| Title | S45C changes to proposal | Ministerial Statement | Last updated |
|---|---|---|---|
| West Angelas Iron Ore Project |
Attachment to Statement 514 - Increase mining rate from 25 million tonnes per annum to approximately 30 million tonnes per annum - change to proposal approved on 11 April 2006. Attachment 1 to Statement 514 - Additional rail siding, Spoonbill - change to proposal approved on 29 November 2006. Attachment 2 to Statement 514 - Change to the rail alignment along Hamersley Flats - change to proposal approved on 13 February 2009. Attachment 3 to Statement 514 - increase throughput to 40 million tonnes per annum, update of mine figure (Figure 10) and amendments to Key Characteristics Table - s45C change to proposal approved on 20 August 2009. Attachment 4 to Statement 514 – Deepening of existing pits and addition of Pit E – change to proposal approved under section 45C on 30 January 2012. Attachment 5 to Statement 514 – Amendment to proposal description and deletion of the key characteristics from Schedule 1 which are not relevant to the environment or managed by another process – change to proposal approved under section 45C on 16 January 2014. |
|
January 16, 2014 |
| Western Turner Syncline - Section 10 Iron Ore Mine |
Attachment 1 to Statement 807 – Removal of Water Supply and Production Limits – change to proposal approved under section 45C on 10 December 2013. |
|
December 10, 2013 |
| Koolyanobbing Iron Ore Expansion |
Attachment 1 to Statement 627 – In schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 5 May 2005. Attachment 2 to Statement 627 – Increase in area of native vegetation clearing at the Windarling W3/5 pit area by 52.9 hectares to develop a new waste dump (47.9 hectares with maximum height of 540m AHD) and extend the area for stock piling (5 hectares) – change to proposal approved under s45C on 11 March 2008. Attachment 4 to Statement 627 – An increase in ore production of 10/% – change to proposal approved under s45C on 7 October 2008. Attachment 5 to Statement 627 – Increase ore production at the ore handling plant at Koolyanobbing from 8.8 million tonnes per annum up to 11.5 million tonnes per annum – change to proposal approved under s45C on 20 August 2010. Attachment 6 to Statement 627 – Change to Schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 13 December 2011. Attachment 7 to Statement 627 – Reduction of project impacts to Declared Rare Flora – change to proposal approved under section 45C on 25 September 2012. Attachment 8 to Statement 627 – Increase in disturbance footprint of 45 ha at Windarling to allow for stockpiling of topsoil, subsoil and vegetation materials to be used in future rehabilitation – change to proposal approved under section 45C on 12 October 2012. Attachment 9 to Statement 627 – Mining of Windarling Range W1 deposit below the groundwater table – change to proposal approved under section 45C on 20 November 2012. Attachment 10 to Statement 627 – Increase to Windarling W4 West waste rock dump area and ore stockpile area – change to proposal approved under section 45C on 20 November 2013. |
|
November 20, 2013 |
| Yilgarn Operations - Windarling Range W4 East Deposit |
Attachment 1 – Extension to the area of the W4 East Deposit Haul Road and revision of proposal description – change to proposal approved under section 45C on 20 November 2013. |
|
November 20, 2013 |
| South West Creek Dredging and Reclamation Proposal |
Attachment 1 to Statement 859 – Relocation of DMMA G Discharge Point and Modification of Zone of Permanent Mangrove loss - change to proposal approved under s45C on 27 October 2011. Attachment 2 to Statement 859 – Realignment of the access track between Utah Point Road and the dredging area, and associated changes to the zone of permanent mangrove loss – change to proposal approved under s45C on 2 May 2012. |
|
November 8, 2013 |
| Hope Downs Iron Ore Mine |
First Attachment to Statement 584 - Production rate increase 25 mega tonnes per annum to 30 mega tonnes per annum - change to proposal approved under s45C on 3 Oct 2005. Second Attachment to Statement 584 - Change to mine infrastructure and disturbance areas - change to proposal approved under s45C on 19 Sep 2006. Third Attachment to Statement 584 - Increase in the area of rail corridor disturbance - change to proposal approved under s45C on 31 Oct 2006. Attachment 1 to Statement 584 - Increase in project clearance disturbance area from 1,600 hectares to 1,850 hectares, and updating of Key Characteristics Table - change to proposal approved under s45C on 14 Jul 2009. Attachment 2 to Statement 584 – Increase to approved disturbance area and redefinition of Project Area – change to proposal approved under s45C on 6 Sept 2010. Attachment 3 to Statement 584– Remove Weeli Wolli Spring supplementation limit in Schedule 1 – change to proposal approved under s45C on 20 Apr 2012. Attachment 4 to Statement 584 – Removal of ore mining rate and expansion of disturbance footprint – change to proposal approved under s45C on 28 Aug 2012. Attachment 5 to Statement 584 – Annualise Mine Pit Dewatering Rate – change to proposal approved under section 45C on 7 November 2013. |
|
November 7, 2013 |
| Yilgarn Operations Deception Deposit |
Attachment 1 to Statement 900 – Realignment of the Deception Deposit Haul Road and the siting of the Deception Deposit Waste Rock Landform – change to proposal approved under section 45C on 19 November 2012. Attachment 2 to Statement 900 – Realignment of Haul Road, co-location of support infrastructure to Ore Stockpile areas – change to proposal approved under section 45C on 5 November 2013. |
|
November 5, 2013 |
| Goldsworthy Iron Ore Mines Extension Project |
Attachment to Statement 682 – Change to description of proposal by removing Y4A from the main activity and increasing area disturbed from 97 to 145 hectares (ha) – change to proposal approved under section 45C on 8 June 2006. Attachment 2 to Statement 682 – Revised proposal description and removal of Location, Duration and Employment from the key proposal characteristics; increase the area of disturbance from approximately 145 to 270 ha, and formalise new Maximum Disturbance Boundaries (Development Envelope) of approximately of 455 ha for the site – change to proposal approved under section 45C on 9 October 2013. |
|
October 9, 2013 |
| Port Geographe - Stage 1 (s46) |
Attachment to Statement 391 - Modifications to beach alignments at Wonnerup Beach - s45C change to proposal approved on 19 September 2006. Attachment 2 to Statement 391 - To harvest wrack for a two-year trial period between Guerin Street groyne and the western breakwater of the Port Geographe development - s45C change to proposal approved on 15 May 2009. Attachment 3 to Statement 391 – To define the spatial components of the Port Geographe Development, identifying the Land Development Component and the Coastal Structures Component – change to proposal approved under section 45C on 5 February 2013. Attachment 4 to Statement 391 – Delete Figure 1 and replace with a revised Figure 1 (March 2013). Provide a conceptual layout of coastal structures (Figure 2). Provide the key characteristics of the proposal (Table 1) – change to proposal approved under section 45C on 12 April 2013. Attachment 5 to Statement 391 – To amend the channel dimensions and excavation work in the Key Characteristics Table change to proposal approved under section 45C on 13 September 2013. |
|
September 13, 2013 |
| Brockman 2 Detrital Iron Ore Mine Extension Phase 2B |
Attachment 1 to Statement 867– Removal of reference to "Project life", "Total Production", and "Dewatering volume"– change to proposal approved under section 45C on 11 September 2013. |
|