| Title | S45C changes to proposal | Ministerial Statement | Last updated |
|---|---|---|---|
| Mining Area C - Southern Flank |
Attachment 1 to Ministerial Statement 1072 - Changes:
Changes to proposal approved under section 45c on 15 January 2020. Attachment 2 to Ministerial Statement 1072 - Ministerial Statement Figure 4 to be replaced with a figure identifying the correct area for “Area A” due to an administrative error. Figure updated that accurately reflects areas of ‘Good’ to ‘Excellent’ condition native vegetation to be offset. Changes to proposal approved under s.45c on 17 June 2025. |
|
June 17, 2025 |
| Duplication of synthetic rutile capacity, Capel |
Attachment to Statement 291 - change to description in Consultative Environmental Review - approved on 18 August 2005. Attachment to Statement 291 - change to description of Proposal in Consultative Environmental Review - approved on 3 October 2005. |
|
April 7, 2025 |
| Turkey Point Access Road and Bridge |
Attachment 1 to Statement 1192 - Amendments to introduction, condition 1, figure and schedule 1. Change to statement approved under s. 45C on 5 September 2024. Attachment 2 to Statement 1192 – Amendments to condition 1 (figure and schedule 1), condition 3-4 and the addition of a definition for Temporary construction causeway. Changes to statement approved under s. 45C on 17 March 2025 |
|
March 17, 2025 |
| Alkimos Seawater Desalination Plant |
Attachment 1 to Statement 1207 - Increase the proposal development envelope from 141.6 hectares (ha) to 142.73 ha. Decrease the marine development envelope from 11.45 ha to 11.42 ha. Increase the terrestrial development envelope from 130.15 ha to 131.31 ha. Proponent updates to the ‘Proposal Content Document’, as amended by the change to proposal approved under s.43A on 7 March 2023 to reflect the amendment approved under s.45C on 17 April 2024.Changes to conditions to reflect the change in the authorised extent of impacts. Change to conditions approved under s45C on 17 April 2024 Attachment 2 to Statement 1207 - Increase the proposal development envelope from 142.73 hectares (ha) to 195.74 ha. Increase the terrestrial development envelope from 131.31 ha to 184.32 ha. Decrease the clearing of native vegetation from 51.20 ha to no more than 50.95 ha. Changes to conditions to reflect the change in the authorised extent of impacts to flora and vegetation, terrestrial fauna, and landform environmental values. Remove condition B1-2 and Figure 3 relating to the requirement for additional survey for Banksia attenuata woodlands over species rich dense shrublands (floristic community type 20a) threatened ecological community. Change to conditions approved under s45C on 21 January 2025. Attachment 3 to Statement 1207 - Increase the marine development envelope from 11.42 hectares (ha) to 77.79 ha. |
|
March 13, 2025 |
| Tutunup Titanium Minerals Mine |
Attachment to Statement 621 - Change to description in Schedule 1 - change to proposal under s45C approved on 28 July 2005. Attachment to Statement 621 - Change to description in Schedule 1 - change to proposal under s45C approved on 17 May 2006. |
|
February 25, 2025 |
| Extension Hill haematite haulage, road and rail siding |
Attachment 1 to Statement 786 – Increased Rail Siding stockpile capacity and water use for dust suppression, and increased variability in train movements per day – change to proposal approved under section 45C on 14 February 2012. Attachment 2 to Statement 786 – Removal of the General Description in Schedule 1, removal of the elements that are not key characteristics relevant to the environment, amendment to the element 'Vegetation Clearing' – change to proposal approved under section 45C on 10 March 2014. |
|
January 29, 2025 |
| Shine Iron Ore Project |
Attachment 1 to Statement 940 - Reduce the development envelope from 646 ha to 595 ha. Change to proposal approved under S45c on 5 May 2020. |
|
January 29, 2025 |
| Waitsia Gas Project Stage 2 |
Attachment 1 to Statement 1164 - Changes:
Changes to proposal approved under S45c on 4 October 2021. Attachment 2 to Statement 1164 - Changing production facility capacity from 250 terajoules per day to an annual limit of 91.25 petajoules. Increasing the size of the development envelope from 409.25 ha to 580.9 ha. Increasing the number of wells from 8 to 19. Increasing the disturbance footprint from 397.75 ha to 479.2 ha. Change to proposal approved under S45c on 16 April 2024. Attachment 4 to Statement 1164 - Increasing the size of the development envelope from 580.9 ha to 581.2 ha. Increasing the disturbance footprint from 479.2 ha to 479.6 ha within the |
|
January 21, 2025 |
| Sorby Hills Silver Lead Zinc Project |
Attachment 1 to Ministerial Statement 964 - Access road extension to the realigned Moonamang Rd. Inclusion of accommodation village. Revision of Figures 1-3. Changes approved under s45C on 20 June 2022. Attachment 2 to Ministerial Statement 964 - An increase to the development envelope, and realignment of an access road. |
|
December 18, 2024 |
| Sorby Hills Silver Lead Zinc Project (s46) [2170] |
Attachment 1 to Ministerial Statement 1097 - Condition 3 is amended. Changes approved under s45C on 18 December 2024. |
|
December 18, 2024 |