This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: September 30, 2025
The Proposal is located 210 km south of Port Hedland and 180 km north west of Newman in the Pilbara Region of Western Australia. The Proposal includes and is not limited to the following: The development of a series of above and below water table mine pits; Dry ore crushing and screening plant(s); Groundwater abstraction for construction, water supply (for the mine and all associated infrastructure) and for the dewatering to facilitate the recovery of ore below water table in the mine pits;... Read more...Last updated: September 23, 2025
The proposal includes the expansion of a mineral sands mine including mine pits with dewatering to facilitate dry mining techniques. Existing processing facilities, services and support infrastructure will be utilised. Mine voids will be progressively backfilled with sand and clay tailings and rehabilitated to pre-disturbance landuse (i.e. pasture). Read more...Last updated: September 16, 2025
Changes to condition 9 in order to remove prescriptive rehabilitation criteria related to the rehabilitation of the proposal. Condition 9 of Ministerial Statement 708 is deleted and replaced with Ministerial Statement 1256. Read more...Last updated: September 15, 2025
Yindjibarndi Energy Corporation is proposing to develop the Baru-Marnda Renewable Energy Project, approximately 50 km south of Karratha, in the Pilbara region of Western Australia. The proposal is located on Yindjibarndi Ngurra country where Yindjibarndi People hold exclusive possession native title rights and interests. The proposal comprises 133 wind turbines and four solar array areas generating up to 1,000 and 500 Megawatts respectively. Other associated infrastructure includes battery... Read more...Last updated: September 5, 2025
DevelopmentWA is seeking to develop the Kemerton Strategic Industrial Area (KSIA) for the purpose of industrial and infrastructure development as a strategic proposal. The KSIA is located within the Shire of Harvey, 17 kilometres north of Bunbury. The KSIA key characteristics are: Development of the Kemerton Strategic industry Zone (Industry Core) which is approximately 2,024 hectares (ha). There is an approximate 50-year time period for development. Ultimate land use proposed is to be heavy... Read more...Last updated: September 3, 2025
Rio Tinto Winu Pty Limited (the Proponent) proposes to develop the Winu Project (the Proposal). The Proposal is a new copper-gold mine located approximately 300 km south of Broome and 320 km east of Port Hedland in the northern Pilbara region of Western Australia within both the Nyangumarta people’s and the Martu people’s Native Title Determination Areas. The Proposal conceptual footprint will require the clearing of up to 4,868 ha of native vegetation within a proposed 37,344 ha Development... Read more...Last updated: September 1, 2025
Talison Lithium Australia Pty Ltd (Talison) propose to expand the existing Greenbushes Lithium Mine that has been operating for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation to incorporate: Construction of the S2 waste rock landform (WRL) as an expansion of the Floyds WRL. Construction and operation of the S8 WRL to the east of the existing proposal development... Read more...Last updated: August 28, 2025
Robe River Mining Co. Pty. Ltd is seeking to extend the life of operations at Robe Valley, located 146 km southwest of Karratha, in the Pilbara region of Western Australia. The proposal is a significant amendment to the Approved Proposals (MS 776, MS 1112 and MS 1141) and includes the development of new above and below water table iron ore deposits and associated activities to extend the life of the existing operations at Robe Valley. The proposal includes, but is not limited to: development of... Read more...Last updated: August 28, 2025
The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...Last updated: August 28, 2025
VRX Silica Ltd propose to develop a silica sand mine in the Geraldton Sandplain bioregion of Western Australia, approximately 270 km north of Perth. The proposal would include a total disturbance of 412.2 hectares of native vegetation and will involve sequential mining of sand 8 – 15 metres below the soil surface. Vegetation and topsoil will be relocated to rehabilitation areas using the Vegetation Direct Transfer method. Mining will be undertaken in sections by removing blocks (typically 150m... Read more...Last updated: August 26, 2025
Robe River Mining Co. Pty Ltd. (the proponent) propose to develop new above and below water table iron ore mine pits and associated infrastructure to sustain existing West Angelas operations. The proposal is located approximately 130 kilometres northwest of Newman in the Pilbara region of Western Australia. The proposal will involve clearing of an additional 7,200 hectares (ha) of native vegetation (in addition to the 12,205 ha currently authorised under Ministerial Statement 1113) within a... Read more...Last updated: August 25, 2025
FMG Iron Bridge (Aust) Pty Ltd proposes to extend existing operations at its North Star Magnetite Project , which is subject to Ministerial Statement 993 issued under Part IV of the, Environmental Protection Act 1986 ., The proposal is located approximately 110km southeast of Port Hedland in the Pilbara region of Western Australia. The proposed extension includes increasing the Mining Development Envelope by 1425.9 ha and total clearing by 606.9 ha to support new mine pits (180.7 ha); an... Read more...Last updated: August 22, 2025
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: August 22, 2025
The proposal is for Alcoa’s bauxite mining activities on the Darling Range in the southwest of Western Australia spanning the years 2023 to 2027. These activities occur within Alcoa’s Mineral Lease 1SA (ML1SA) and are documented in annual rolling five-year Mining and Management Programs (MMPs) required under a State Agreement Act framework. A 2023-27 MMP has not yet been approved through the State Agreement Act framework but activities are still proposed to be undertaken during this time, and... Read more...Last updated: August 20, 2025
The Proposal includes the expansion and amalgamation of existing operations at: Jimblebar Iron Ore Revised Proposal (Ministerial Statement (MS 1126), Orebody 18 Iron Ore Mine (MS 439, MS 1012), Orebody 31 Iron Ore Mine (MS 1021), to include new above and below water table mining, overburden storage areas, beneficiation plant, overland conveyor, creek diversions, haul and access roads, pipelines and associated infrastructure. All mines and associated elements are proposed to be consolidated into... Read more...Last updated: August 18, 2025
The Commissioner of Main Roads Western Australia (Main Roads) is proposing to widen Tonkin Highway from south of Roe Highway to approximately one kilometre north of Kelvin Road to a six-lane dual carriageway. The proposal includes construction of a half diamond interchange with north facing ramps at the Hale Road intersection in Forrestfield, and a grade-separated interchange at the intersection of Tonkin Highway and Welshpool Road in Wattle Grove. The proposal includes construction of a... Read more...Last updated: August 18, 2025
Main Roads is proposing to upgrade and widen Anketell Road to an Expressway Standard for approximately 7.5 km between Leath Road and Kwinana Freeway in the City of Kwinana, WA. The Proposal will include grade separated interchanges at six locations, grade separation of road over rail at two locations and other supporting road infrastructure . Read more...Last updated: August 15, 2025
Leichhardt Industrials Pty Ltd propose to develop the Eramurra Solar Salt project approximately 55 km west-south-west of Karratha in the Pilbara region of Western Australia. The proposal includes the development of a series of concentrator and crystalliser ponds and a processing plant. Supporting infrastructure includes seawater intake, bitterns outfall, desalination plant and groundwater bores, power supply and other infrastructure. Export of product would be via a previously approved trestle... Read more...Last updated: August 7, 2025
The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup... Read more...Last updated: August 4, 2025
Time limit for substantial commencement and review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for the relevant environmental factors. Read more...