| Title | S45C changes to proposal | Ministerial Statement | Last updated |
|---|---|---|---|
| Proposed Mesa J iron ore development - Pannawonica |
Attachment to Statement 208 – Pit extension and Improved Boundary Definition – change to proposal approved under section 45C on 20 December 2005. Attachment to Statement 208 – New rail siding at Green Pool – change to proposal approved under section 45C on 13 November 2006. Attachment 1 to Statement 208 – Installation of Fibre Optic Cable for railway communications system – change to proposal approved under section 45C on 6 March 2007. Attachment 2 to Statement 208 – Installation of Fibre Optic Cable for railway communications system from the Cape Lambert administration offices to the 5 kilometre peg and from the 71 kilometre peg to the Mesa J mine operations at Pannawonica (known as “the Deepdale Fibre Optic Cable”) – change to proposal approved under section 45C on 30 October 2007. |
|
October 30, 2007 |
| Perth – Bunbury Highway (Peel Deviation) |
Attachment to Statement 597 - Change to Schedule 1, key characteristics table - change to proposal under s45C approved on 28 July 2005. Attachment 2 to Statement 597 - A minor realignment of the Perth-Bunbury Highway at Lakes Road. Figure 4 New alignmment of Perth-Bunbury Highway at Lakes Road - change to proposal under s45C approved on 24 September 2007. |
|
September 24, 2007 |
| Dredging Program - Dampier Port Upgrade |
Attachment 1 to Statement 731 - Increased extent of dredging - change to description of proposal approved on 18 January 2007. Attachment 2 to Statement 731 - Marine drill and blast to remove rock outcrops from within approved dredging area - change to description of proposal approved on 2 July 2007. |
|
July 2, 2007 |
| Wastewater Treatment and Disposal, Albany (s46) [1508] |
Attachment 1 to Statement 675 - Additional storage dam for treated wastewater at the Gunn Road site and associated wastewater supply pipework (Figure 1) - change to proposal under s45C approved on 22 April 2007. |
|
April 22, 2007 |
| Wheelarra Hill Iron Ore Mine Extension |
Attachment to Statement 683 - Increase in area of disturbance from 1,960 ha to 2,022 ha - change to proposal approved under s45C on 17 November 2006. |
|
November 17, 2006 |
| Coral Bay Boating Facility |
Attachment 1 to Statement 652 - Changes to the key proposal characteristics in Schedule 1, Table 1 - change to proposal under s45C approved on 22 December 2005. Attachment 2 to Statement 652 - Changes to the key proposal characteristics in Schedule 1, Table 1 (changes from the s45C approved in December 2005) - change to proposal under s45C approved on 6 October 2006. |
|
October 6, 2006 |
| Northern Looping Project, Loops 1 to 9 Karratha to Bullsbrook |
Attachment - Change to Schedule 1 - description of proposal - change to proposal approved under s45C on 29 June 2006. |
|
June 29, 2006 |
| East Clontarf Residential Development |
Attachment to Statement 692 - Changes to Schedule 1, description of the proposal - changes to proposal under s45C approved on 25 May 2006. |
|
May 25, 2006 |
| Silicon Project, Kemerton (s46) [737] |
Attachment to Statements 27 and 279 - change to description of proposal to add the third of four furnaces - approved on 17 May 2006. |
|
May 17, 2006 |
| Proposed silicon project at Kemerton |
Attachment to Statement 27 and 279 - Addition of the third of four furnaces - change to description of proposal approved on 17 May 2006. |
|
May 17, 2006 |