Attachment 1 to Statement 723 – Change to the mining method and the location of the mine infrastructure – change to proposal approved under s45C on 16 March 2007.
Attachment 2 to Statement 723 – Change to project life and location of disturbance footprint – change to proposal approved under s45C on 21 September 2011.
Attachment 3 to Statement 723 – Removal of time restrictions for increasing rate of mining and processing as well as the estimated volume of tailings – change to proposal approved under section 45C on 10 April 2014.
Attachment 4 to Statement 723 – Modification of the:
- disturbance footprint
- pit design
- mining schedule
- infrastructure relocations to align with the optimised pits
- access track realignments
- project life
Change to proposal approved under section 45C on 23 September 2020.
Attachment 5 to Statement 723 – Changes:
- To construct an intersection between the access road and the North West Coastal Highway
- Relocation of borrow pits along the access road
- Realign the access road to remove a bend
- To include a power and pipeline corridor to the Wet Concentrator Plant.
Change to proposal approved under section 45C on 9 November 2021.
Attachment 6 to Statement 723 Realign the approved disturbance footprint of 3585.5 ha to include clearing for mine infrastructure and inclusion of a development envelope of 4,014 ha. Construct and operate an aerodrome with a disturbance footprint of 55.4 ha. Change to proposal approved under section 45C on 26 October 2023.