S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
Expansion of Monkey Mia Dolphin Resort

Attachment 1 to Statement 709 - Increase the wastewater treatment plant area requiring an additional 2.9 hectares (ha) of vegetation clearing; development and use of temporary borrow pits requiring 3.14 ha of vegetation clearing, that will then be rehabilitated after construction; administrative changes to Schedule 1 of Ministerial Statement 709 to describe the proposal in terms of a ‘development envelope’, simplify the description of the resort expansion, and remove elements relating to the design of the resort that are not relevant to the environment - changes to proposal under s45C approved on 29 June 2017.

PDF icon Ministerial Statement 709 June 29, 2017
Multiple Iron Ore Mine Development, Mining Area C-Northern Flank, 100km Northwest of Newman

Attachment 1 to Statement 491 – Addition of E deposit to Mining Area C Project; to increase production to 42 million tonnes per annum; to increase water usage to up to 12 Megalitres per day; and to increase permanent workforce up to 770 personnel – change to proposal approved under s45C on 13 August 2007.

Attachment 2 to Statement 491 – To increase production to 55 million tonnes per annum; to increase permanent work force up to 950 personnel; and to minor modifications to existing ore handling plants – change to proposal approved under s45C on 8 May 2008.

Attachment 3 to Statement 491 – Installation of a diesel power generation facility; and increase disturbance area for the extension of existing Packsaddle accommodation village and wastewater treatment facilities – change to proposal approved under s45c on 24 April 2009.

Attachment 4 to Statement 491 – Remove 'Ore reserves', 'Project components'; and 'Ore Production'; revise 'Water usage and dewatering requirements' – change to proposal approved under section 45C on 18 October 2013.

Attachment 5 to Statement 491 – Removal of 'Water usage and dewatering requirements' – change to proposal approved under section 45C on 24 March 2014.

Attachment 7 to Statement 491 – Amend the element ‘Accommodation village’ to ‘Packsaddle Village’; include a new element ‘Mulla Mulla Village’; increase total disturbance from 5,385 ha to 5,563.8 ha; update Figures 1 and 2, and delineation coordinates– minor change to conditions approved under section 46C on 22 June 2017.

PDF icon Ministerial Statement 0491 June 22, 2017
Perth Darwin National Highway (Swan Valley Section)

Attachment 2 to Statement 1036 - Changes to the Development Envelope - approved under s45C on 7 June 2017.

PDF icon Ministerial Statement 1036 June 6, 2017
Gold Mine Developments on Lake Lefroy [1809]

Attachment 1 to Statement 879 – Increase of 348 hectares to the area of disturbance – change to proposal approved under section 45C on 26 March 2014.

Attachment 2 to Statement 879 – Increase the boundary of approved Development Envelope; re-align layout of the approved area of disturbance; additional dewatering discharge points; and remove elements of the key characteristics table that are not relevant to the environment or regulated under other legislation - change to proposal approved under section 45C on 30 December 2016.

PDF icon Ministerial Statement 879 December 30, 2016
Busselton Regional Aerodrome (s46) [1876]

Attachment 1 to Statement 901 - Amend the description of the Busselton Regional Aerodrome runway to incorporate land acquired and ceded to the City of Busselton to the north, south and north-west of the existing airport lot by increasing the development envelope as shown in Figure 1 - change to proposal under s45C approved on 15 December 2016.

PDF icon Ministerial Statement 901 December 15, 2016
Carina Iron Ore Mine

Attachment 1 to Statement 852 – Changes to clearing areas and project boundaries associated with the Rail Siding, Haul Road, and new Powerline Corridor – change to proposal approved under section 45C on 28 June 2012.

Attachment 2 to Statement 852 – Expansion of existing Carina Pit, waste dump – change to proposal approved under section 45C on 11 Oct 2013.

Attachment 3 to Statement 852 – Expansion of existing Carina pit, Waste dump – change to proposal approved under section 45C on 13 December 2013.

Attachment 4 to Statement 852 - Disturbance of an additional 21 hectares of native vegetation and an increase of 27.6 hectares to the project boundary envelope - change to proposal approved under section 45C on 20 September 2016.

PDF icon Ministerial Statement 852 September 20, 2016
Forrestfield Airport Link

Attachment 1 to Statement 1022 - Increase in the total combined size of the Bayswater and Forrestfield development envelopes from 65 hectares (ha) to 68.4 ha; and increase in the area of surface disturbance from 46.3 ha to 51.3 ha - s45C change to proposal approved on 23 March 2016.

Attachment 2 to Statement 1022 - Removal of surface disturbance areas in Figure 1 and Figure 2 in Schedule 1; inclusion of exclusion zones in Figure 2 in Schedule 1; and there are no changes to Table 1, Table 2 or Table 3 of Schedule 1 - changes to proposal approved under s45C on 1 September 2016.

PDF icon Ministerial Statement 1022 September 1, 2016
Iron Ore Mine, Downstream Processing Direct-reduced and Hot-briquetted Iron and Port, Cape Preston, WA

Attachment 1 to Statement 635 - Increase in mining rate to approximately 67.4 Mtpa, increase in concentrator rate to approximately 19.6 Mtpa, and increase in the production rate of tailings to approximately 47.8 Mtpa - change to proposal approved under s45C on 8 September 2004.

Attachment 2 to Statement 635 - Changes in project layout and certain increases in infrastructure footprint, including relocation of the accommodation village and construction camps, desalination plant, services corridor route, gas pipeline route, waste dumps, tailings dam, port stockpiles, and expansion of the services corridor and use of a buried slurry pipeline in place of conveyor - change to proposal approved under s45C on 13 February 2009.

Attachment 3 to Statement 635 - Relocation of proposed pellet plant from its original location near the project minesite to the project port on Cape Preston - change to proposal approved under s45C on 18 March 2009.

Attachment 4 to Statement 635 - Increases in the footprint of the mine pit, waste dumps, and tailings storage facility, as defined by attached delineation coordinates, and increases in mining and processing rates - change to proposal approved under s45C on 3 July 2009.

Attachment 5 to Statement 635 - Additional clearing for roads (0.33 ha) and infrastructure associated with the Tailings Storage Facility (TSF) (105 ha) and 3 ha for a pipeline; construction of a pipeline from mine to a proposed discharge location near the mouth of the Fortescue River; and discharge dewatered groundwater from the mine site to a location near the mouth of the Fortescue River - change to proposal approved under s45C on 31 August 2016.

PDF icon Ministerial Statement 0635 August 31, 2016
Hamersley Agriculture Project

Attachment 1 to Statement 883 - Update description of the Hamersley Agriculture Project (HAP); restrict Schedule 1 to “Option A” that is being implemented; remove references to buffer zones and indirect impact areas; amendment to Development Envelope to include a buffer for the current access corridor connecting the Central and Eastern Agricultural areas; removal of elements that are not considered Key Proposal Characteristics or are managed under other legislation; amendment of Table 1 and addition of Tables 2, 3, 4 and 5; and amendment to Figure1, removal of Figure 2 - change to proposal under s45C approved on 18 August 2016.

PDF icon Ministerial Statement 883 August 24, 2016
Magellan Lead Carbonate Project - Inquiry under s. 46 to replace Ministerial Statements 783 and 559

Attachment 1 to Statement 905 – Replacement of Schedule 1 – change to proposal approved under section 45C on 19 December 2013.

Attachment 2 to Statement 905 – Replacement of Schedule 2 – change to proposal approved under section 45C on 19 December 2013.

Attachment 3 to Statement 905 – Increase in disturbance area, Establishment of a ‘Development Envelope’, Ability to locate infrastructure as needed within the Development Envelope, Increase in capacity of Tailings Storage Facility (TSF), Removal of ‘Size of orebody’ and ‘Depth of mine pit’ authorised to “Above groundwater table” – change to proposal approved under section 45C on 9 December 2014.

Attachment 4 to Statement 905 – Amended Benthic Sediment Sampling Table – change to proposal approved under section 45C on 9 December 2014.

Attachment 6 to Statement 905 - Additional clearing for additional pits, Integrated Waste Landform (IWL) and infrastructure; increase in total tailings storage capacity; co-locating tailings within existing waste rock landform to form an IWL; change to Short Description of Proposal to include IWL; removal of reference to two Tailings Storage Facility cells; update to sampling sites and associated lead baseline trigger levels; correction of coordinate errors in Table 4 (Now titled Table 8); change to lead baseline trigger level table numbers to maintain numbering sequence; update of Figures 1 to 17 to include amended sample site locations; update to Figure 18 to include new authorised disturbance footprint - change to proposal approved under section 45C on 19 August 2016.

PDF icon Ministerial Statement 905 August 19, 2016