Attachment 1 to Statement 724 – Modification of the location footprint and clarification of "Maximum Facility Footprint", "Maximum Total Area", "Infrastructure", and "Construction Laydown Envelope" - s45C change to proposal approved on 9 October 2006.
Attachment 2 to Statement 724 – Increase in power generating capacity from 200 megawatts to 208 megawatts, increase in the size of the laydown area, changes to the air emissions profile, relocation of the wastewater treatment plant, and re-alignment of the coal conveyor - s45C change to proposal approved on 18 September 2007.
Attachment 3 to Statement 724 – Increase ancillary infrastructure area - s45C change to proposal approved on 12 August 2008.
Attachment 4 to Statement 724 – Addition of a second ash disposal site - s45C change to proposal approved on 7 November 2008.
Attachment 5 to Statement 724 – Increase greenhouse gas emissions to 1,562,000 tonnes per annum of carbon dioxide equivalent - s45C change to proposal approved on 2 September 2009.
Attachment 6 to Statement 724 – Increase power generating capacity from 208 megawatts to 212 megawatts - change to proposal approved under s45C on 23 March 2010.
Attachment 7 to Statement 724 – Removal of maximum sulphur oxides in emissions and plant thermal efficiency – change to proposal approved under section 45C on 7 January 2013.
Attachment 9 to Statement 724 – Adjustment of annual pollutant loads emitted to air - change to proposal approved under S45c on 4 April 2018.
Attachment 8 – Condition 1 Metal Emissions Monitoring – interim implementation conditions approved under section 46A on 21 December 2015.