Home > Printer-friendly > Printer-friendly > Dampier to Bunbury Natural Gas Pipeline Stage 5 Expansion

Dampier to Bunbury Natural Gas Pipeline Stage 5 Expansion

Project
Proponent: 
Dampier to Bunbury Natural Gas Pipeline (WA) Nominees Pty Ltd
Proposal description: 

The proposal is to construct and operate a number of looping sections adjacent (and connected) to the existing underground gas transmission pipeline within the DBNGP corridor. There are eleven separate looping sections proposed from south of Dampier to Wagerup West.

Assessment Number: 
1655
Region: 
Pilbara
Referred under EP Act: 
s38
Industry sector: 
Infrastructure
Last updated: 
August 5, 2011
Current Status: 
Ministerial Statement published
Ministerial Statement published
1. Referral
Referral documentation: 
PDF icon ANS0633 DBNGP St 5 Looping ARI FinaL _Revised_.pdf
PDF icon Appendix 3 Wetlands of Loops 9 and 10.pdf
PDF icon Appendix 4 Typical drawings.pdf
PDF icon Mattiske 2003a Veg and Flora report.pdf
PDF icon Mattiske 2003b Veg and Flora report.pdf
PDF icon Figure 2 Rare and Priority Flora.pdf
PDF icon Figure 3 Vegetation.pdf
PDF icon Figure 4 Condition.pdf
2. Decision on whether to assess this proposal
Chair's Determination: 
Assessment on referral information (ARI)
Extract of determination: 
PDF icon 1655-ChairDets-021006.pdf
Preliminary Environmental Factors: 
Social Surroundings
Flora and Vegetation
Terrestrial Fauna
Hydrological Processes
Inland Waters Environmental Quality
Date published: 
Monday, 2 October, 2006
4. EPA Report on assessment
EPA Report Number: 
1231
EPA Report: 
PDF icon Dampier to Bunbury Natural Gas Pipeline Stage 5 Expansion
Key Environmental Factors: 
Flora and Vegetation
Terrestrial Environmental Quality
Water
Inland Waters Environmental Quality
Date published: 
Wednesday, 4 October, 2006
Appeals close: 
Wednesday, 18 October, 2006
5. Decision on proposal and implementation of proposal
Ministerial Statement
Date of approval: 
Wednesday, 13 December, 2006
Ministerial Statement: 
PDF icon Ministerial Statement 735
Post-assessment changes
s. 45C amendments: 

Attachment 1 to Statement 735- To allow for construction within additional easements granted for the purposes of the Dampier to Bunbury Natural Gas Pipeline - change to proposal approved under s45C on 5 August 2011.

Date of approval s. 45C: 
Friday, 5 August, 2011