3 to Statement 1114 - Increase in the development envelope of 4.1 ha and increase in the extent of clearing of native vegetation of 1.0 ha. Change to proposal approved under s45C 9 October 2020. Attachment 4 to Statement 1114 - Increase in the development envelope of 0.6 ha. Increase in the disturbance footprint of 0.5 ha. Increase in the extent of clearing of native vegetation of 1.5 ha. Change to conditions approved under s45C 21 October 2021. Attachment 5 to Statement 1114 – Increase in the development envelope and disturbance footprint of 0.4 ha to provide additional areas required to facilitate construction of retaining walls. Change to proposal approved under s45C 4 May 2022 Attachment 6 to Statement 1114 – Increase in the development envelope of 22.1 ha. Increase in the disturbance footprint of 22.1 ha. Increase in the extent of clearing of native vegetation of 3 ha. Change to proposal approved under s45C 22 June 2023. |
![]() |
June 22, 2023 |
Solomon Iron Ore Project Expansion |
Attachment 1 to Statement 1062
Changes approved under s. 45C on 7 June 2023. |
![]() |
June 7, 2023 |
Worsley Alumina - Efficiency and Growth Increase of Existing Operations to 4.4Mtpa Alumina Production |
Attachment 1 to Statement 719 - Change the power plant from a single coal fired boiler to two circulating fluidized bed co-generation boilers - change to proposal approved on 26 October 2007. Attachment 2 to Statement 719 - Increase the maximum production capacity to 4.7 million tonnes per annum - change to proposal approved on 26 February 2008. Attachment 3 to Statement 719 - Clear 29 hectares of State forest for a lay down area for expansion-related plant and equipment and further stockpiling of overburden material for construction of bauxite residue disposal areas - change to proposal approved on 17 April 2008. Attachment 4 to Statement 719 - Clear 16.5 hectares of State forest to expand freshwater lake at the bauxite refinery - change to proposal approved on 25 July 2008. Attachment 5 to Statement 719 - Install an additional secondary crushing plant adjacent to the existing crushing facilities at Saddleback - change to proposal approved on 23 January 2009. Attachment 6 to Statement 719 - Change to conveyor operations - change to proposal approved under s45C on 27 June 2011. Attachment 7 to Statement 719 – Change to Sulphur Dioxide and Carbon Monoxide emissions – change to proposal approved under s45C on 30 April 2012. Attachment 8 to Statement 719 - Increase in clearing within the Refinery Lease Area from 45.5 to 66.6 ha - change to proposal approved under s45C on 15 April 2016. Attachment 9 to Statement 719 - Construction of a temporary water supply pipeline and associated pumping infrastructure from Wellington Dam to the Worsley Refinery which requires clearing of up to 2 ha of undisturbed native vegetation and up to 6 ha previously native vegetation within Wellington National Park - change to proposal approved under s45C on 30 November 2016. Attachment 10 to Statement 719 - Conversion of the existing coal fired boilers to a natural gas fired facility (boilers) within the existing power and steam raising facilities at the Worsley Alumina Refinery. - change to proposal approved under s45C on 16 May 2023. |
![]() |
May 16, 2023 |
Greenbushes Lithium Mine Expansion |
Attachment 1 to Ministerial Statement 1111 - Modification to the Mine Development Envelope. Change to proposal approved under S45c on 6 April 2020. Attachment 2 to Ministerial Statement 1111 - A revised Mine Access Road design; Construction of a worker accomodation village; Relocation of the rehabilitation material stockpiles; and Other changes to the development envelope to include: |
![]() |
May 15, 2023 |
Bunbury Outer Ring Road (Northern and Central Sections) |
Attachment 1 to Statement 1155 - Decrease in the development envelope of 19 ha. Decrease in the extent of clearing of native vegetation of 8 ha. |
![]() |
May 10, 2023 |
Bunbury Outer Ring Road (Southern Section) |
Attachment 1 to Statement 1191 – Minor change to conditions approved under s45C(5) 22 June 2022. Attachment 2 to Statement 1191 – Condition 2-5 is amended. Approved under s45C(5) 15 February 2023. |
![]() |
February 15, 2023 |
Leslie Salt project, expansion of ponds, Port Hedland |
Attachment 1 to Statement 147 - Increase in salt production to 3.2 million tonnes per annum. Section 45C change to proposal approved on 27 October 2004. Attachment 2 to Statement 147 - Increase in salt production from 3.2 million tonnes per annum to approximately 4.5 million tonnes per annum for approximately 2 years from the start of mining. Section 45C change to proposal approved on 13 July 2005. Attachment 3 to Statement 147 - Changes to Table 1, Schedule 1 - Key Characteristics Table. Section 45C change to proposal approved on 10 December 2013. Attachment 4 to Statement 147 - Change to Bitterns Discharge Volume. Section 45C change to proposal approved on 23 April 2018. Attachment 5 to Statement 147 - Removal of the 3.2 million tonnes per annum solar salt production limit from Attachment 4 of MS 147. Amendment to correct typographic error.. Section 45C change to proposal approved on 22 December 2022. |
![]() |
December 21, 2022 |
Thunderbird Mineral Sands Project |
Attachment 1 to Ministerial Statement 1080 Changes: Changes approved under s.45C on 8 November 2022. |
![]() |
November 8, 2022 |
Regional Resource Recovery Centre, Pt Lot 78 and Pt Lot 85 Bannnister Road, Canning Vale |
Attachment 1 to Statement 517 - Changes:
Changes approved under S45c on 2 October 2020. |
![]() |
October 27, 2022 |
Jansz Feed Gas Pipeline Barrow Island Nature Reserve |
Attachment 2 to Statement 769 - Changes: • Incorporation of Feed Gas Pipeline System description. • Amendment of descriptions of shore crossing and electrohydraulic umbilicals. Change approved 24 October 2022. |
![]() |
October 24, 2022 |