Title | S45C changes to proposal | Ministerial Statement | Last updated |
---|---|---|---|
Wagerup Cogeneration Project |
Attachment 3 to Statement 729 – Increase the operating hours of the Stage 1 configuration of the Wagerup Cogeneration Facility from 1,000 hours per year to 4,000 hours per year – change to proposal approved under section 45C on 9 March 2018. Attachment 4 to Statement 729 – Installation of a battery energy storage system (BESS), with a battery power output of 100 megawatts. Change to proposal approved under section 45C on 1 April 2021. Attachment 5 to Statement 729 – Increase to operating hours until 30 September 2025. Change to proposal approved under section 45C on 27 June 2024. |
![]() |
June 27, 2024 |
Newmont Boddington Goldmine - Life of Mine Expansion |
Attachment 1 to Ministerial Statement 971 Changes:
Change to conditions approved under s45c 17 May 2019. Attachment 2 to Ministerial Statement 971 - Increase in the Authorised Extent of clearing of vegetation within the disturbance footprint (Table 2). Change to disturbance footprint (Figure 1). Change to conditions approved under s45c on 26 April 2024. |
![]() |
April 26, 2024 |
Kwinana Gas-Fired Power Station (Water Cooled Condenser) |
Attachment to Statement 698 - Amendment of Schedule 1 – Key Proposal Characteristics Table 1 - change to proposal approved on 15 August 2007. Attachment 2 to Statement 698
Changes approved under S45c on 3 November 2020. Attachment 3 to Statement 698 - Increase in power generation capacity and thermal efficiency. Changes approved under S45c on 22 April 2024. |
![]() |
April 24, 2024 |
Koolan Island Iron Ore Mine and Port Facility |
Attachment 1 to Statement 715 - Increase in the accomodation capacity from 200 to 320 people approved under s45C on 2 April 2008. Attachment 2 to Statement 715 - Increase to the disturbance area from 540 hectares to 590 hectares - change to proposal approved under s45C on 4 Mar 2009. Attachment 3 to Statement 715 – Increase in groundwater abstraction from 75 kilolitres per day to 120 kilolitres per day of fresh water from existing bores, for potable use – change to proposal approved under s45C on 11 January 2012. Attachment 4 to Statement 715 – Increase to disturbance footprint from 590 ha to 650 ha – change to proposal approved under section 45C on 21 June 2012. Attachment 5 to Statement 715 – Increase to disturbance footprint from 650 ha to 655 ha – change to proposal approved under section 45C on 26 November 2014. Attachment 6 to Statement 715 - Reclamation, crushing and shipping of quartzite ore from waste dumps - change to proposal approved under section 45C on 20 May 2015. Attachment 7 to Statement 715 - Reconstruction of a portion of engineered seawall at Arbitration Cove; Dewatering approximately 25 GL of seawater from the inundated Main Pit at a rate of up to approximately 1,600 L/s; and Administrative change to amend total disturbance area for the proposal from approximately 655 ha” to “up to 670 ha” - change to proposal approved under section 45C on 13 April 2018. Attachment 8 to Statement 715 - Changes:
Change to proposal approved under section 45C on 20 August 2019. Attachment 9 to Statement 715 - Introduce a 1,211 ha development envelope and amend disturbance footprint as depicted in Figure 1. Remove the prescribed pit depths at closure. Remove the prescribed waste rock capacity. Remove maintenance of dewatering and reference to the Marine Management Plan (MMP) and remove dewatering of Main Pit and discharge associated with reconstruction of the seawall. Amend the prescribed potable water use limit of 120 kl per day to a maximum of 200000 kl/annum inclusive of both potable and non-potable water use over the remaining of the life of mine. Include operation of the seawall barge ramp and the construction of the seawall decommission trench within the proposed development envelope. Amend the reference to processing in the key characteristics table from ‘two-stage dry crushing and screening plant’ to ‘dry crushing and screening plant’. Change to proposal approved under section 45C on 24 April 2024. |
![]() |
April 24, 2024 |
Murrin Murrin Nickel-Cobalt Project Stage 2 Expansion |
Attachment 1 – The use of Pit2/3 for periodic tailings disposal – change to proposal approved under s45C on 31 January 2005. Attachment 2 – The construction and operation of a Heap Leach Facility located south-east of the existing Murrin Murrin processing plant (approximate coordinates GDA 391400mE, 6815800mE) as shown in Figure 1 – change to proposal approved under s45C on 8 December 2005. Attachment 3 – Changes to Schedule 1, Key Characteristics Table relating to the continued operation of the Heap Leach Facility allowing ore processing to remain at 0.5 Mtpa for ‘life of mine’ – change to proposal approved under s45C on 24 January 2012. Attachment 4 – Changes to Schedule 1, Key Characteristics table relating to the clearing of an additional 300 ha of vegetation to allow for the development of additional Pits, Waste Dumps and Ore Stockpiles – change to proposal approved under section 45C on 27 March 2013. Attachment 5 – Removal of Groundwater criteria from the Key Characteristics Table – change to proposal approved under section 45C on 20 December 2016. Attachment 6 - The change is to amend the authorised extent, including:
Change to proposal approved under section 45C on 17 September 2018. Attachment 7 – Reduce the authorised land disturbance within the development envelope at Attachment 8 – No additional clearing, emissions or discharges or changes to the life of mine. Ministerial Statement figures updated to include proposal supporting infrastructure previously presented in Attachment 6 and incorrectly omitted from Attachment 7 due to an administrative error. Figures updated to include water pipeline connections that were omitted due to an error of transcription in Attachment 6. The development envelope details in Table 2 updated to correctly reference mining and borefield development envelopes referenced in the corrected figures. The development envelope extent of 20,172 hectares (ha) in Table 2 has been moved to the correct location under ‘Pits, Waste Dumps and Ore Stockpiles’ in Table 2. – change to proposal approved under section 45C on 24 April 2024. |
![]() |
April 24, 2024 |
Upgrade of multi-user seawater supply and introduction of wastewater to ocean outfall, Burrup Peninsula (s46) |
Attachment 1 to Statement 594 - Construct and operate alternative seawater intake pump system - change to proposal approved on 5 March 2010. Attachment 2 to Statement 594 - Construct and operate a six gigalitre per annum reverse osmosis desalination plant to supply industry and domestic customers. - change to proposal approved on 6 August 2010. Attachment 3 to Statement 594 – Define the development envelope using spatial coordinates (Replace Figure 2 of MS 594 with defined development envelope in schedule 3 (new)). Increase development envelope by 1.44 ha, from 17.96 to 19.40 ha. Increase in clearing by 0.26 ha, from 6.36 to 6.62 ha. Delete in Table 2 the element Operational Noise, and description: Seawater intake system: “less than 70 dB(A) at 1 metre from pump well”. Change to proposal approved under s45C on 19 April 2024. |
![]() |
April 19, 2024 |
Yanchep Rail Extension: Part 1 – Butler to Eglinton |
Attachment 1 to Statement 1100 - Change to the authorised extent in Schedule 1 Table 2 in Ministerial Statement 1100, including: Change approved under S45c on 12 October 2020. Attachment 2 to Statement 1100 - Increase the development envelope from 57.18 hectares (ha) to 60.69 ha. Decrease the authorised extent of native vegetation clearing from 32.3 ha to 31.64 ha. Decrease the authorised extent of Carnaby’s cockatoo habitat that can be cleared from 44.7 ha to 43.98 ha. Update Figures 1 to 4 to reflect the amendments to the development envelope. Updated coordinates defining the Yanchep Rail Extension Part 1 – Butler to Eglinton development envelope.Change approved under S45c on 19 April 2024. |
![]() |
April 19, 2024 |
St Ives Gold Mine – Beyond 2018 Project (Revised Proposal) |
Attachment 1 to Statement 1128 - Increase in the size of the development envelope by 572 hectares. Inclusion of a hybrid energy-source powered microgrid (hybrid microgrid) within the land-based operations. Change to conditions approved 18 December 2023. Attachment 2 to Statement 1128 - Increase to extent of development envelope by 4 ha. Realignment of a transmission line associated with the hybrid energy-source powered microgrid.. Change to conditions approved 19 April 2024. |
![]() |
April 19, 2024 |
Asian Renewable Energy Hub |
Attachment 1 to Statement 1153 - Change to condition 6, condition 7 and condition 8 and Table 3 of Schedule 1. Changes approved under s.45C on 11 April 2024 |
![]() |
April 11, 2024 |
Rockingham Industrial Zone Strategic Environmental Assessment (Formerly IP14) |
Attachment 1 to Statement 863 – Add 4.36 hectares to the Rockingham Industrial Zone Strategic Proposal area – change to proposal approved under section 45C on 4 October 2013. Attachment 2 to Statement 863 – Addition of 197.54 hectares (ha) to the original proposal area and inclusion of the Conservation Area of 91 ha in Table 2 – change to proposal approved under section 45C on 22 October 2014. Attachment 3 to Statement 863 – Change the Conservation Area boundaries to remove a rail corridor from the south and provide additional land in the north – change to proposal approved under section 45C on 11 November 2015. |
![]() |
April 3, 2024 |