Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Iron Ore (27) Apply Iron Ore filter
  • Infrastructure (20) Apply Infrastructure filter
  • Land use (10) Apply Land use filter
  • Utilities (10) Apply Utilities filter
  • Mineral sands (9) Apply Mineral sands filter
  • Power generation (8) Apply Power generation filter
  • Gold (7) Apply Gold filter
  • Sand, rock, gravel and clay (6) Apply Sand, rock, gravel and clay filter
  • Bauxite (5) Apply Bauxite filter
  • Copper (5) Apply Copper filter
  • Industrial (5) Apply Industrial filter
  • Oil and gas (5) Apply Oil and gas filter
  • Salt (4) Apply Salt filter
  • Waste management (4) Apply Waste management filter
  • Lithium (3) Apply Lithium filter
  • Nickel (3) Apply Nickel filter
  • Rare earth elements (2) Apply Rare earth elements filter
  • Manganese (1) Apply Manganese filter
  • Molybdenum (1) Apply Molybdenum filter
  • Potash (1) Apply Potash filter

Filter by current status:

  • Ministerial Statement published (36) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (31) Apply Decision on whether to assess has been published filter
  • Environmental Scoping Document approved (16) Apply Environmental Scoping Document approved filter
  • Assessment has been terminated under s40A of the EP Act (12) Apply Assessment has been terminated under s40A of the EP Act filter
  • EPA Report and Recommendations released - appeals closed (8) Apply EPA Report and Recommendations released - appeals closed filter
  • Public Environmental Review period closed (7) Apply Public Environmental Review period closed filter
  • Assessment on Proponent Information – public submission period closed (6) Apply Assessment on Proponent Information – public submission period closed filter
  • Assessment on Proponent Information – Request for More Information published (4) Apply Assessment on Proponent Information – Request for More Information published filter
  • Report and recommendations in preparation (2) Apply Report and recommendations in preparation filter
  • Assessment on Proponent Information – open for public submissions (1) Apply Assessment on Proponent Information – open for public submissions filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter
  • Response to submission published (1) Apply Response to submission published filter

Filter by relevant environmental factors:

  • (-) Remove Inland Waters filter Inland Waters
  • (-) Remove Terrestrial Fauna filter Terrestrial Fauna
  • Flora and Vegetation (123) Apply Flora and Vegetation filter
  • Social Surroundings (105) Apply Social Surroundings filter
  • Subterranean Fauna (47) Apply Subterranean Fauna filter
  • Terrestrial Environmental Quality (43) Apply Terrestrial Environmental Quality filter
  • Marine Environmental Quality (20) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (17) Apply Benthic Communities and Habitats filter
  • Landforms (17) Apply Landforms filter
  • Marine Fauna (17) Apply Marine Fauna filter
  • 3144 (15) Apply 3144 filter
  • 37 (14) Apply 37 filter
  • Coastal Processes (11) Apply Coastal Processes filter
  • Greenhouse Gas Emissions (10) Apply Greenhouse Gas Emissions filter
  • Human Health (8) Apply Human Health filter
  • Air Quality (4) Apply Air Quality filter

Filter by Proponent:

  • BHP Iron Ore Pty Ltd (5) Apply BHP Iron Ore Pty Ltd filter
  • Alcoa of Australia Limited (3) Apply Alcoa of Australia Limited filter
  • Image Resources NL (3) Apply Image Resources NL filter
  • Main Roads Western Australia (3) Apply Main Roads Western Australia filter
  • Public Transport Authority of Western Australia (3) Apply Public Transport Authority of Western Australia filter
  • Tronox Management Pty Ltd (3) Apply Tronox Management Pty Ltd filter
  • Atlas Iron Pty Ltd (2) Apply Atlas Iron Pty Ltd filter
  • Chichester Metals Pty Ltd (2) Apply Chichester Metals Pty Ltd filter
  • Leichhardt Industrials Pty Ltd (2) Apply Leichhardt Industrials Pty Ltd filter
  • Main Roads WA (2) Apply Main Roads WA filter
  • Pilbara Energy (Generation) Pty Ltd (2) Apply Pilbara Energy (Generation) Pty Ltd filter
  • Public Transport Authority (2) Apply Public Transport Authority filter
  • Agrimin Limited (1) Apply Agrimin Limited filter
  • Alkina Holdings Pty Ltd (1) Apply Alkina Holdings Pty Ltd filter
  • API Management Pty Limited (1) Apply API Management Pty Limited filter
  • Atlas Iron Pty. Ltd. (1) Apply Atlas Iron Pty. Ltd. filter
  • BHP Billiton Iron Ore Pty Ltd (1) Apply BHP Billiton Iron Ore Pty Ltd filter
  • Brikmakers (BGC Australia Pty Ltd) (1) Apply Brikmakers (BGC Australia Pty Ltd) filter
  • Brockman Mining Australia Pty Ltd (1) Apply Brockman Mining Australia Pty Ltd filter
  • City of Busselton (1) Apply City of Busselton filter
  • City of Gosnells (1) Apply City of Gosnells filter
  • Covalent Lithium Pty Ltd (1) Apply Covalent Lithium Pty Ltd filter
  • DBNGP (WA) Nominees Pty Limited (1) Apply DBNGP (WA) Nominees Pty Limited filter
  • Doral Mineral Sands Pty Ltd (1) Apply Doral Mineral Sands Pty Ltd filter
  • Forest Products Commission of Western Australia (1) Apply Forest Products Commission of Western Australia filter
  • Forge Resources Swan Pty Ltd (1) Apply Forge Resources Swan Pty Ltd filter
  • Hamersley HMS Pty Limited (1) Apply Hamersley HMS Pty Limited filter
  • Hamersley Iron Pty Limited (1) Apply Hamersley Iron Pty Limited filter
  • Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) (1) Apply Hamersley Iron Pty Limited (a wholly owned subsidiary of Rio Tinto) filter
  • Hanson Construction Materials Pty Ltd (1) Apply Hanson Construction Materials Pty Ltd filter
  • Iluka Resources Limited (1) Apply Iluka Resources Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • Karara Mining Limited (1) Apply Karara Mining Limited filter
  • Mardie Minerals Pty Ltd (1) Apply Mardie Minerals Pty Ltd filter
  • Moly Metals Australia Pty Ltd (1) Apply Moly Metals Australia Pty Ltd filter
  • MRC Graphite Pty Ltd (1) Apply MRC Graphite Pty Ltd filter
  • Newmont Boddington Gold Pty Ltd (1) Apply Newmont Boddington Gold Pty Ltd filter
  • NW Interconnected Power Pty Ltd (1) Apply NW Interconnected Power Pty Ltd filter
  • Robe River Mining Co. Pty. Ltd (1) Apply Robe River Mining Co. Pty. Ltd filter
  • Rottnest Island Authority (1) Apply Rottnest Island Authority filter
  • Roy Hill Infrastructure Pty Ltd (1) Apply Roy Hill Infrastructure Pty Ltd filter
  • Roy Hill Iron Ore Pty Ltd (1) Apply Roy Hill Iron Ore Pty Ltd filter
  • SF Irrigation Cooperative Limited (1) Apply SF Irrigation Cooperative Limited filter
  • Shire of Ashburton (1) Apply Shire of Ashburton filter
  • Shire of Broome (1) Apply Shire of Broome filter
  • South32 Worsley Alumina Pty Ltd (1) Apply South32 Worsley Alumina Pty Ltd filter
  • Southern Ports Authority (1) Apply Southern Ports Authority filter
  • Subsea 7 Contracting Pty Ltd (1) Apply Subsea 7 Contracting Pty Ltd filter
  • Talison Lithium Australia Pty Ltd (1) Apply Talison Lithium Australia Pty Ltd filter
  • Tellus Holdings Ltd (1) Apply Tellus Holdings Ltd filter

Filter by region:

  • Pilbara (46) Apply Pilbara filter
  • Perth (25) Apply Perth filter
  • South West (14) Apply South West filter
  • Mid West (13) Apply Mid West filter
  • Goldfields Esperance (8) Apply Goldfields Esperance filter
  • Kimberley (7) Apply Kimberley filter
  • Peel (5) Apply Peel filter
  • Wheatbelt (4) Apply Wheatbelt filter
  • Gascoyne (3) Apply Gascoyne filter
  • Great Southern (2) Apply Great Southern filter

Filter by last updated:

  • 2025 (48) Apply 2025 filter
  • 2024 (31) Apply 2024 filter
  • 2023 (15) Apply 2023 filter
  • 2022 (7) Apply 2022 filter
  • 2021 (9) Apply 2021 filter
  • 2020 (9) Apply 2020 filter
  • 2019 (5) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2015 (1) Apply 2015 filter
  1. Home
  2. Proposal search
  3. Inland Waters
  4. Terrestrial Fauna

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Mulga Downs Iron Ore Mine

Last updated: September 30, 2025

The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara Region of Western Australia. The Proposal includes and is not limited to the following: The development of a series of above and below water table mine pits; Dry ore crushing and screening plant(s); Groundwater abstraction for construction, water supply (for the mine and all associated infrastructure) and for the dewatering to facilitate the recovery of ore below water table in the mine pits;... Read more...

Northern Extension to Yalyalup Minerals Sands Project

Last updated: September 23, 2025

The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). Read more...

Dampier to Bunbury Natural Gas Pipeline Southern Looping Project, Loop 10, South of Kwinana (S46) [2449]

Last updated: September 16, 2025

Changes to condition 9 in order to remove prescriptive rehabilitation criteria related to the rehabilitation of the proposal. Condition 9 of Ministerial Statement 708 is deleted and replaced with Ministerial Statement 1256. Read more...

Baru-Marnda Renewable Energy Project

Last updated: September 15, 2025

Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...

Kemerton Strategic Industrial Area (KSIA)

Last updated: September 5, 2025

DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...

Winu Project

Last updated: September 3, 2025

Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...

Greenbushes Lithium Mine: Waste Rock Landforms, Salt Water Gully Dam and additional clearing for infrastructure

Last updated: September 1, 2025

Talison Lithium Australia Pty Ltd (Talison) propose to expand the existing Greenbushes Lithium Mine that has been operating for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation to incorporate: Construction of the S2 waste rock landform (WRL) as an expansion of the Floyds WRL. Construction and operation of the S8 WRL to the east of the existing proposal development... Read more...

Robe Valley Iron Ore Mine

Last updated: August 28, 2025

Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...

Revised Proposal for the Roy Hill Iron Ore Mine

Last updated: August 28, 2025

The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...

Arrowsmith North Silica Sand Project

Last updated: August 28, 2025

VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...

West Angelas Revised Proposal

Last updated: August 26, 2025

Robe River Mining Co. Pty Ltd. (the proponent) propose to develop new above and below water table iron ore mine pits and associated infrastructure to sustain existing West Angelas operations. The proposal is located approximately 130 kilometres northwest of Newman in the Pilbara region of Western Australia. The proposal will involve clearing of an additional 7,200 hectares (ha) of native vegetation (in addition to the 12,205 ha currently authorised under Ministerial Statement 1113) within a... Read more...

North Star Magnetite Project Extension

Last updated: August 25, 2025

FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...

Pinjarra Alumina Refinery Revised Proposal

Last updated: August 22, 2025

Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...

Bauxite mining on the Darling Range in the southwest of WA for the years 2023 to 2027

Last updated: August 22, 2025

The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2023 to 2027. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. A 2023-27 MMP has not yet been approved through the State Agreement Act framework but activities are still proposed to be undertaken during this time, and... Read more...

Jimblebar Hub Significant Amendment

Last updated: August 20, 2025

The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and associated elements are proposed to be consolidated into... Read more...

Tonkin Highway Grade Separated Interchanges (Hale Road and Welshpool Road)

Last updated: August 18, 2025

The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...

Anketell Road Upgrade (Leath Road to Kwinana Freeway)

Last updated: August 18, 2025

Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...

Eramurra Solar Salt Project

Last updated: August 15, 2025

Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...

Northern Terminal to Neerabup Terminal 330kV Transmission Line

Last updated: August 7, 2025

The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup... Read more...

Dongara Titanium Minerals Project (s46) [2505]

Last updated: August 4, 2025

Time limit for substantial commencement and review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for the relevant environmental factors. Read more...

Pages

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.