Title S45C changes to proposal Ministerial Statement Last updated
Construction of warehouse and transport depot on Lot 46 Tomah Road, Welshpool

Attachment 1 to Statement 766 - To include Lots 47 and 56 and to limit the proposal definition to clearing and earthworks – change to proposal approved under section 45C on 3 October 2010.

PDF icon Ministerial Statement 766 October 3, 2010
Revised Proposal - Increase in Iron Ore Export through the Port of Esperance to 8 million tonnes per annum

Attachment 1 to Statement 681 - change to description of proposal in Schedule 1, Key Characteristics Table - change to proposal approved on 18 November 2008.

Attachment 2 to Statement 681 - Increasing iron ore exports through the Port of Esperance from 8.8 million tonnes per annum to 11.5 million tonnes per annum - change to proposal approved on 6 September 2010.

PDF icon Ministerial Statement 0681 September 6, 2010
Red October Gold Project, 80km south of Laverton

Non-substantial Change to Statement 518 - Change of haulage destination of low grade ore from the Red October Project, from Laverton to Leonora, approved in October 1999.

Attachment 1 to Statement 518 - Change of haulage destination of low grade ore from the Red October Project, from Leonora to the Carosue Dam Processing Plant - change to proposal under s45C approved on 15 December 2009.

PDF icon Ministerial Statement 518 December 15, 2009
Chichester Rail Deviation

Attachment 1 to Statement 818 - Increased groundwater requirements and revised culvert numbers and
locations. Change to conditions approved under s. 45C on 13 April 2010

PDF icon Statement 818.pdf December 4, 2009
Oakajee deepwater port, Oakajee, Shire of Chapman Valley

Attachment 2 to Statement 469 - Confirmed port location as the northern option, with an offshore design capable of berthing two Cape Class (180,000 DWT fully laden) vessels plus one further Cape Class (180,000 DWT fully laden) vessel or one Panamax Class (70,000 DWT fully laden) vessel - s45C change to proposal approved on 1 December 2009.

PDF icon Ministerial Statement 469 December 1, 2009
Long-term shellsand dredging, Owen Anchorage

Attachment 1 to Statement 599 - clarification of operational toleraces of approved dredging - change to proposal approved under s45C on 11 March 2009.

Attachment 2 to Statement 599 - definition of Stage 2 (West Success Bank) dredging area - change to proposal approved under s45C on 19 November 2009.

PDF icon Ministerial Statement 599 November 19, 2009
Clay Excavation Lots 7, 20, 60, 63, and 64 previously part lot 1 and lots 222, 27, 26, 25, 28 and 7 Hallett and Copley Roads, Upper Swan (s46)

Attachment 1 to Statement 699 - Inclusion of an additional lot (Lot 18 St Alban's Road, Upper Swan) into the Upper Swan clay extraction area - s45C change to proposal approved on 2 November 2009.

PDF icon Ministerial Statement 0699 November 2, 2009
Roe Highway Stage 7 Extension (South Street, Canning Vale to Kwinana Freeway, Leeming)

Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation - change to proposal under s45C approved on 22 September 2005.

Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation. Change to offset package - change to proposal under s45C approved on 11 October 2009.

PDF icon Ministerial Statement 663 October 11, 2009
Brockman Syncline 4 Iron Ore Project

Attachment 1 to Statement 717 – Redesign of approved mine site layout – plant, administration office, workshops, stacker reclaimer stockpiles, village, camp, waste dumps and stockpiles. Redesign of the rail spur. An increase in throughput from 20 to 22 megatonnes per year. An increase in water usage. The bitumen sealing of White Quartz Road. Removal of the conveyor and airstrip – change to proposal approved under section 45C on 19 September 2007.

Attachment 2 to Statement 717 – To change the route of the power line at its southern end to diverge from the rail infrastructure corridor and follow the Boolgeeda Valley and to change the power line capacity to 25 MW, operating at 33kV – change to proposal approved on 22 September 2008.

Attachment 3 to Statement 717– An increase in throughput from 22 to 42 megatonnes per year. Increase in waste dump height and additional locations. Plant, crusher, stockpiles, camp and village. An increase in water usage. Mine access road. Product transport route – change to proposal approved on 17 December 2008.

PDF icon Ministerial Statement 717 December 17, 2008
Yellowfin Tuna Aquaculture Trial, Zeewijk Channel, Abrolhos Islands

Attachment 1 to Statement 649 - change to time limit of approval from 24 May 2007 until 24 May 2010 - approved 3 July 2007.

Attachment 1 to Statement 649 - changes as follows: change in species to be cultured; period of operation; number of pens; biomass capacity of pens; source of stock; feed sources; and predator control - approved 25 February 2008.

PDF icon Ministerial Statement 649 February 25, 2008