Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (14) Apply Iron Ore filter
  • Infrastructure (12) Apply Infrastructure filter
  • Power generation (8) Apply Power generation filter
  • Industrial (5) Apply Industrial filter
  • Gold (4) Apply Gold filter
  • Land use (4) Apply Land use filter
  • Mineral sands (4) Apply Mineral sands filter
  • Sand, rock, gravel and clay (4) Apply Sand, rock, gravel and clay filter
  • Bauxite (3) Apply Bauxite filter
  • Salt (2) Apply Salt filter
  • Utilities (2) Apply Utilities filter
  • Aquaculture (1) Apply Aquaculture filter
  • Copper (1) Apply Copper filter
  • Lithium (1) Apply Lithium filter
  • Nickel (1) Apply Nickel filter
  • Oil and gas (1) Apply Oil and gas filter

Filter by current status:

  • Decision on whether to assess has been published (13) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (13) Apply Environmental Scoping Document approved filter
  • Ministerial Statement published (13) Apply Ministerial Statement published filter
  • Public Environmental Review period closed (6) Apply Public Environmental Review period closed filter
  • Assessment on Proponent Information – public submission period closed (5) Apply Assessment on Proponent Information – public submission period closed filter
  • Assessment has been terminated under s40A of the EP Act (3) Apply Assessment has been terminated under s40A of the EP Act filter
  • Assessment on Proponent Information – Request for More Information published (3) Apply Assessment on Proponent Information – Request for More Information published filter
  • EPA Report and Recommendations released - appeals closed (3) Apply EPA Report and Recommendations released - appeals closed filter
  • Ministerial Statement withdrawn under s.47A (2) Apply Ministerial Statement withdrawn under s.47A filter
  • Assessment on Proponent Information – open for public submissions (1) Apply Assessment on Proponent Information – open for public submissions filter
  • EPA Report and Recommendations released - appeals open (1) Apply EPA Report and Recommendations released - appeals open filter
  • Report and recommendations in preparation (1) Apply Report and recommendations in preparation filter

Filter by relevant environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (59) Apply Flora and Vegetation filter
  • Terrestrial Fauna (56) Apply Terrestrial Fauna filter
  • Inland Waters (44) Apply Inland Waters filter
  • Subterranean Fauna (24) Apply Subterranean Fauna filter
  • Marine Environmental Quality (17) Apply Marine Environmental Quality filter
  • Terrestrial Environmental Quality (15) Apply Terrestrial Environmental Quality filter
  • Benthic Communities and Habitats (13) Apply Benthic Communities and Habitats filter
  • Marine Fauna (13) Apply Marine Fauna filter
  • Coastal Processes (12) Apply Coastal Processes filter
  • Landforms (11) Apply Landforms filter
  • Greenhouse Gas Emissions (10) Apply Greenhouse Gas Emissions filter
  • Inland Waters Environmental Quality (5) Apply Inland Waters Environmental Quality filter
  • Air Quality (4) Apply Air Quality filter
  • Hydrological Processes (3) Apply Hydrological Processes filter

Filter by Proponent:

  • BHP Iron Ore Pty Ltd (4) Apply BHP Iron Ore Pty Ltd filter
  • Alcoa of Australia Limited (3) Apply Alcoa of Australia Limited filter
  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Main Roads Western Australia (2) Apply Main Roads Western Australia filter
  • Pilbara Energy (Generation) Pty Ltd (2) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Regional Power Corporation T/A Horizon Power (2) Apply Regional Power Corporation T/A Horizon Power filter
  • Rottnest Island Authority (2) Apply Rottnest Island Authority filter
  • 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd. (1) Apply 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd. filter
  • Atlas Iron Pty Ltd (1) Apply Atlas Iron Pty Ltd filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Boskalis Australia Pty Limited (1) Apply Boskalis Australia Pty Limited filter
  • Cable Sands (WA) Pty Ltd (1) Apply Cable Sands (WA) Pty Ltd filter
  • Commissioner of Main Roads Western Australia (Main Roads) (1) Apply Commissioner of Main Roads Western Australia (Main Roads) filter
  • De Grey Mining Ltd (1) Apply De Grey Mining Ltd filter
  • Director General of the Department of Transport on behalf of the State of Western Australia (1) Apply Director General of the Department of Transport on behalf of the State of Western Australia filter
  • Doral Mineral Sands Pty Ltd (1) Apply Doral Mineral Sands Pty Ltd filter
  • Electricity Networks Corporation trading as Western Power (1) Apply Electricity Networks Corporation trading as Western Power filter
  • FMG Iron Bridge (Aust) Pty Ltd (1) Apply FMG Iron Bridge (Aust) Pty Ltd filter
  • FutureEnergy Australia Pty Ltd (1) Apply FutureEnergy Australia Pty Ltd filter
  • Gascoyne Gateway Ltd (1) Apply Gascoyne Gateway Ltd filter
  • Hancock Prospecting Pty Ltd (1) Apply Hancock Prospecting Pty Ltd filter
  • Iluka resources (1) Apply Iluka resources filter
  • Infinite Green Energy Limited (1) Apply Infinite Green Energy Limited filter
  • Italia Stone Group Pty Ltd (1) Apply Italia Stone Group Pty Ltd filter
  • K + S Salt Australia Pty Ltd (1) Apply K + S Salt Australia Pty Ltd filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Keysbrook Leucoxene Pty Ltd (1) Apply Keysbrook Leucoxene Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (1) Apply Leichhardt Industrials Pty Ltd filter
  • MEPAU Perth Basin Pty Ltd (1) Apply MEPAU Perth Basin Pty Ltd filter
  • Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust (1) Apply Murchison Hydrogen Renewables Pty Ltd as trustee for Murchison Hydrogen Renewables Project Trust filter
  • Newmont Boddington Gold Pty Ltd (1) Apply Newmont Boddington Gold Pty Ltd filter
  • Perdaman Chemicals and Fertilisers Pty Ltd (1) Apply Perdaman Chemicals and Fertilisers Pty Ltd filter
  • Process Minerals International (PMI) a wholly owned subsidiary of Mineral Resources Limited (MinRes) (ACN 118 549 910) (1) Apply Process Minerals International (PMI) a wholly owned subsidiary of Mineral Resources Limited (MinRes) (ACN 118 549 910) filter
  • Ravensthorpe Nickel Operations Pty Ltd (1) Apply Ravensthorpe Nickel Operations Pty Ltd filter
  • Rio Tinto Winu Pty Limited (1) Apply Rio Tinto Winu Pty Limited filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Robe River Mining Co. Pty Ltd. (1) Apply Robe River Mining Co. Pty Ltd. filter
  • Shire of Ashburton (1) Apply Shire of Ashburton filter
  • Simcoa Operations Pty Ltd (1) Apply Simcoa Operations Pty Ltd filter
  • Smiths 2014 Pty Ltd (1) Apply Smiths 2014 Pty Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • Stati Group of Companies (1) Apply Stati Group of Companies filter
  • Talison Lithium Australia Pty Ltd (1) Apply Talison Lithium Australia Pty Ltd filter
  • Tassal Operations Pty Ltd (1) Apply Tassal Operations Pty Ltd filter
  • The Pilbara Infrastructure Pty Ltd (1) Apply The Pilbara Infrastructure Pty Ltd filter
  • VRX Silica Limited (1) Apply VRX Silica Limited filter
  • Water Corporation (1) Apply Water Corporation filter
  • Water Corporation of Western Australia (1) Apply Water Corporation of Western Australia filter
  • Western Australian Land Authority (trading as DevelopmentWA) (1) Apply Western Australian Land Authority (trading as DevelopmentWA) filter

Filter by region:

  • Pilbara (24) Apply Pilbara filter
  • Perth (10) Apply Perth filter
  • South West (10) Apply South West filter
  • Mid West (5) Apply Mid West filter
  • Kimberley (4) Apply Kimberley filter
  • Goldfields Esperance (3) Apply Goldfields Esperance filter
  • Peel (3) Apply Peel filter
  • Wheatbelt (3) Apply Wheatbelt filter
  • Gascoyne (2) Apply Gascoyne filter

Filter by last updated:

  • (-) Remove 2025 filter 2025
  1. Home
  2. Proposal search
  3. Social Surroundings
  4. 2025

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Mulga Downs Iron Ore Mine

Last updated: September 30, 2025

The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara Region of Western Australia. The Proposal includes and is not limited to the following: The development of a series of above and below water table mine pits; Dry ore crushing and screening plant(s); Groundwater abstraction for construction, water supply (for the mine and all associated infrastructure) and for the dewatering to facilitate the recovery of ore below water table in the mine pits;... Read more...

Northern Extension to Yalyalup Minerals Sands Project

Last updated: September 23, 2025

The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). Read more...

South Thomson Development Barge Landing Project

Last updated: September 15, 2025

The Proposal is to extend and redevelop the existing Army Groyne into a barge operations facility in South Thomson Bay at Wadjemup / Rottnest Island. The Proposal includes: Dredging for the purpose of construction for a breakwater/laydown area and for a barge turning circle. Use of dredge spoil for re-use as reclamation to create a laydown area. Extension of the existing Army Groyne to create a breakwater. Barge landing ramp. Ferry berth. Small craft landing facility. Fuel storage and... Read more...

Baru-Marnda Renewable Energy Project

Last updated: September 15, 2025

Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...

Cataby Mineral Sands Project (s. 46)

Last updated: September 15, 2025

To mine a series of open pits over approximately 25 kilometres, within the Cataby Mineral Sands Project located approximately 150 km north of Perth. Inquiry under s46 relating to Ministerial Statement 720 and EPA Report 1212 . Read more...

Ravensthorpe Nickel Project (s46)

Last updated: September 10, 2025

Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: September 5, 2025

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

Winu Project

Last updated: September 3, 2025

Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...

Tantabiddi Boating Facility

Last updated: September 2, 2025

The Department of Transport is proposing to build a new boating facility about 300 metres south of Tantabiddi Creek, located in the Ningaloo Marine Park, the Jurabi Coastal Park and the Ningaloo Coast National and World Heritage Areas, near Exmouth. The proposed new facility would replace the existing boat ramp at Tantabiddi Creek, and involves: dredging of the harbour basin and entrance channel land reclamation and vegetation clearing construction of breakwaters, revetments, boat ramps,... Read more...

Greenbushes Lithium Mine: Waste Rock Landforms, Salt Water Gully Dam and additional clearing for infrastructure

Last updated: September 1, 2025

Talison Lithium Australia Pty Ltd (Talison) propose to expand the existing Greenbushes Lithium Mine that has been operating for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation to incorporate: Construction of the S2 waste rock landform (WRL) as an expansion of the Floyds WRL. Construction and operation of the S8 WRL to the east of the existing proposal development... Read more...

Robe Valley Iron Ore Mine

Last updated: August 28, 2025

Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...

Arrowsmith North Silica Sand Project

Last updated: August 28, 2025

VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...

West Angelas Revised Proposal

Last updated: August 26, 2025

Robe River Mining Co. Pty Ltd. (the proponent) propose to develop new above and below water table iron ore mine pits and associated infrastructure to sustain existing West Angelas operations. The proposal is located approximately 130 kilometres northwest of Newman in the Pilbara region of Western Australia. The proposal will involve clearing of an additional 7,200 hectares (ha) of native vegetation (in addition to the 12,205 ha currently authorised under Ministerial Statement 1113) within a... Read more...

North Star Magnetite Project Extension

Last updated: August 25, 2025

FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...

Pinjarra Alumina Refinery Revised Proposal

Last updated: August 22, 2025

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Bauxite mining on the Darling Range in the southwest of WA for the years 2023 to 2027

Last updated: August 22, 2025

The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2023 to 2027. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. A 2023-27 MMP has not yet been approved through the State Agreement Act framework but activities are still proposed to be undertaken during this time, and... Read more...

Jimblebar Hub Significant Amendment

Last updated: August 20, 2025

The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and associated elements are proposed to be consolidated into... Read more...

Port Hedland Iron Project – Stage 1 (formerly Port Hedland Green Steel Project – Stage 1)

Last updated: August 18, 2025

Port Hedland Iron Pty Ltd (formerly Port Hedland Green Steel) proposes to develop a large-scale downstream iron ore processing facility known as the Port Hedland Green Steel Project – Stage 1. The proposal is located in the Boodarie Strategic Industrial Area (BSIA) approximately 10 km south-west of Port Hedland in the Pilbara region. The proposal will consist of a pellet plant and a hot briquette iron (HBI) plant, consuming approximately 3 - 3.5 million tonnes per annum (Mtpa) of iron ore. Most... Read more...

Tonkin Highway Grade Separated Interchanges (Hale Road and Welshpool Road)

Last updated: August 18, 2025

The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...

Anketell Road Upgrade (Leath Road to Kwinana Freeway)

Last updated: August 18, 2025

Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...

Pages

  • 1
  • 2
  • 3
  • 4
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.