Proposal description: 

FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo.

The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network.

Mining of the magnetite will occur below groundwater and will include a simple open cut operation with clearing and topsoil stockpiling, overburden drilling and blasting followed by conventional removal with truck.

The proposal includes the following key components:

  • Mine pit (clearing of no more than 200 ha);
  • Mining overburden and waste facilities (clearing of no more than 400 ha);
  • Processing waste containment facilities (clearing of no more than 500 ha);
  • Mine and processing support infrastructure (clearing of no more than 2000ha); and
  • Magnetite slurry pipeline, water pipeline and gas pipeline (clearing of no more than 1500 ha).
Assessment Number: 
2154
Region: 
Referred under EP Act: 
s38
Industry sector: 
Last updated: 
June 19, 2024
Current Status: 
Ministerial Statement published
Ministerial Statement published