Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Brockman Syncline 4 Iron Ore - Revised Proposal |
Attachment 2 - Merging Area 1 and Area 2 into a single development envelope (Area 1) for mine pit and associated infrastructure; amendment to Schedule 2 coordinates defining the approved development envelope (Area 1); and update Figure 1 to reflect the above changes - change to proposal made under s45C approved on 26 August 2016. Attachment 3 - Increase of clearing limit from 3560 ha to 4043 ha (483 hectare increase) - change to proposal made under s45C approved on 8 November 2019. Attachment 4 - Increase clearing extent by 460 ha to total 4503 ha - change to proposal made under s45C approved on 1 September 2022. |
![]() |
September 1, 2022 |
Balla Balla Export Facilities |
Attachment 1 to Statement 945: Change to the marine infrastructure to be constructed within the development envelope, decrease of 1 ha in the development envelope and a decrease in 0.1 ha of disturbance of sub-tidal habitat. Change to proposal approved under S45C on 23 January 2015 |
![]() |
July 1, 2022 |
Northern Goldfields Interconnect Pipeline |
Attachment 1 to Statement 1184 – Increase in the development envelope of 15 ha to provide an area for the Pinnacles Temporary Work Area construction, consisting of construction accommodation, laydown areas and associated infrastructure. Change to proposal approved under s45C 14 June 2022 |
![]() |
June 14, 2022 |
Scarborough Project Nearshore Component |
Attachment 1 to Statement 1172 - Increase the authorised extent of nominal diameter of the trunkline from 32 inch to 36 inch. No amendments to implementation conditions. Changes approved under s45C on 14 June 2022. |
![]() |
June 14, 2022 |
Expansion of Jurien Gypsum Mining Operation ML70/1161 (s. 46) [1820] |
Attachment 1 to Statement 954 - Extend the processing envelope by 1.45 ha. Change to conditions approved under s45C 18 May 2022. |
![]() |
May 18, 2022 |
Malaga to Ellenbrook Rail Works |
Attachment 1 to Statement 1156:
Changes approved under S45c on 18 August 2021. Attachment 2 to Statement 1156 - change to amend Table 1 to change rail over road to rail under road at the Gnangara Road/Drumpellier Road intersection. Changes approved under S45c on 14 March 2022 |
![]() |
March 14, 2022 |
Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel |
Attachment 1 to Ministerial Statement 767 - Remove the northern portion of Lot 2 Calinup Road from the proposal. Amend the development envelope in the southern portion of Lot 2 Calinup Road |
![]() |
January 31, 2022 |
Kwinana Waste to Energy Project |
Attachment 1 to Statement 1016 - amendment to waste types permitted to be processed - inclusion of commercial and industrial waste, which incorporates refuse collection from small businesses (i.e. rateable small businesses) where such a collection is carried out in conjunction with local government residual MSW collection; and amendment to waste types permitted to be processed – inclusion of pre-sorted construction and demolition waste - change to proposal under s45C approved on 31 January 2017. Attachment 2 to Statement 1016 - Amendment to Summary of the Proposal to remove the specific named reference to the grate technology provider; amendment to Summary of the Proposal to update the Lot number for the location of the proposal; addition and definition of the term ‘Proven Grate Combustion Technology’ to Table 3; and Figure 1 and 2 replaced to reflect the updated Lot number - change to proposal under s45C approved on 3 August 2017. Attachment 3 to Statement 1016 - change element description of 'waste recieval volume' to 'waste processing volume'. Increase the waste processing volume allowance from 400,000 tpa to 460,000 tpa. Remove reference to the on-site brick making facility. - change to proposal under s45C approved on 31 January 2022. |
![]() |
January 31, 2022 |
Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland |
Attachment 1 to Statement 781 - Alternative access to remove mangroves - change to proposal approved under s45C on 30 March 2009. Attachment 2 to Statement 781 - Increase the size of the dredge footprint by three hectares to 28 hectares, and increase volume of material to be dredged by 50,000 cubic metres to be 3,950,000 cubic metres - section 45C change to proposal approved on 15 December 2009. Attachment 3 to Statement 781 - Increase the height of DMMA B1 to 30 mAHD - section 45C change to proposal approved on 25 January 2022. |
![]() |
January 25, 2022 |
North Star Magnetite Project |
Attachment 1 to Statement 993 - Change to area of Slurry Corridor Development Envelope; additional clearing for an Aerodrome in the Infrastructure Corridor; addition of Aerodrome to elements in the Infrastructure Development Corridor; and change to area of Infrastructure Corridor Development Envelope - changes to proposal under s45C approved on 22 August 2016. Attachment 2 to Statement 993 - An increase in groundwater abstraction from the Water Corridor Development Envelope from 14 gigalitres per annum (GL/a) up to 20 GL/a, an increase of 6 GL/a, from the current authorised extent. - changes to proposal under s45C approved on 8 March 2019. Attachment 3 to Statement 993 - Changes:
Changes to proposal under s45C approved on 2 December 2019. Attachment 4 to Statement 993 - Changes:
Changes to proposal under s45C approved on 22 September 2020. Attachment 5 to Statement 993 - Increase in the clearing permitted within the Slurry Corridor Development Envelope (SCDE) from no more than 315 hectares (ha) to 435 ha. - change to proposal under s45C approved on 24 December 2021 |
![]() |
December 24, 2021 |