Attachment 1 to Statement 905 – Replacement of Schedule 1 – change to proposal approved under section 45C on 19 December 2013.
Attachment 2 to Statement 905 – Replacement of Schedule 2 – change to proposal approved under section 45C on 19 December 2013.
Attachment 3 to Statement 905 – Increase in disturbance area, Establishment of a ‘Development Envelope’, Ability to locate infrastructure as needed within the Development Envelope, Increase in capacity of Tailings Storage Facility (TSF), Removal of ‘Size of orebody’ and ‘Depth of mine pit’ authorised to “Above groundwater table” – change to proposal approved under section 45C on 9 December 2014.
Attachment 4 to Statement 905 – Amended Benthic Sediment Sampling Table – change to proposal approved under section 45C on 9 December 2014.
Attachment 6 to Statement 905 - Additional clearing for additional pits, Integrated Waste Landform (IWL) and infrastructure; increase in total tailings storage capacity; co-locating tailings within existing waste rock landform to form an IWL; change to Short Description of Proposal to include IWL; removal of reference to two Tailings Storage Facility cells; update to sampling sites and associated lead baseline trigger levels; correction of coordinate errors in Table 4 (Now titled Table 8); change to lead baseline trigger level table numbers to maintain numbering sequence; update of Figures 1 to 17 to include amended sample site locations; update to Figure 18 to include new authorised disturbance footprint - change to proposal approved under section 45C on 19 August 2016.