This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: April 29, 2024
The proponent, BHP Iron Ore Pty, proposes to increase power generation capacity at the existing Yarnima Power Station, approximately 2 kilometres north-west of Newman in the Pilbara. The proposal comprises an increase in installed firm power generation capacity from 154 megawatts up to 239 megawatts via installation of gas reciprocating engines and associated infrastructure. The gas reciprocating engines are proposed to be installed in stages up to a maximum of 120 megawatts (nominal).... Read more...Last updated: April 26, 2024
FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...Last updated: April 19, 2024
The Water Corporation submitted a proposal 'Burrup Peninsula Desalinated Water and Seawater Supplies Project' in May 2001 (Water Corporation, 2001a) to service the requirements of new industrial developments on the Burrup Peninsula. The proposed scheme was designed to supply seawater and desalinated water to the Syntroleum Sweetwater Corporation (Syntroleum) gas to liquids plant, with additional capacity to supply one or possibly two other process plants. The EPA released its report (... Read more...Last updated: April 11, 2024
NW Interconnected Power Pty Ltd is seeking to develop the Asian Renewable Energy Hub. The proposal is to construct and operate a large-scale wind and solar hybrid renewable energy project, approximately 220 km east of Port Hedland, WA. The renewable energy will be exported via a subsea power cable to Indonesia and Singapore. Onshore components comprise a series of linear arrays of wind turbines (up to 1,743 turbines) and solar panels distributed across a 644,600 ha development envelope, with a... Read more...Last updated: March 22, 2024
The proposal is the construction and operation of an open cut gold mine and associated infrastructure, located approximately 330 km east-north-east of Kalgoorlie and 200 km east of Laverton. Read more...Last updated: March 7, 2024
Hamersley Iron Pty. Limited (a wholly -owned subsidiary of Rio Tinto) proposes the development of a major iron ore mining operation in the central Pilbara region of Western Australia. The development will be centered around its Koodaideri deposits, located 110 kilometres west-north-west of Newman. The Proposal will involve the construction and operation of a greenfields mine and associated infrastructure. Mining will consist of open pits and supporting infrastructure, including a 167 kilometre... Read more...Last updated: February 29, 2024
Woodside Energy Ltd (Woodside) proposes to construct and operate the Woodside Solar Facility in the Maitland Strategic Industrial Area, located approximately 15 kilometres south-west of Karratha, in the Pilbara region of Western Australia. The proposal will generate electricity (up to 500 megawatts) from a large-scale solar photovoltaic (PV) farm and includes energy storage (battery) infrastructure. The Proposal is only for the infrastructure associated with the generation and storage of... Read more...Last updated: February 23, 2024
The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara region of Western Australia. The proposal is located within a 40,653 ha Development Envelope and will require clearing of no more than 9,628 ha of native vegetation. The proposal includes, but is not limited to, the following: - The development of a series of above and below water table mine pits; - Ore processing facility; - Groundwater abstraction for water supply (for the mine and all... Read more...Last updated: February 19, 2024
The requested change relates to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) for an extension to the Time Limit for Proposal Implementation for the proposal approved under MS 891. With the agreement of the proponent, the Environmental Protection Authority will take no further action in relation to the s.46 inquiry into the proposed changes to condition 3 of Ministerial Statement 1056 (as relevant to Ministerial Statement 891) Read more...Last updated: February 13, 2024
The Pilbara Infrastructure Pty Ltd., a subsidiary of Fortescue Metals Group, proposes to construct and operate a railway of 106 kilometres (km) and associated infrastructure. The East Hamersley Railway Project includes communications and signalling infrastructure, an ore loading facility, groundwater abstraction and discharge, borrow pits and quarries, culverts, bridges, diversion drains, pump station, construction camp, landfills and wastewater treatment plants, and other supporting... Read more...Last updated: February 13, 2024
Chichester Metals Pty Ltd, a subsidiary of Fortescue Metals Group, proposes to develop and operate an iron ore mine approximately 80 kilometres north-west of Newman. The Nyidinghu Iron Ore Mine proposal includes mine pits above and below the water table, an on-site ore processing from various sources, waste rock and tailings storage, an aerodrome, groundwater abstraction, surplus water management including aquifer recharge and other supporting infrastructure. The proposal has a development... Read more...Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: February 9, 2024
Fortescue Metals Group Limited proposes to increase the volume of groundwater abstraction and injection limits at the existing Cloudbreak Mine to 150 gigalitres per annum. Read more...Last updated: February 7, 2024
The Proposal is for the development of the Rhodes Ridge Iron Ore Project (the Proposal), located approximately 40 kilometres north-west of Newman, in the Shire of East Pilbara. The Proposal requires a disturbance footprint of up to 14,850 hectares within a 61,301 hectares Development Envelope. The Proposal includes the development of new above and below water table deposits, and associated activities. The proposal includes but is not limited to: development of new deposits including above and... Read more...Last updated: February 5, 2024
BHP Billiton Iron Ore has prepared a Strategic Proposal of its future operations in the Pilbara for the next 50 to 100 years. The Strategic Proposal will facilitate a more holistic and longer term view of mining activities in the Pilbara region by identifying and assessing how impacts to the environment at a landscape scale will be managed. Read more...Last updated: January 19, 2024
The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and associated elements are proposed to be consolidated into... Read more...Last updated: January 8, 2024
Robe River Mining Co. Pty Ltd. (the proponent) propose to develop new above and below water table iron ore mine pits and associated infrastructure to sustain existing West Angelas operations. The proposal is located approximately 130 kilometres northwest of Newman in the Pilbara region of Western Australia. The proposal will involve clearing of an additional 7,200 hectares (ha) of native vegetation (in addition to the 12,205 ha currently authorised under Ministerial Statement 1113) within a... Read more...Last updated: December 22, 2023
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: December 22, 2023
The Mulga Downs Hub and Rail Spur (the Proposal) is located approximately 210 km south of Port Hedland and 180 km northwest of Newman in the Pilbara region of Western Australia. The Proposal is for the development of a hub and rail spur to connect into the existing Roy Hill Railway for the transport of iron ore to Port Hedland. The Proposal includes truck unloading and train loading facilities, product rehandling facilities, stockyards, a laboratory, a rail loop and rail service tracks, lateral... Read more...Last updated: December 18, 2023
Hamersley HMS Pty Limited (the proponent) proposes to develop two new above water table (AWT) iron ore mine pits at the Hope Downs 2 proposal, located approximately 80 km north-west of the township of Newman in the Pilbara Region of Western Australia. The proposal includes a conceptual footprint of approximately 4,700 hectares (ha) to support the development, operation and closure of two new AWT iron ore deposits within a proposed Development Envelope of approximately 14,085 ha. The key... Read more...