Attachment 1 to Statement 568 - Changes:
• Updated title and description to refer to Kemerton woodlot - Binningup woodlot deleted
• Refined general description of the wastewater treatment plant (WWTP) • Location description of the WWTP is updated to the current cadastral data description
• Removed references to the 2002, 2003 and 2004 projected treatment capacities - The current maximum treatment capacity (3.6 ML/day) is retained.
• Removed references to treated wastewater quality parameters (now retained solely under Part V Licence L7802)
• Removed reference to the 10 ML storage dam at Binningup and the 7.4 kilometre wastewater conveyance pipeline to Binningup, as neither will be constructed
• Removed reference to Eaton - as Eaton’s wastewater is now directed to Bunbury WWTP • Removed reference to 60 ha woodlot at Binningup
• Updated woodlot site details to reflect Kemerton woodlot - i.e general description, location, area (now 30ha)
• Removed 10ML on-site treated wastewater storage dam (no longer required at Binningup)
Changes to proposal approved under s45c on 1 October 2019