Cundaline and Callawa Mining Operations

Attachment 1 to Statement 814 - Increase in maximum disturbance and land disturbance boundaries. Change to conditions approved under s. 45C on 11 February 2013.

PDF icon Statement No. 814.pdf February 11, 2013
Newman Satellite Development - Orebody 23

Attachment 1 to Statement 478 - Extension to the life and maximum disturbance boundary of the Orebody 23 Mine - section 45C change to proposal approved on 29 September 2010.

Attachment 2 to Statement 478 – Life of project and ore mining rate – change to proposal approved under section 45C on 4 December 2012.

PDF icon Ministerial Statement 478 December 4, 2012
Relocation of Herne Hill quarry operation

Attachment 1 to Statement 199- Change to the area of the west pit development - s45C change to proposal approved 25 January 2006.

Attachment 2 to Statement 199 - Change to the west pit - s45C change to proposal approved 22 September 2006.

Attachment 3 to Statement 199 - Clearing of 1 ha of vegetation for the purpose of extending the stockpile and conyeyor areas - s45C change to proposal approved 19 November 2012.

PDF icon Ministerial Statement 199 November 19, 2012
Pardoo Direct Shipping Ore Project Port Hedland

Attachment 1 to Statement 775 - Multiple project design and operational changes to the mine site - section 45C change to proposal approved on 25 August 2009.

Attachment 2 to Statement 775 - Increase the mining rate from 1.5 to 3 million tonnes per annum, involving the addition of two new open pits and associated infrastructure, and changes to an existing open pit – change to proposal approved under s45C on 6 July 2010.

Attachment 3 to Statement 775 – Increase the volume of annual dewatering and environmental discharge from 2 GL per annum to 4.0 GL per annum – change to proposal approved under section 45C on 24 May 2012.

Attachment 4 to Statement 775 - Increase the volume of annual dewatering and environmental discharge from 4 GL to 10 GL per annum, and increase in total disturbance footprint from 490.4 ha to 501.7 ha – change to proposal approved under section 45C on 24 July 2012.

PDF icon Ministerial Statement 775 July 24, 2012
Cape Lambert to Emu Siding Rail Duplication

Attachment 1 – Realignment of the originally proposed rail duplication – change to proposal approved under section 45C on 19 June 2012.

PDF icon Ministerial Statement 880 June 19, 2012
Telfer Project, Power Supply and Infrastructure Corridor, Port Hedland to Telfer Gold Mine, Great Sandy Desert

Attachment 1 to Ministerial Statement 605 - alteration to pipeline route from Port Hedland to Telfer - change to proposal approved under s45C on 19 August 2004.

Attachment 2 to Ministerial Statement 605 - Consolidation and Amendment of Key Characteristics Table, Option 1a. Supplying natural gas from Port Hedland via a buried pipeline to the Telfer Gold Mine for on-site electricity generation at a new open cycle gas fired power plant - change to proposal approved under s45C on 2 May 2012.

PDF icon Ministerial Statement 605 May 2, 2012
Cape Lambert Port upgrade - increase in throughput to 85 Mtpa

Attachment 1 – Linkage Proposal – Increase in throughput from 85 Mtpa to 105 Mtpa and additional infrastructure. Inclusion of Figure 3 – Indicative Layout of the Linkage – change to proposal approved under s45C on 4 April 2012.

PDF icon Ministerial Statement 741 April 4, 2012
Proposed Brockman No. 2 detrital iron ore mine

Attachment to Statement 131 - Section 45C change to proposal approved on 1 September 2005.

Attachment to Statement 131 - Section 45C change to proposal approved on 6 September 2005.

Attachment to Statement 131 - Section 45C change to proposal approved on 6 June 2006.

Attachment 4 to Statement 131 - Section 45C change to proposal approved on 27 November 2007.

Attachment 5 to Statement 131 - Section 45C change to proposal approved on 25 August 2009.

Attachment 6 to Statement 131 – Further development of parts of the existing Pit 5, 6 and 7 above the watertable; increase in surface disturbance areas for topsoil stockpiling and a new surface waste dump adjacent to the mine pits. This change is referred to as the Sustaining Tonnes Project – change to proposal approved under s45C on 28 March 2012.

PDF icon Ministerial Statement 131 March 28, 2012
Pilbara Iron Ore and Infrastructure Project: East-West Railway and Mine Sites (Stage B)

Attachment 1 to Statement 707 - Increase to Christmas Creek clearance area (by 12.5ha) - section 45C change to proposal approved on 21 October 2006.

Attachment 2 to Statement 707 - Alterations to rail corridor alignment and length - section 45C change to proposal approved on 3 October 2008.

Attachment 3 to Statement 707 - To haul iron ore from Christmas Creek to Cloud Break via truck along existing roads, in addition to the approved transportation by train - section 45C change to proposal approved on 23 June 2009.

Attachment 4 to Statement 707 - Additional impact area for rail duplication works (by 102ha) - section 45C change to proposal approved on 21 December 2009.

Attachment 5 to Statement 707 - to realign approximately 6 kilometres of the western portion of the access road used to haul ore from the Christmas Creek to Cloud Break mine sites - change to proposal approved under s45C on 15 March 2010.

Attachment 6 to Statement 707 - Extension of pipeline from the Hillside East reinjection borefield into the Christmas Creek mine site - change to proposal approved under s45C on 6 April 2010.

Attachment 7 to Statement 707 - Construction of additional rail infrastructure; Construction of an access/transport route between the Christmas Creek mine site and Marble Bar Road, as shown in Figure 8 (this replaces the section of road between the Christmas Creek mine site and Marble Bar Road depicted in Figure 3 of Attachment 1); and Removal of production rate from Key Characteristics Table - change to proposal approved under s45C on 28 March 2012.

PDF icon Ministerial Statement 707 March 28, 2012
Cape Lambert Port B development

Attachment 1 – Change to the Tug Harbour Extension dredging footprint area (i.e. updated Table 4 and Figures 2, 4b and 4c) – change to proposal approved under s45C on 12 May 2011.

Attachment 3 – Additional dredging – increase in “large dredge area” and “tug harbour dredge area” (replaced Figure 5, Table 4 and Key Characteristics Table – change to proposal approved under s45C on 22 December 2011.

Attachment 4 – Additional clearing – additional 46 ha of terrestrial clearing. Inclusion of figure 7 depicting Terrestrial Component of the Proposed Footprint – change to proposal approved under s45C on 28 March 2012.

PDF icon Ministerial Statement 840 March 28, 2012