Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Northern Goldfields Interconnect Pipeline |
Attachment 1 to Statement 1184 – Increase in the development envelope of 15 ha to provide an area for the Pinnacles Temporary Work Area construction, consisting of construction accommodation, laydown areas and associated infrastructure. Change to proposal approved under s45C 14 June 2022 |
![]() |
June 14, 2022 |
Expansion of Jurien Gypsum Mining Operation ML70/1161 (s. 46) [1820] |
Attachment 1 to Statement 954 - Extend the processing envelope by 1.45 ha. Change to conditions approved under s45C 18 May 2022. |
![]() |
May 18, 2022 |
Malaga to Ellenbrook Rail Works |
Attachment 1 to Statement 1156:
Changes approved under S45c on 18 August 2021. Attachment 2 to Statement 1156 - change to amend Table 1 to change rail over road to rail under road at the Gnangara Road/Drumpellier Road intersection. Changes approved under S45c on 14 March 2022 |
![]() |
March 14, 2022 |
Wheatstone Development Proposal (S46) [2178] |
Attachment 1 to Statement 1131 - Changes: Amend the Short Description of the proposal and current Authorised Extent (onshore disturbance area) of MS 1131 to include an additional 43.44 hectares associated with the development of the proposed Eastern Port Precinct adjacent to the existing materials offloading facility. CHange to conditions approved under S45c on 2 Februrary 2022. |
![]() ![]() |
February 2, 2022 |
Southern Extension of Sandpit, Lot 2 Calinup Road, Gelorup, Shire of Capel |
Attachment 1 to Ministerial Statement 767 - Remove the northern portion of Lot 2 Calinup Road from the proposal. Amend the development envelope in the southern portion of Lot 2 Calinup Road |
![]() |
January 31, 2022 |
Kwinana Waste to Energy Project |
Attachment 1 to Statement 1016 - amendment to waste types permitted to be processed - inclusion of commercial and industrial waste, which incorporates refuse collection from small businesses (i.e. rateable small businesses) where such a collection is carried out in conjunction with local government residual MSW collection; and amendment to waste types permitted to be processed – inclusion of pre-sorted construction and demolition waste - change to proposal under s45C approved on 31 January 2017. Attachment 2 to Statement 1016 - Amendment to Summary of the Proposal to remove the specific named reference to the grate technology provider; amendment to Summary of the Proposal to update the Lot number for the location of the proposal; addition and definition of the term ‘Proven Grate Combustion Technology’ to Table 3; and Figure 1 and 2 replaced to reflect the updated Lot number - change to proposal under s45C approved on 3 August 2017. Attachment 3 to Statement 1016 - change element description of 'waste recieval volume' to 'waste processing volume'. Increase the waste processing volume allowance from 400,000 tpa to 460,000 tpa. Remove reference to the on-site brick making facility. - change to proposal under s45C approved on 31 January 2022. |
![]() |
January 31, 2022 |
Dredging at Finucane Island, BHP Billiton RGP5 Project, Port Hedland |
Attachment 1 to Statement 781 - Alternative access to remove mangroves - change to proposal approved under s45C on 30 March 2009. Attachment 2 to Statement 781 - Increase the size of the dredge footprint by three hectares to 28 hectares, and increase volume of material to be dredged by 50,000 cubic metres to be 3,950,000 cubic metres - section 45C change to proposal approved on 15 December 2009. Attachment 3 to Statement 781 - Increase the height of DMMA B1 to 30 mAHD - section 45C change to proposal approved on 25 January 2022. |
![]() |
January 25, 2022 |
North Star Magnetite Project |
Attachment 1 to Statement 993 - Change to area of Slurry Corridor Development Envelope; additional clearing for an Aerodrome in the Infrastructure Corridor; addition of Aerodrome to elements in the Infrastructure Development Corridor; and change to area of Infrastructure Corridor Development Envelope - changes to proposal under s45C approved on 22 August 2016. Attachment 2 to Statement 993 - An increase in groundwater abstraction from the Water Corridor Development Envelope from 14 gigalitres per annum (GL/a) up to 20 GL/a, an increase of 6 GL/a, from the current authorised extent. - changes to proposal under s45C approved on 8 March 2019. Attachment 3 to Statement 993 - Changes:
Changes to proposal under s45C approved on 2 December 2019. Attachment 4 to Statement 993 - Changes:
Changes to proposal under s45C approved on 22 September 2020. Attachment 5 to Statement 993 - Increase in the clearing permitted within the Slurry Corridor Development Envelope (SCDE) from no more than 315 hectares (ha) to 435 ha. - change to proposal under s45C approved on 24 December 2021 |
![]() |
December 24, 2021 |
Yilgarn Operations - Windarling Range, Mt Jackson Range and Deception Deposit (s. 46) |
Attachment 1 to Statement 982 - W1 West pit approval for mining below groundwater table; Inclusion of six hectare Haulage Road Train Parking Area at Windarling; Inclusion of Table 3 - Coordinates defining Haulage Road Train Parking Area at Windarling - s45C change to proposal approved 17 February 2015. Attachment 2 to Statement 982 - Inclusion of the Windarling W7 Pit Deposit; Inclusion of Table 4 - Coordinates defining Windarling W7 Pit and Supporting Infrastructure - s45C change to proposal approved 27 November 2015. Attachment 3 to Statement 982 - Inclusion of the Windarling W10 Pit deposit with an additional 24 hectares of disturbance; minor update to Table 4 – Coordinates defining Windarling W7 Pit and Supporting Infrastructure; inclusion of Table 5 - Coordinates defining Windarling W10 Pit and Supporting Infrastructure - s45C change to proposal approved 29 September 2016. Attachment 4 to Statement 982 - Inclusion of the Altair Pit with an additional 8 hectares of disturbance. Amend the Waste Rock Landform at Deception Deposit - s45C change to proposal approved 26 October 2020. Attachment 5 to Statement 982 - Altair Pit to be mined below groundwater table - s45C change to proposal approved 22 December 2021. |
![]() |
December 22, 2021 |
Yangibana Rare Earths Project |
Attachment 1 to Ministerial Statement 1110 - Changes to the location of accommodation village, access road, process plant and aerodrome. Reduction of development envelope by 1,323 ha. Increase the area of clearing by 80 ha. Changes approved under S45c on 9 November 2021. |
![]() |
November 9, 2021 |