ProjectProponent: Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty LtdProposal description: The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West. Assessment Number: 1655Region: PilbaraReferred under EP Act: s38Industry sector: InfrastructureLast updated: August 5, 2011Current Status: Ministerial Statement published 1. ReferralReferral documentation: ANS0633 DBNGP St 5 Looping ARI FinaL _Revised_.pdf (PDF, 31.5 MB) Appendix 3 Wetlands of Loops 9 and 10.pdf (PDF, 311.96 KB) Appendix 4 Typical drawings.pdf (PDF, 1.04 MB) Mattiske 2003a Veg and Flora report.pdf (PDF, 2.92 MB) Mattiske 2003b Veg and Flora report.pdf (PDF, 5.21 MB) Figure 2 Rare and Priority Flora.pdf (PDF, 41.38 MB) Figure 3 Vegetation.pdf (PDF, 5.03 MB) Figure 4 Condition.pdf (PDF, 4.9 MB) 2. Decision on whether to assess this proposalChair's Determination: Assessment on referral information (ARI)Extract of determination: 1655-ChairDets-021006.pdf (PDF, 46.4 KB)Preliminary Environmental Factors: Social SurroundingsFlora and VegetationTerrestrial FaunaHydrological ProcessesInland Waters Environmental QualityDate published: Monday, 2 October, 2006 4. EPA Report on assessmentEPA Report Number: 1231EPA Report: Dampier to Bunbury Natural Gas Pipeline Stage 5 Expansion (PDF, 890.88 KB)Key Environmental Factors: Flora and VegetationTerrestrial Environmental QualityWaterInland Waters Environmental QualityDate published: Wednesday, 4 October, 2006Appeals close: Wednesday, 18 October, 2006 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Wednesday, 13 December, 2006Ministerial Statement: Ministerial Statement 735 (PDF, 1.08 MB) Post-assessment changess. 45C amendments: Attachment 1 to Statement 735- To allow for construction within additional easements granted for the purposes of the Dampier to Bunbury Natural Gas Pipeline - change to proposal approved under s45C on 5 August 2011. Date of approval s. 45C: Friday, 5 August, 2011