Wastewater Treatment and Disposal, Albany (s46) [1508]

Project
Proponent
Proposal description

The proposal is to raise the application rate for total nitrogen from 106 to 150 kg/ha/y to the area of irrigated trees on the tree farm. Inquiry under s46 into changes to Ministerial Statement 287.

The original proposal, assessed in 1992, calculated nitrogen loadings in the wastewater applied to the grass bays and the irrigated trees at the wastewater disposal site. The projected loadings were based on the wastewater treatment plant being upgraded to reduce nitrogen concentrations in the wastewater in 2000, when volume flows were projected to increase. The upgrade of the wastewater treatment plant has not occurred, resulting in higher concentrations of nitrogen in the wastewater than originally allowed for and larger tonnages per year of nitrogen going to the wastewater disposal site.

Assessment Number
1508
Region
Referred under EP Act
s46
Industry sector
Last updated
Current Status
Ministerial Statement published
2. Decision on whether to assess this proposal
4. EPA Report on assessment
EPA Report Number
1126
Key Environmental Factors
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval
Post-assessment changes
s. 45C amendments

Attachment 1 to Statement 675 - Additional storage dam for treated wastewater at the Gunn Road site and associated wastewater supply pipework (Figure 1) - change to proposal under s45C approved on 22 April 2007.

Date of approval s. 45C