Oakajee deepwater port, Oakajee, Shire of Chapman Valley
Project
Proposal description
The proposal is to construct a deepwater port to service fully loaded Panamax sized vessels (65 000 DWT) at Oakajee, approximately 23 kilometres north of Geraldton.
Three site locations (north, south and central) and two different design options (inshore and off-shore) were considered in developing the proposal. The design option favoured by the proponent is an in-shore port design at the northern sector.
The port study area is approximately 23 kilometres north of Geraldton. The port will service the Oakajee industrial estate to be established adjacent to the port area.
Referred under EP Act
s38
Last updated
December 01, 2009
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
Preliminary Environmental Factors
Date published
Friday, 27 December, 1996
3. Assessment
Scoping
Approved
Thursday, 27 February, 1997
Environmental Review
Environmental Review documentation
4. EPA Report on assessment
Date published
Friday, 19 September, 1997
Appeals close
Friday, 3 October, 1997
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Wednesday, 25 February, 1998
Post-assessment changes
s. 45C amendments
Attachment 2 to Statement 469 - Confirmed port location as the northern option, with an offshore design capable of berthing two Cape Class (180,000 DWT fully laden) vessels plus one further Cape Class (180,000 DWT fully laden) vessel or one Panamax Class (70,000 DWT fully laden) vessel - s45C change to proposal approved on 1 December 2009.
Date of approval s. 45C
Tuesday, 1 December, 2009
Attachment 1 to Statement 469 - Consolidated list of commitments as per Ministerial Statement 469, approved on 25 February 1998.