| Title | S45C changes to proposal | Ministerial Statement | Last updated |
|---|---|---|---|
| Yandicoogina Iron Ore Mine and Railway East Hamersley Range (s46) [1265] |
Attachment to Statement 523 - expand existing waste rock dump area by 38ha in a crescent shaped area to the north and northeast; develop a new waste rock dump to the east of the current pit with an area of 22ha, which will be adjacent to the approved future mine pit area; and, develop two stockpile areas with a combined footprint of approximately 15ha to the southeast of the new waste rock dump - change to definition of proposal approved 25 February 2005. Attachment to Statement 523 - Junction Central - new heavy vehicle workshop; new administration offices; new training room; new warehouse; Junction Central duplication of rail loop; Junction Central - expansion of permanent village; expansion of construction camp; upgrade of sewage treatment plant and expansion of effluent spray areas. Junction Central -upgrade of substations at both the Tertiary Crushing and Screening Facilities; new explosives magazine facility; new power distribution infrastmcture; and, realignment of road from airstrip to Junction Central - change to definition of proposal approved 25 February 2005. Attachment to Statement 417 and 523 - change to the description in the Consultative Environmental Review for Statement 417 and to Schedule 1 of Statement 523 - change to description of proposal approved on 12 May 2006. Attachment 1 to Statement 523 - Increase of dewatering cap to 12 GL/a - s45C change to proposal approved on 16 July 2009. Attachment 2 to Statement 523 - To develop a new pit cutback near Phil’s Creek, and to relocate the position of an approved Junction Central waste fines cell - s45C change to proposal approved on 16 June 2010. Attachment 3 to Statement 523 - Increase site footprint by 225ha, additional ore stockpiles and infrastructure, update footprint for site and raise mining rate to 36Mt/a - s45C change to proposal approved on 15 December 2011. |
|
December 15, 2011 |
| Gwindinup Mineral Sands Mine |
Attachment 1 to Statement 718 - Clear an additional 4.3 hectares of native vegetation, increase the mine footprint, increase the amount of ore mined and change the mining period - change to proposal approved under s45C on 8 April 2009. Attachment 2 to Statement 718 – Increase the mine footprint, increase the amount of ore mined and change the mining period – change to proposal approved under s45C on 24 November 2011. |
|
November 24, 2011 |
| Albany Iron Ore Project - Southdown Magnetite Proposal |
Attachment 1 to Statement 816 – Increase in production rate and pit depth, relocation of infrastructure, and changes to pipeline alignment – change to proposal approved under s45C on 27 June 2011. Attachment 2 Statement 816 – Section 45C change to waste dump footprint – change to proposal approved under s45C on 22 November 2011. |
|
November 22, 2011 |
| Channar Mining Project, Hamersley Range |
Attachment 1 to Statement 16 – Change to Schedule 1, Key Characteristics Table – change to proposal approved under s45C on 30 May 2005. Attachment 2 to Statement 16 – Change to 1988 conceptual layout of mine site to current layout – change to proposal approved under s45C on 15 November 2005. Attachment 3 to Statement 16 – Amendment to disturbance boundaries – change to proposal approved under s45C on 12 October 2011. |
|
October 12, 2011 |
| Development of a Quarry and Industrial Site and Setting Aside Land for a Heritage and Conservation Area, King Bay, Burrup Peninsula |
Attachment 1 to Statement 634 - Change to site boundaries and increase in quarry volume - change to proposal approved on 28 September 2011. |
|
September 28, 2011 |
| Dampier to Bunbury Natural Gas Pipeline Stage 5 Expansion |
Attachment 1 to Statement 735- To allow for construction within additional easements granted for the purposes of the Dampier to Bunbury Natural Gas Pipeline - change to proposal approved under s45C on 5 August 2011. |
|
August 5, 2011 |
| Pilbara Iron Ore and Infrastructure Project: Cloud Break (No benefication) |
Attachment 1 to Statement 721 - Increase of dewatering to up to 25 GL/a, and reinjection to up to 18 GL/a - s45C change to proposal (as shown in Figure 4), approved on 25 September 2009. Attachment 2 to Statement 721 - Amend the layout of the Cloud Break mine-site footprint (as shown in figure 5) and increase reinjection from 18 gigalitres to 20 gigalitres per annum - change to proposal approved under s45C on 12 July 2010. Attachment 3 to Statement 721 – Increasing mine dewatering from 25 gigalitres per annum to 30 gigalitres and water injection from 20 gigalitres to 25 gigalitres and amend the annual rate of production – change to proposal approved under s45C on 10 June 2011. |
|
June 10, 2011 |
| Fremantle Port Inner Harbour and Channel Deepening, Reclamation at Rous Head and Offshore Placement of Dredged Material |
Attachment 1 to Statement 801 – A change to the location of offshore placement of dredged material from Fremantle Ports Inner Harbour and Channel Deepening, and related works – change to proposal approved under s45C on 6 August 2010. Attachment 2 to Statement 801 – Extension of dredging duration and removal of dredging timeframe indication – change to proposal approved under s45C on 24 March 2011. |
|
March 24, 2011 |
| Mungada Iron Ore Project |
Attachment 1 – Amendments to project disturbance footprint for additional haul roads and the realignment and widening of existing haul roads – change to proposal approved under s45C on 11 Mar 2011. |
|
March 11, 2011 |
| Speciality Silica Sand Project |
Attachment 1 to Statement 024 - amendment to description of Project area from 540ha Crown Land, 120ha private land to 540 ha Crown Land - approved on 8 May 2008. Attachment 2 to Statement 024 - A second proponent, Urban Resources Pty Ltd, to operate an additional sand quarry and processing works under Statement 024 on lot 5892 Maralla Road - approved on 20 January 2011. Note: Lot 5892 Maralla Road was removed from Statement 024 under section 45C on 8 May 2008. The present 45C process reinstates Lot 5892 Maralla Road as part of Statement 024 and nominates Urban Resources Pty Ltd as the proponent for this piece of land only. Rocla Pty Limited remains the proponent for the remainder of the land under Statement 024. |
|
January 20, 2011 |