This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: February 3, 2026
The Northern Terminal to Neerabup Terminal 330kV Transmission Line proposal (the Proposal) is located approximately 13 km north of Perth in the City of Swan and City of Wanneroo. The Proposal is for the construction of a new 330kV dual circuit transmission line between Northern Terminal in Malaga and Neerabup Terminal in Pinjar, a length of approximately 29 km. Additionally, the Proposal includes the expansion of the two existing Western Power substations, Northern Terminal and Neerabup... Read more...Last updated: February 3, 2026
Time limit for substantial commencement, review of the adequacy of existing implementation conditions to ensure consistency with the EPA’s current objectives for each environmental factor. Read more...Last updated: February 3, 2026
The Department of Transport is proposing to construct a safe and accessible boating facility at the existing boat ramp site at Entrance Point, Broome. The proposal is located within the existing Port of Broome port limits, approximately 350 metres south-west of the previously assessed Kimberley Marine Offloading Facility. The proposal includes construction of a boat ramp, two finger jetties, two groynes, an offshore breakwater and associated terrestrial public amenity infrastructure. Piling... Read more...Last updated: February 3, 2026
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: February 3, 2026
Saracen Properties Pty Ltd (representing 5 Star Margaret River Pty Ltd and The Beach Village Pty Ltd) proposes to develop various lots along Wallcliffe Road Gnarabup for a 121 room five star resort, and beach village comprising of short-stay accommodation, residential dwellings and commercial premises. The proposal development envelope is 8.11 hectares. The proposal is located on the western side of Wallcliffe Road, Gnarabup Beach. Following the seven day public comment period and consideration... Read more...Last updated: January 22, 2026
The proposal is for the construction and operation of a 140 megawatt (MW) thermal power station and associated supporting infrastructure located directly east of Kalgoorlie-Boulder in the Goldfields region of Western Australia. The proposed power station will supply electricity to Kalgoorlie Consolidated Gold Mines (KCGM) and connect to the South West Interconnected System (SWIS). The power station will be capable of operating using natural gas, distillate and future alternative fuel sources... Read more...Last updated: January 21, 2026
Atlas Iron Pty Ltd is proposing to develop and operate Stage 2 of the Sanjiv Ridge Project, a satellite operation to Stage 1, which will involve the above water table mining of approximately 10 million tonnes (Mt) of iron ore from the Glen Herring deposit which is located on an adjacent range 3 km west of Stage 1 and approximately 241 km south-east of Port Hedland in the Shire of East Pilbara. The proposal will consist of three new pits, four waste rock dumps and a 4 km haul road connecting to... Read more...Last updated: January 20, 2026
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: January 20, 2026
BHP proposes to construct and operate a creek discharge at Homestead Creek to manage up to 60 megalitres per day (up to 16.2 gigalitres per annum) of surplus water from the existing Orebody 32 Below Water Table (BWT) mining operations, located approximately 3.6 kilometres northeast of Newman. The existing Orebody 32 BWT mine includes below water table mining and the construction of a surplus water pipeline to Ophthalmia Dam. The proposal is a derived proposal authorised by the Pilbara Expansion... Read more...Last updated: January 19, 2026
The proposal is for the development of an onshore wind farm and involves the construction and operation of up to 65 wind turbines, generating up to 500 megawatts (MW)., Associated infrastructure includes a battery energy storage system (BESS), electrical cabling, substation, transmission infrastructure, and other supporting and temporary infrastructure., The Proposal is located on freehold agricultural land approximately 5 km south of Dandaragan, Western Australia. The Proposal will connect to... Read more...Last updated: January 13, 2026
Aigle Royal propose to develop Lots 11 and 74 Beenyup Road, Banjup for residential development and conservation. The site adjoins Jandakot Regional Park. 10.25 hectares of the site is proposed for residential development and a wetland buffer. 23 hectares is proposed to be managed for conservation. Read more...Last updated: January 6, 2026
The proposal is for the development of an onshore renewable energy facility and involves the construction and operation of up to 140 wind turbines, generating up to 1,000 MW, up to 500 MW of solar power generation, battery energy storage system with capacity of up to 500 MW, and associated supporting infrastructure. The proposal is located approximately 15 km east of the town of Eneabba in the Mid West region of Western Australia. The proposal will connect into the South West Interconnected... Read more...Last updated: January 5, 2026
Newcrest Operations Limited proposes to construct and operate the Telfer – Havieron Gold Mining Project (the Project). The Telfer Gold Mine is located about 55 km to the west of the Havieron Gold Mine and 400 km south-east of Port Hedland in the Great Sandy Desert region of Western Australia. The project includes: The open pit and underground mining and subsequent processing of gold-copper ore at the Telfer Gold with associated infrastructure including a 160 MW natural gas-fired power station,... Read more...Last updated: December 23, 2025
The Proposal is to construct and operate an open cut gold mine approximately 275 km southeast of Perth and 37 km northeast of Katanning, WA. The total disturbance proposed is up to 68.78 hectares (ha), which includes the disturbance of 58.39 ha of native vegetation over a 10-year life of mine. The annual total pit dewatering volume is estimated to be 0.4 gigalitres per year (GL/yr) with a maximum of 0.5 GL/yr. Read more...Last updated: December 18, 2025
Digital 4 Pty Ltd proposes to develop Lot 802 Erindale Road Hamersley for urban development. Clearing of native vegetation will also occur within the western portion of Lot 803 to establish an Asset Protection Zone to meet requirements for bushfire management. The urban development will include residential development, internal public road network, public open space, a conservation area, drainage swales/basins and sewer easements. The development envelope for the proposal is 13.55 hectares. The... Read more...Last updated: December 17, 2025
The proposal is for the construction and operation of a renewable wind and solar generation hub to power Northern Star’s Kalgoorlie Consolidated Gold Mines (KCGM) Operations located approximately 10 kilometres (km) northeast of Kalgoorlie-Boulder on mining tenure held by Northern Star. The Proposal comprises the construction and operation of up to 32 turbines and a solar farm of a combined production capacity of 366-megawatt, a 300-megawatt hour battery energy storage system (BESS), a 132... Read more...Last updated: December 17, 2025
The proposal is for above and below water table mining and beneficiation of vanadium ore to produce an enriched vanadium-iron concentrate. The proposal is located 40 km south-southeast of Meekatharra and includes the development of open mine pits and associated infrastructure including but not limited to access roads, accommodation camp, a crushing, milling, flotation, and magnetic separation (beneficiation) plant, waste rock and tailings storage, and support infrastructure. Read more...Last updated: December 17, 2025
Technology Metals Australia are looking to develop the Gabanintha Vanadium Project. The Gabanintha Vanadium Project is located within WA’s Mid-West region, approximately 615 km north-east of Perth and 40 km south-east of Meekatharra, adjacent to the Meekatharra-Sandstone Road. The proposal includes development of multiple vanadium deposits (Far North, North, and Central) via open pit mining. Supporting infrastructure for the Project includes waste rock landforms (WRLs), mineralised waste... Read more...Last updated: December 16, 2025
Talison Lithium Australia Pty Ltd (Talison) propose to expand the existing Greenbushes Lithium Mine that has been operating for over 30 years, to increase the production of spodumene ore and lithium mineral concentrate from the operation. This proposal is an expansion of the existing mining operation to incorporate: Construction of the S2 waste rock landform (WRL) as an expansion of the Floyds WRL. Construction and operation of the S8 WRL to the east of the existing proposal development... Read more...Last updated: December 11, 2025
Proposal by Cable Sands (WA) Pty Ltd to mine mineral sands and relocate an existing rubbish tip in a portion of "C" Class Reserve 31900 which is vested in the Shire of Harvey for the purpose of sand extraction and rubbish disposal. Read more...