Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Roe Highway Stage 7 Extension (South Street, Canning Vale to Kwinana Freeway, Leeming) |
Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation - change to proposal under s45C approved on 22 September 2005. Attachment to Statement 663 - Change to broad-scale map (Figure 1) in Schedule 1, and more detailed descriptions in subsequent documentation. Change to offset package - change to proposal under s45C approved on 11 October 2009. |
![]() |
October 11, 2009 |
Brockman Syncline 4 Iron Ore Project |
Attachment 1 to Statement 717 – Redesign of approved mine site layout – plant, administration office, workshops, stacker reclaimer stockpiles, village, camp, waste dumps and stockpiles. Redesign of the rail spur. An increase in throughput from 20 to 22 megatonnes per year. An increase in water usage. The bitumen sealing of White Quartz Road. Removal of the conveyor and airstrip – change to proposal approved under section 45C on 19 September 2007. Attachment 2 to Statement 717 – To change the route of the power line at its southern end to diverge from the rail infrastructure corridor and follow the Boolgeeda Valley and to change the power line capacity to 25 MW, operating at 33kV – change to proposal approved on 22 September 2008. Attachment 3 to Statement 717– An increase in throughput from 22 to 42 megatonnes per year. Increase in waste dump height and additional locations. Plant, crusher, stockpiles, camp and village. An increase in water usage. Mine access road. Product transport route – change to proposal approved on 17 December 2008. |
![]() |
December 17, 2008 |
Yellowfin Tuna Aquaculture Trial, Zeewijk Channel, Abrolhos Islands |
Attachment 1 to Statement 649 - change to time limit of approval from 24 May 2007 until 24 May 2010 - approved 3 July 2007. Attachment 1 to Statement 649 - changes as follows: change in species to be cultured; period of operation; number of pens; biomass capacity of pens; source of stock; feed sources; and predator control - approved 25 February 2008. |
![]() |
February 25, 2008 |
Proposed Mesa J iron ore development - Pannawonica |
Attachment to Statement 208 – Pit extension and Improved Boundary Definition – change to proposal approved under section 45C on 20 December 2005. Attachment to Statement 208 – New rail siding at Green Pool – change to proposal approved under section 45C on 13 November 2006. Attachment 1 to Statement 208 – Installation of Fibre Optic Cable for railway communications system – change to proposal approved under section 45C on 6 March 2007. Attachment 2 to Statement 208 – Installation of Fibre Optic Cable for railway communications system from the Cape Lambert administration offices to the 5 kilometre peg and from the 71 kilometre peg to the Mesa J mine operations at Pannawonica (known as “the Deepdale Fibre Optic Cable”) – change to proposal approved under section 45C on 30 October 2007. |
![]() |
October 30, 2007 |
Perth – Bunbury Highway (Peel Deviation) |
Attachment to Statement 597 - Change to Schedule 1, key characteristics table - change to proposal under s45C approved on 28 July 2005. Attachment 2 to Statement 597 - A minor realignment of the Perth-Bunbury Highway at Lakes Road. Figure 4 New alignmment of Perth-Bunbury Highway at Lakes Road - change to proposal under s45C approved on 24 September 2007. |
![]() |
September 24, 2007 |
Dredging Program - Dampier Port Upgrade |
Attachment 1 to Statement 731 - Increased extent of dredging - change to description of proposal approved on 18 January 2007. Attachment 2 to Statement 731 - Marine drill and blast to remove rock outcrops from within approved dredging area - change to description of proposal approved on 2 July 2007. |
![]() |
July 2, 2007 |
Wastewater Treatment and Disposal, Albany (s46) [1508] |
Attachment 1 to Statement 675 - Additional storage dam for treated wastewater at the Gunn Road site and associated wastewater supply pipework (Figure 1) - change to proposal under s45C approved on 22 April 2007. |
![]() |
April 22, 2007 |
Wheelarra Hill Iron Ore Mine Extension |
Attachment to Statement 683 - Increase in area of disturbance from 1,960 ha to 2,022 ha - change to proposal approved under s45C on 17 November 2006. |
![]() |
November 17, 2006 |
Mineral Sands Mine, Gingin |
Attachment to Statement 666 - Increase in disturbance area from 280 hectares to 370 hectares - change to proposal under s45C approved on 31 October 2006. |
![]() |
October 31, 2006 |
Coral Bay Boating Facility |
Attachment 1 to Statement 652 - Changes to the key proposal characteristics in Schedule 1, Table 1 - change to proposal under s45C approved on 22 December 2005. Attachment 2 to Statement 652 - Changes to the key proposal characteristics in Schedule 1, Table 1 (changes from the s45C approved in December 2005) - change to proposal under s45C approved on 6 October 2006. |
![]() |
October 6, 2006 |