Attachment 1 to Statement 873 – An amendment to the turning basin identified in Figure 6 of Schedule 1 – change to proposal approved under section 45C on 14 Jan 2013.
Attachment 2 to Statement 873 – An amendment to delete reference to utilities, discharges and capacity limits detailed in Schedule 1 – change to proposal approved under section 45C on 28 February 2013.
Attachment 3 to Statement 873 – Inclusion of offshore Sand Borrow Area for trunkline installation – change to proposal approved under section 45C on 18 March 2013.
Attachment 4 to Statement 873 – Amendment to coordinates of Overflow Control Zones – change to proposal approved under section 45C on 18 March 2013.
Attachment 5 to Statement 873 – Deletion of the Shipping Channel (both nearshore and offshore component), Materials Offloading Facility, access road located within the Port of Ashburton, and Dredge Spoil Disposal Site A, and a reduction in the associated disturbance footprint. – change to proposal approved under section 45C on 21 April 2020.