S45C changes to proposal

Title S45C changes to proposal Ministerial Statement Last updated
West Angelas Iron Ore Project

Attachment to Statement 514 - Increase mining rate from 25 million tonnes per annum to approximately 30 million tonnes per annum - change to proposal approved on 11 April 2006.

Attachment 1 to Statement 514 - Additional rail siding, Spoonbill - change to proposal approved on 29 November 2006.

Attachment 2 to Statement 514 - Change to the rail alignment along Hamersley Flats - change to proposal approved on 13 February 2009.

Attachment 3 to Statement 514 - increase throughput to 40 million tonnes per annum, update of mine figure (Figure 10) and amendments to Key Characteristics Table - s45C change to proposal approved on 20 August 2009.

Attachment 4 to Statement 514 – Deepening of existing pits and addition of Pit E – change to proposal approved under section 45C on 30 January 2012.

Attachment 5 to Statement 514 – Amendment to proposal description and deletion of the key characteristics from Schedule 1 which are not relevant to the environment or managed by another process – change to proposal approved under section 45C on 16 January 2014.

PDF icon Ministerial Statement 514 January 16, 2014
Western Turner Syncline - Section 10 Iron Ore Mine

Attachment 1 to Statement 807 – Removal of Water Supply and Production Limits – change to proposal approved under section 45C on 10 December 2013.

PDF icon Ministerial Statement 807 December 10, 2013
Koolyanobbing Iron Ore Expansion

Attachment 1 to Statement 627 – In schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 5 May 2005.

Attachment 2 to Statement 627 – Increase in area of native vegetation clearing at the Windarling W3/5 pit area by 52.9 hectares to develop a new waste dump (47.9 hectares with maximum height of 540m AHD) and extend the area for stock piling (5 hectares) – change to proposal approved under s45C on 11 March 2008.

Attachment 4 to Statement 627 – An increase in ore production of 10/% – change to proposal approved under s45C on 7 October 2008.

Attachment 5 to Statement 627 – Increase ore production at the ore handling plant at Koolyanobbing from 8.8 million tonnes per annum up to 11.5 million tonnes per annum – change to proposal approved under s45C on 20 August 2010.

Attachment 6 to Statement 627 – Change to Schedule 1, Key Proposal Characteristics Table – change to proposal approved under s45C on 13 December 2011.

Attachment 7 to Statement 627 – Reduction of project impacts to Declared Rare Flora – change to proposal approved under section 45C on 25 September 2012.

Attachment 8 to Statement 627 – Increase in disturbance footprint of 45 ha at Windarling to allow for stockpiling of topsoil, subsoil and vegetation materials to be used in future rehabilitation – change to proposal approved under section 45C on 12 October 2012.

Attachment 9 to Statement 627 – Mining of Windarling Range W1 deposit below the groundwater table – change to proposal approved under section 45C on 20 November 2012.

Attachment 10 to Statement 627 – Increase to Windarling W4 West waste rock dump area and ore stockpile area – change to proposal approved under section 45C on 20 November 2013.

PDF icon Ministerial Statement 627 November 20, 2013
Yilgarn Operations - Windarling Range W4 East Deposit

Attachment 1 – Extension to the area of the W4 East Deposit Haul Road and revision of proposal description – change to proposal approved under section 45C on 20 November 2013.

PDF icon Ministerial Statement 909 - Yilgarn Operations - Windarling Range W4 East Deposit November 20, 2013
South West Creek Dredging and Reclamation Proposal

Attachment 1 to Statement 859 – Relocation of DMMA G Discharge Point and Modification of Zone of Permanent Mangrove loss - change to proposal approved under s45C on 27 October 2011.

Attachment 2 to Statement 859 – Realignment of the access track between Utah Point Road and the dredging area, and associated changes to the zone of permanent mangrove loss – change to proposal approved under s45C on 2 May 2012.

PDF icon Ministerial Statement 859 November 8, 2013
Hope Downs Iron Ore Mine

First Attachment to Statement 584 - Production rate increase 25 mega tonnes per annum to 30 mega tonnes per annum - change to proposal approved under s45C on 3 Oct 2005.

Second Attachment to Statement 584 - Change to mine infrastructure and disturbance areas - change to proposal approved under s45C on 19 Sep 2006.

Third Attachment to Statement 584 - Increase in the area of rail corridor disturbance - change to proposal approved under s45C on 31 Oct 2006.

Attachment 1 to Statement 584 - Increase in project clearance disturbance area from 1,600 hectares to 1,850 hectares, and updating of Key Characteristics Table - change to proposal approved under s45C on 14 Jul 2009.

Attachment 2 to Statement 584 – Increase to approved disturbance area and redefinition of Project Area – change to proposal approved under s45C on 6 Sept 2010.

Attachment 3 to Statement 584– Remove Weeli Wolli Spring supplementation limit in Schedule 1 – change to proposal approved under s45C on 20 Apr 2012.

Attachment 4 to Statement 584 – Removal of ore mining rate and expansion of disturbance footprint – change to proposal approved under s45C on 28 Aug 2012.

Attachment 5 to Statement 584 – Annualise Mine Pit Dewatering Rate – change to proposal approved under section 45C on 7 November 2013.

PDF icon Ministerial Statement 584 November 7, 2013
Yilgarn Operations Deception Deposit

Attachment 1 to Statement 900 – Realignment of the Deception Deposit Haul Road and the siting of the Deception Deposit Waste Rock Landform – change to proposal approved under section 45C on 19 November 2012.

Attachment 2 to Statement 900 – Realignment of Haul Road, co-location of support infrastructure to Ore Stockpile areas – change to proposal approved under section 45C on 5 November 2013.

PDF icon Ministerial Statement 900 November 5, 2013
Goldsworthy Iron Ore Mines Extension Project

Attachment to Statement 682 – Change to description of proposal by removing Y4A from the main activity and increasing area disturbed from 97 to 145 hectares (ha) – change to proposal approved under section 45C on 8 June 2006.

Attachment 2 to Statement 682 – Revised proposal description and removal of Location, Duration and Employment from the key proposal characteristics; increase the area of disturbance from approximately 145 to 270 ha, and formalise new Maximum Disturbance Boundaries (Development Envelope) of approximately of 455 ha for the site – change to proposal approved under section 45C on 9 October 2013.

PDF icon Ministerial Statement 682 October 9, 2013
Port Geographe - Stage 1 (s46)

Attachment to Statement 391 - Modifications to beach alignments at Wonnerup Beach - s45C change to proposal approved on 19 September 2006.

Attachment 2 to Statement 391 - To harvest wrack for a two-year trial period between Guerin Street groyne and the western breakwater of the Port Geographe development - s45C change to proposal approved on 15 May 2009.

Attachment 3 to Statement 391 – To define the spatial components of the Port Geographe Development, identifying the Land Development Component and the Coastal Structures Component – change to proposal approved under section 45C on 5 February 2013.

Attachment 4 to Statement 391 – Delete Figure 1 and replace with a revised Figure 1 (March 2013). Provide a conceptual layout of coastal structures (Figure 2). Provide the key characteristics of the proposal (Table 1) – change to proposal approved under section 45C on 12 April 2013.

Attachment 5 to Statement 391 – To amend the channel dimensions and excavation work in the Key Characteristics Table change to proposal approved under section 45C on 13 September 2013.

PDF icon Ministerial Statement 391 September 13, 2013
Brockman 2 Detrital Iron Ore Mine Extension Phase 2B

Attachment 1 to Statement 867– Removal of reference to "Project life", "Total Production", and "Dewatering volume"– change to proposal approved under section 45C on 11 September 2013.

PDF icon Statement 867 - Brockman 2 Detrital Iron Ore Mine Extension Phase 2B September 11, 2013