Mt Keith Satellite Project

Project
Proposal description

BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations.

The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process.

Assessment Number
2122
Referred under EP Act
s38
Industry sector
Last updated
Current Status
Ministerial Statement published
1. Referral
2. Decision on whether to assess this proposal
3. Assessment
Scoping
Approved
Environmental Review
Environmental Review documentation
Change to proposal during assessment under s. 43A
Date of approval s. 43A
4. EPA Report on assessment
EPA Report Number
1625
Date published
Appeals close
5. Decision on proposal and implementation of proposal
Ministerial Statement
Comments

Attachment 1 to Statement 1087

Changes:

  • Revise development envelope by net increase of 6 hectares.
  • Increase to clearing of native vegetation by 191 hectares.

Changes to proposal approved under s45c on 16 September 2020

Date of approval
Ministerial Statement
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info

Printer Friendly, PDF & Email