Skip to main content

EPA WA

Site map | Accessibility | Contact us | Login

Go to whole of WA Government search

  • Home
  • About EPA
    • The functions of the EPA
      • EPA members
      • EPA Annual Reports
      • OEPA Annual Reports
      • Strategic Plan
      • Code of Conduct
      • Evaluation reports
      • Stakeholder engagement
      • EPA Scientific Advisory Council
    • Statement of Expectation
    • Legislation
    • Information statement and Freedom of Information
    • Agency agreements
    • State of the environment
    • Legal and governance review
  • Assessments
    • About EIA - Proposals
      • Assessment framework
      • Step-by-step through the assessment process
    • About EIA - Schemes
      • Scheme Referral form
    • Public comment and submissions
    • How to appeal against a decision or recommendation of the EPA
    • Ministerial decisions

      Active Assessments
      SEARCH Proposals
      SEARCH Schemes
      Chair's Determinations

      • Ministerial Statements
    • Tools
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Subscribe to content
    • Search
      • Decisions on whether to assess
      • EPA assessment reports
  • Implementation
    • Making information publicly available
    • I want to ...
      • Prepare a Compliance Assessment Plan
      • Prepare a Compliance Assessment Report
      • Prepare an Audit Table
    • Tools
      • Post assessment forms
      • Search Post-assessment changes
    • Links
      • State Environmental Offsets Register
  • Guidelines & procedures
    • Environmental Protection Policies (EPPs) and Associated Regulations
      • Framework for Environmental protection policies (EPPs) and associated regulations
      • Western Swamp Tortoise habitat EPP
      • Goldfields residential area (sulfur dioxide) EPP and regulations
      • Kwinana (atmospheric wastes) EPP and regulations
      • Peel Inlet – Harvey estuary EPP
    • Assessment procedures in EIA
      • Framework for assessment procedures in EIA
      • Administrative Procedures
      • Procedures Manual
      • Instructions, templates and forms
      • Search guidelines and procedures
      • Replaced policy and its location in the current framework
    • Environmental considerations in EIA
      • Framework for environmental considerations in EIA
      • Statement of Environmental Principles, Factors and Objectives
      • Sea
      • Land
      • Water
      • Air
      • People
    • Advice and Reference Material
      • Framework for advice and reference material
      • Strategic advice
      • Advice on environmental matters
      • Technical reports and environmental management studies
      • Government policies and guidance
      • Guidance for planning and development
      • State Environmental Policies
      • Advice on the state’s environment
      • EPA Submissions
  • News Centre

Filter by industry sector:

  • Nickel (8) Apply Nickel filter
  • Gold (2) Apply Gold filter
  • Iron Ore (2) Apply Iron Ore filter
  • Rare earth elements (2) Apply Rare earth elements filter
  • Waste management (2) Apply Waste management filter
  • Copper (1) Apply Copper filter
  • Industrial (1) Apply Industrial filter
  • Infrastructure (1) Apply Infrastructure filter
  • Land use (1) Apply Land use filter
  • Mineral sands (1) Apply Mineral sands filter
  • Power generation (1) Apply Power generation filter
  • Sand, rock, gravel and clay (1) Apply Sand, rock, gravel and clay filter
  • Uranium (1) Apply Uranium filter
  • Utilities (1) Apply Utilities filter

Filter by current status:

  • Ministerial Statement published (15) Apply Ministerial Statement published filter
  • Decision on whether to assess has been published (3) Apply Decision on whether to assess has been published filter
  • EPA Report and Recommendations released - appeals closed (2) Apply EPA Report and Recommendations released - appeals closed filter
  • Assessment on Proponent Information – public submission period closed (1) Apply Assessment on Proponent Information – public submission period closed filter
  • EPA Report and Recommendations released - appeals open (1) Apply EPA Report and Recommendations released - appeals open filter
  • EPA Report and Recommendations released - not appealable (1) Apply EPA Report and Recommendations released - not appealable filter

Filter by relevant environmental factors:

  • (-) Remove Social Surroundings filter Social Surroundings
  • Flora and Vegetation (21) Apply Flora and Vegetation filter
  • Terrestrial Fauna (16) Apply Terrestrial Fauna filter
  • Inland Waters (7) Apply Inland Waters filter
  • Subterranean Fauna (7) Apply Subterranean Fauna filter
  • 37 (6) Apply 37 filter
  • Human Health (6) Apply Human Health filter
  • Hydrological Processes (6) Apply Hydrological Processes filter
  • 3144 (5) Apply 3144 filter
  • Landforms (4) Apply Landforms filter
  • Inland Waters Environmental Quality (3) Apply Inland Waters Environmental Quality filter
  • Terrestrial Environmental Quality (3) Apply Terrestrial Environmental Quality filter
  • Marine Environmental Quality (2) Apply Marine Environmental Quality filter
  • Benthic Communities and Habitats (1) Apply Benthic Communities and Habitats filter
  • Coastal Processes (1) Apply Coastal Processes filter
  • Marine Fauna (1) Apply Marine Fauna filter

Filter by Proponent:

  • Hinckley Range Pty Ltd (2) Apply Hinckley Range Pty Ltd filter
  • Alliance Nickel Ltd (1) Apply Alliance Nickel Ltd filter
  • Anaconda Nickel Limited (1) Apply Anaconda Nickel Limited filter
  • APA Northern Goldfields Interconnect Pty Ltd (1) Apply APA Northern Goldfields Interconnect Pty Ltd filter
  • BHP Billiton Nickel West (1) Apply BHP Billiton Nickel West filter
  • Gold Road Resources Limited (1) Apply Gold Road Resources Limited filter
  • Kalgoorlie Consolidated Gold Mines Pty Ltd (1) Apply Kalgoorlie Consolidated Gold Mines Pty Ltd filter
  • LandCorp (1) Apply LandCorp filter
  • Lost Sands Pty Ltd (1) Apply Lost Sands Pty Ltd filter
  • Lynas Kalgoorlie Pty Ltd (1) Apply Lynas Kalgoorlie Pty Ltd filter
  • Mineral Resources Limited (1) Apply Mineral Resources Limited filter
  • Minister for Works (1) Apply Minister for Works filter
  • MRC Graphite Pty Ltd (1) Apply MRC Graphite Pty Ltd filter
  • Mt Weld Mining Pty Limited (1) Apply Mt Weld Mining Pty Limited filter
  • Murrin Murrin Operations Pty Ltd (1) Apply Murrin Murrin Operations Pty Ltd filter
  • OZ Minerals Musgrave Operations Pty Ltd (1) Apply OZ Minerals Musgrave Operations Pty Ltd filter
  • Ravensthorpe Nickel Operations Pty Ltd (1) Apply Ravensthorpe Nickel Operations Pty Ltd filter
  • Tellus Holdings Ltd (1) Apply Tellus Holdings Ltd filter
  • The Department of Agriculture and Food (1) Apply The Department of Agriculture and Food filter
  • Vimy Resources Limited (1) Apply Vimy Resources Limited filter
  • WGEH Pty Ltd (1) Apply WGEH Pty Ltd filter
  • Yilgarn Iron Pty Ltd (1) Apply Yilgarn Iron Pty Ltd filter

Filter by region:

  • (-) Remove Goldfields Esperance filter Goldfields Esperance
  • Mid West (1) Apply Mid West filter

Filter by last updated:

  • 2025 (2) Apply 2025 filter
  • 2024 (10) Apply 2024 filter
  • 2022 (2) Apply 2022 filter
  • 2021 (1) Apply 2021 filter
  • 2020 (2) Apply 2020 filter
  • 2019 (1) Apply 2019 filter
  • 2018 (1) Apply 2018 filter
  • 2017 (1) Apply 2017 filter
  • 2016 (1) Apply 2016 filter
  • 2001 (1) Apply 2001 filter
  • 1993 (1) Apply 1993 filter
  1. Home
  2. Proposal search
  3. Goldfields Esperance
  4. Social Surroundings

Proposal Search

This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au

Visit Environment Online Portal if you cannot locate a specific proposal here.

Search instructions for Proposals

  • Enter a search term or keyword; e.g. proposal title, assessment number, proponent, region etc
  • Hit Enter or click the Search button
  • You can also use the filters on the left to refine the results
  • Click Reset to start a new search
Search EPA website
Find EPA Reports
Reset this Search
More Search pages

Ravensthorpe Nickel Project (s46)

Last updated: March 4, 2025

Inquiry under s46 into the request for a number of substantial changes to the Ravensthorpe Nickel Project, located approximately 35 km east of Ravensthorpe, the subject of Ministerial Statement 509 . In summary, the proposed changes include: mining of additional ore reserves contained within the Shoemaker-Levy and Hale-Bopp deposits and a resulting increase in clearing within the Bandalup Corridor; changes to the processing of ore and the final product: a) deletion of nickel electrowinning,... Read more...

Fimiston Gold Mine Operations Extension (Stage 3) and Mine Closure Planning: Revised Proposal - Fimiston South Project

Last updated: February 3, 2025

Kalgoorlie Consolidated Gold Mines is seeking to expand the Fimiston Gold mine operations (Fimiston), located 600 kilometres East of Perth, and adjacent to the City of Kalgoorlie-Boulder, Western Australia. The proposal is a significant amendment to the current Fimiston Gold Mine Operations Extension (Stage 2) and Mine Closure Planning, approved under Ministerial Statement 782, operated by Kalgoorlie Consolidated Gold Mines (KCGM). The proposal is for the expansion of the Fimiston operations in... Read more...

Western Green Energy Hub

Last updated: November 25, 2024

The Western Green Energy Hub is a proposal to design, construct and operate a large-scale wind and solar power project to produce value added products, with the base case assuming green ammonia production. The proposal is situated on WA Mirning Native Title determined land in the far southeast of Western Australia in the Shire of Dundas and City of Kalgoorlie-Boulder, to the northwest of Eucla in the South Coast Region. The proposal will be located on Unallocated Crown Land and pastoral leases... Read more...

Wingellina Nickel Project

Last updated: November 25, 2024

Hinckley Range Pty Ltd proposes to mine nickeliferous limonite ore from the Wingellina deposit located approximately 1,400 km north-east of Perth in the Shire of Ngaanyatjarraku close to the Northern Territory and South Australia borders Read more...

West Musgrave Copper and Nickel Project

Last updated: November 25, 2024

OZ Minerals Musgrave Operations Pty Ltd propose to develop the West Musgrave Copper and Nickel Project, located in the West Musgrave Ranges of Western Australia, approximately 1,300 km north-east of Perth near to the intersection of the borders between Western Australia, South Australia and the Northern Territory. The nearest towns include the Indigenous Communities of Jameson (Mantamaru) 26 km north, Blackstone (Papulankutja) 50 km east, and Warburton (Milyirrtjarra) 110 km west of the... Read more...

Intractable Waste Disposal Facility, Mt Walton East (s46)

Last updated: October 20, 2024

The Intractable Waste Disposal Facility (IWDF) is 75km north-east of Koolyanobbing and approximately 53km north-east of Jaurdi Station Homestead (unoccupied). The site occupies a 25km 2 Crown Reserve No. 42001 and is accessed by a 100km long dedicated unsurfaced road (Crown Reserve No. 44102) that extends northward from the Boorabbin Siding on Great Eastern Highway. This inquiry under s46 is in regard to consolidation of environmental conditions of Ministerial Statements 44 , 205 , 353 and 533... Read more...

State Barrier Fence Esperance Extension

Last updated: September 18, 2024

The Department of Agriculture and Food, Western Australia (DAFWA) proposes to erect a 660 kilometre long, 1.35 metre high extension to the existing State Barrier Fence from its current termination point near the town of Ravensthorpe to the east of Esperance near Cape Arid National Park. The purpose of the Esperance extension is to protect the south-eastern agricultural enterprises from predation and grazing from wild populations. This proposal was originally referred by the Conservation Council... Read more...

NiWest Nickel Cobalt Project

Last updated: July 8, 2024

Alliance Nickel Ltd is proposing to develop the NiWest Nickel Cobalt Project, a greenfield nickel and cobalt mine located approximately 50 km southeast of Leonora, near Mount Kilkenny. The primary product of the mine, nickel sulphate, is to be exported for use in the manufacturing of batteries in electric vehicles. The proposal includes the development of mine pits and associated infrastructure, including but not limited to, a borefield, temporary waste rock landforms, accommodation camp, and... Read more...

Sandy Ridge Facility – Alignment of Gate Waste Acceptance Tonnage

Last updated: June 25, 2024

Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078 Read more...

Murrin Murrin Nickel-Cobalt Project Stage 2 Expansion

Last updated: April 24, 2024

The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...

Wingellina Nickel Project (S46) [2331]

Last updated: April 22, 2024

Changes to conditions 3 and 6; of Ministerial Statement 1034 to extend the Time Limit of Authorisation for substantial commencement of the proposal (condition 3); and remove condition 6 prepare and submit a survey plan in relation to flora species Goodenia sp. aff. quasilibera. Changes to all conditions during the time extension and whether additional conditions for Aboriginal heritage and Greenhouse Gas Emissions should be required for this proposal. Read more...

Mt Weld Rare Earths Project – Life of Mine Proposal

Last updated: March 26, 2024

Mt Weld Mining Pty Ltd proposes to expand the Mt Weld Mine, which includes the construction and operation of a rare earths mine and processing plant, to its life of mine extent. The expansion proposes to increase the development envelope from the currently approved 505 hectares (ha) to 2,802 ha, to allow for expansion of infrastructure and activities, including: a staged transition from diesel fuelled power generation to gas hybrid renewable (including solar and battery energy storage, and... Read more...

Northern Goldfields Interconnect Pipeline

Last updated: June 14, 2022

APA Northern Goldfields Interconnect Pty Ltd proposes to construct and operate the Northern Goldfields Interconnect Pipeline. The 300 mm diameter buried gas pipeline will extend for approximately 580 km, starting from Ambania (50 km east of Geraldton) to 40 km south of Leinster where it will connect into the existing Goldfields Gas Pipeline. The project will connect existing gas assets in the Mid West region with existing gas assets in the Northern Goldfields region. The proposal includes... Read more...

Lynas Kalgoorlie Rare Earths Processing Facility

Last updated: February 1, 2022

Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...

Munglinup Graphite Project

Last updated: May 10, 2021

The Munglinup Graphite Project is located in the South Coast region of Western Australia, approximately 105km west of Esperance, 85km east of Ravensthorpe and 4km north on Munglinup. MRC Graphite Pty Ltd propose to extract graphite from up to six open pits. The proposal will also include a processing plant, tailings storage facility, waste rock landforms, and associated infrastructure. The proposal would include a total disturbance of 350 hectares. Read more...

Mt Keith Satellite Project

Last updated: September 16, 2020

BHP Billiton Nickel West (BHPB) proposes to develop the Mt Keith Satellite Project (the proposal), to the existing Mount Keith Mining Operations. The proposal is located approximately 80 km north of Leinster in the Shire of Leonora. The proposal includes clearing of up to 842 hectares of native vegetation (which is also fauna habitat) for two open pits, a Waste Rock Landform and a transport corridor, with minor ancillary infrastructure to support the mining process. Read more...

Koolyanobbing Range F Deposit (s46) [2198]

Last updated: May 6, 2020

Changes to conditions 8 (Stage 1 offsets) and 9 (Access to Stage 2 mining area) to allow full ground disturbance access to the Stage 2 mining area based on progress to date, and condition 10 (Stage 2 offsets) in terms of offsetting significant residual impact. Read more...

Windarling range; Mt Jackson Range and Deception Deposit (S46) [2199]

Last updated: April 1, 2019

Changes to condition 7 (Restricted areas and management of Tetratheco paynteroe ssp. paynterae at the Windarling Range) to allow future ground disturbing access to the restricted 'Area B', and condition 10 (Residual impacts and risk management measures) in terms of revised research and management offset measures for threatened flora species. Read more...

Gruyere Gold Project

Last updated: April 18, 2018

Gold Road Resources Limited propose to develop a gold mine know as the Gruyere Gold Project located approximately 200 km north-east of Laverton. The proposal includes clearing of no more than 2,260 ha of vegetation and groundwater dewatering for mining and processing. Read more...

Cyclone Mineral Sands Project

Last updated: January 9, 2017

Lost Sands Pty Ltd (Lost Sands) proposes to develop and operate the Cyclone Mineral Sands Project, located on the northern margin of the Eucla Basin, approximately 317 kilometres (km) north of Eucla and 220 km north of the Trans-Australia Railway. The proposal is for a mining operation to produce zircon and two high titanium mineral products. The conceptual layout of the mine includes open cut pits, mining and processing infrastructure, airstrip, camp and bore fields. The proposal is located in... Read more...

Pages

  • 1
  • 2
  • next ›
  • last »

About us

The EPA Strategic Plan
Annual Report
News and Media
Job opportunities

Quick links

Minister for Environment
Ministerial Statements
Department of Water and Environmental Regulation
Office of the Appeals Convenor
State Environmental Offsets Register

Stay informed

Status of current formal assessments
Public comment and submissions
Follow us on X
Subscribe to website updates

Contact us

How to contact the EPA
1800 161 176
info.epa@dwer.wa.gov.au
8 Davidson Terrace, Joondalup, WA 6027
Locate us
Freedom of Information

Home | Privacy | Disclaimer | Site map | Website feedback | Copyright | X | Login

wa.gov.au

All contents © 2025 Government of Western Australia. All rights reserved.