S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Northern Goldfields Interconnect Pipeline

Attachment 1 to Statement 1184 – Increase in the development envelope of 15 ha to provide an area for the Pinnacles Temporary Work Area construction, consisting of construction accommodation, laydown areas and associated infrastructure. Change to proposal approved under s45C 14 June 2022

PDF icon Statement 1184.pdf June 14, 2022
Expansion of Jurien Gypsum Mining Operation ML70/1161 (s. 46) [1820]

Attachment 1 to Statement 954 - Extend the processing envelope by 1.45 ha. Change to conditions approved under s45C 18 May 2022.

PDF icon Statement No. 954.pdf May 18, 2022
Malaga to Ellenbrook Rail Works

Attachment 1 to Statement 1156:

  • Amendments to the authorised development footprint in Figure 1, Figure 2 and Figure 3, Schedule 1; and
  • Replacement of the coordinates in Schedule 2.

Changes approved under S45c on 18 August 2021.

Attachment 2 to Statement 1156 - change to amend Table 1 to change rail over road to rail under road at the Gnangara Road/Drumpellier Road intersection. Changes approved under S45c on 14 March 2022

PDF icon Statement 1156.pdf March 14, 2022
Wheatstone Development Proposal (S46) [2178]

Attachment 1 to Statement 1131 - Changes: Amend the Short Description of the proposal and current Authorised Extent (onshore disturbance area) of MS 1131 to include an additional 43.44 hectares associated with the development of the proposed Eastern Port Precinct adjacent to the existing materials offloading facility. CHange to conditions approved under S45c on 2 Februrary 2022.

PDF icon Ministerial Statement 1130, PDF icon Statement 1131.pdf February 2, 2022
Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel

Attachment 1 to Ministerial Statement 767 - Remove the northern portion of Lot 2 Calinup Road from the proposal. Amend the development envelope in the southern portion of Lot 2 Calinup Road
to correctly align with cadastre. Change to conditions approved under S45c on 31 January 2022.

PDF icon Statement 767.pdf January 31, 2022
Kwinana Waste to Energy Project

Attachment 1 to Statement 1016 - amendment to waste types permitted to be processed - inclusion of commercial and industrial waste, which incorporates refuse collection from small businesses (i.e. rateable small businesses) where such a collection is carried out in conjunction with local government residual MSW collection; and amendment to waste types permitted to be processed – inclusion of pre-sorted construction and demolition waste - change to proposal under s45C approved on 31 January 2017.

Attachment 2 to Statement 1016 - Amendment to Summary of the Proposal to remove the specific named reference to the grate technology provider; amendment to Summary of the Proposal to update the Lot number for the location of the proposal; addition and definition of the term ‘Proven Grate Combustion Technology’ to Table 3; and Figure 1 and 2 replaced to reflect the updated Lot number - change to proposal under s45C approved on 3 August 2017.

Attachment 3 to Statement 1016 - change element description of 'waste recieval volume' to 'waste processing volume'. Increase the waste processing volume allowance from 400,000 tpa to 460,000 tpa. Remove reference to the on-site brick making facility. - change to proposal under s45C approved on 31 January 2022.

PDF icon Statement 1016.pdf January 31, 2022
Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland

Attachment 1 to Statement 781 - Alternative access to remove mangroves - change to proposal approved under s45C on 30 March 2009.

Attachment 2 to Statement 781 - Increase the size of the dredge footprint by three hectares to 28 hectares, and increase volume of material to be dredged by 50,000 cubic metres to be 3,950,000 cubic metres - section 45C change to proposal approved on 15 December 2009.

Attachment 3 to Statement 781 - Increase the height of DMMA B1 to 30 mAHD - section 45C change to proposal approved on 25 January 2022.

PDF icon Statement 781.pdf January 25, 2022
North Star Magnetite Project

Attachment 1 to Statement 993 - Change to area of Slurry Corridor Development Envelope; additional clearing for an Aerodrome in the Infrastructure Corridor; addition of Aerodrome to elements in the Infrastructure Development Corridor; and change to area of Infrastructure Corridor Development Envelope - changes to proposal under s45C approved on 22 August 2016.

Attachment 2 to Statement 993 - An increase in groundwater abstraction from the Water Corridor Development Envelope from 14 gigalitres per annum (GL/a) up to 20 GL/a, an increase of 6 GL/a, from the current authorised extent. - changes to proposal under s45C approved on 8 March 2019.

Attachment 3 to Statement 993 - Changes:

  • Decrease in the size of the Infrastructure Corridor Development Envelope (ICDE) from 5,154 ha to 4,950 ha; and
  • Corresponding increase in the Mine Development Envelope (MDE) from 4,970 ha to 5,174 ha.
  • Addition of water return pipeline to elements in the Slurry Corridor Development Envelope (SCDE) and ICDE.
  • Addition of ‘associated infrastructure’ to elements in the ICDE.
  • Correction of the wording ‘transmission pipelines’ with ‘transmission lines’ to elements in the ICDE listed in Table 2.
  • Administrative change to the title of the ICDE within Table 2 from Infrastructure Development Corridor to Infrastructure Corridor Development Envelope. 

Changes to proposal under s45C approved on 2 December 2019.

Attachment 4 to Statement 993 - Changes:

  • Increase in the Infrastructure Corridor Development Envelope (Infrastructure Corridor DE), to allow for revised access to the aerodrome (from 4,950 ha to 5,226 ha);
  • Increase in the Water Corridor Development Envelope (Water Corridor DE), to allow the change in location of groundwater abstraction and water monitoring infrastructure (from 28,696 ha to 31,126 ha);
  • Increase in the Slurry Corridor Development Envelope (Slurry Corridor DE), to allow for the revised pipeline alignment that enters the port area on the western side of FMG rail infrastructure, and to widen the envelope around heritage sites (from 2,781 ha to 3,314 ha); and
  • Increase in the Mine Development Envelope (Mine DE) (from 5,174 ha to 5, 276 ha), to allow the accommodation of the toe of the rock walls for the tailing storage facility (TSF) and access tracks required to the TSF. The design batter angle currently pushes the toe outside the north eastern boundary. The boundary has been adjusted north and east of the TSF.
  • Addition of dewatering of 4.5 Gigalitres per annum (GL/a) below the water table from the mine pit within the Mine Development Envelope (Mining DE) to ensure that the pit is dry during operation.

Changes to proposal under s45C approved on 22 September 2020.

Attachment 5 to Statement 993 - Increase in the clearing permitted within the Slurry Corridor Development Envelope (SCDE) from no more than 315 hectares (ha) to 435 ha. - change to proposal under s45C approved on 24 December 2021

PDF icon Statement 993.pdf December 24, 2021
Yilgarn Operations - Windarling Range, Mt Jackson Range and Deception Deposit (s. 46)

Attachment 1 to Statement 982 - W1 West pit approval for mining below groundwater table; Inclusion of six hectare Haulage Road Train Parking Area at Windarling; Inclusion of Table 3 - Coordinates defining Haulage Road Train Parking Area at Windarling - s45C change to proposal approved 17 February 2015.

Attachment 2 to Statement 982 - Inclusion of the Windarling W7 Pit Deposit; Inclusion of Table 4 - Coordinates defining Windarling W7 Pit and Supporting Infrastructure - s45C change to proposal approved 27 November 2015.

Attachment 3 to Statement 982 - Inclusion of the Windarling W10 Pit deposit with an additional 24 hectares of disturbance; minor update to Table 4 – Coordinates defining Windarling W7 Pit and Supporting Infrastructure; inclusion of Table 5 - Coordinates defining Windarling W10 Pit and Supporting Infrastructure - s45C change to proposal approved 29 September 2016.

Attachment 4 to Statement 982 - Inclusion of the Altair Pit with an additional 8 hectares of disturbance. Amend the Waste Rock Landform at Deception Deposit - s45C change to proposal approved 26 October 2020.

Attachment 5 to Statement 982 - Altair Pit to be mined below groundwater table - s45C change to proposal approved 22 December 2021.

PDF icon Statement 982.pdf December 22, 2021
Yangibana Rare Earths Project

Attachment 1 to Ministerial Statement 1110 - Changes to the location of accommodation village, access road, process plant and aerodrome. Reduction of development envelope by 1,323 ha. Increase the area of clearing by 80 ha. Changes approved under S45c on 9 November 2021.

PDF icon Statement 1110.pdf November 9, 2021

Pages