Sandy Ridge Facility – Alignment of Gate Waste Acceptance Tonnage

Project
Proposal description: 

Tellus Holdings Ltd are proposing to increase the tonnage of waste accepted at the Sandy Ridge Facility from the current approved (Ministerial Statement 1078) 100,000 tonnes per annum to up to 280,000 tonnes per annum for permanent isolation in the Site’s waste disposal cells. 

The Proposal will occur within the existing and approved development envelope as outlined in Ministerial Statement 1078

Assessment Number: 
2309
Referred under EP Act: 
s38
Last updated: 
February 9, 2023
Current Status: 
Environmental Scoping Document approved
Environmental Scoping Document approved
Get notified of updates and new content

Login to Subscribe to this page | Subscription Info