Last updated: April 8, 2021
The proposal is for the construction and operation of a Lithium Hydroxide Refinery at Lot 15 Mason Road, Kwinana within the Kwinana Industrial Area, approximately 31 km south of the Perth Central Business District. The Proposal will process spodumene ore concentrate, to produce battery grade Lithium Hydroxide Monohydrate, primarily for use in Lithium ion batteries for electric vehicles. The proposal would require a total of 11.2 hectares of native vegetation clearing within a 76 hectare ... Read more...Last updated: April 6, 2021
The Western Australian Water Corporation is proposing to construct the Alkimos Seawater Desalination Plant (ASDP) as part of Perth’s Integrated Water Supply Scheme which aims to provide additional sources of drinking water to supplement the existing metropolitan water supply. The ASDP Proposal will be located within the Alkimos Water Precinct (Lot 1050 Marmion Avenue), approximately 40 km north of the Perth, within the northwest corridor, north of Quinns Rock beach and south of Yanchep beach.... Read more...Last updated: April 1, 2021
VBX Limited propose to develop a bauxite mine located approximately 15 km west of the town of Kalumburu in the Kimberley. The proposal involves the mining of bauxite in the Kimberley and the use of a conveyor to transport processed ore to a barge-loading facility in Napier Broome Sound, and then trans-shipping of ore. Read more...Last updated: March 30, 2021
Alcoa of Australia Limited is proposing to increase production at the Pinjarra Alumina Refinery (the refinery) and increase the rate of bauxite mining at the existing Huntly Mine within Mineral Lease 1SA (ML1SA) to supply 2.5 million tonnes per annum (Mtpa) bauxite, for export to third party customers. The Proposal comprises the following components: an increase in alumina production at the refinery by 5 percent, from 5.0 Mtpa to 5.25 Mtpa; A transition of the Huntly mine into the Myara North... Read more...Last updated: March 2, 2021
Lynas Kalgoorlie Pty Ltd (Lynas) propose to construct and operate a new Rare Earths Processing Facility at Lot 500 Great Eastern Highway, Yilkari and a By-product storage facility on Common Reserve 8767, Yarri Road, Parkerston in the City of Kalgoorlie-Boulder. The Rare Earths Processing Facility will process rare earth concentrate from the Mt Weld mine to produce a rare earth carbonate for export. Read more...Last updated: February 10, 2021
Perdaman Chemicals and Fertilisers Pty Ltd intends to construct and operate a urea plant with a production capacity of approximately 2 million tonnes per annum (Mtpa) on Sites C and F within the Burrup Strategic Industrial Area (SIA) on the Burrup Peninsula. Both sites are located adjacent to the Murujuga National Park. Read more...Last updated: February 8, 2021
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to twenty wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: February 3, 2021
Main Roads WA is proposing to conduct works to upgrade approximately 1.5 kilometre (km) of High Street in the City of Fremantle, Western Australia. The upgrade from Stirling Highway to Carrington Street to a four lane dual carriageway is aimed at improving road safety. The works would require a total disturbance of approximately 20.1 hectares (ha), including 1.8 ha of the Fremantle Public Golf Course, Royal Fremantle Golf Club (Class A reserve) and 0.1 ha of the Fremantle Environmental Resource... Read more...Last updated: February 1, 2021
Salt Lake Potash Limited propose to abstract Sulphate of Potash (SOP) rich brines to produce up to 260 kilotonnes per annum (ktpa) of SOP product. The proposal is located in and around Lake Way, approximately 25 kilometres south of Wiluna. The activities and infrastructure proposed includes evaporation ponds, brine abstraction trenches, paleochannel brine production bores, permanent brine pumps/pipework, access and infrastructure corridors and excess salt disposal areas. The proposal will cover... Read more...Last updated: February 1, 2021
PEG proposes to construct and operate 14 new gas-fired reciprocating engines with a combined maximum installed capacity of 165 MW. It is expected the average annual throughput of the facility will be approximately 150 MW. The 165 MW power station is expected to result in 609,696 tCO2-e. The proposed PEG power station is located next to the existing Solomon power station and replaces the need for 221 MW power at Iron Bridge, which would have resulted in 1,196,423 tCO2-e. FMG have submitted a... Read more...Last updated: February 1, 2021
The Waitsia Gas Project Stage 2 is a conventional gas proposal located approximately 16km East-South-East of the Dongara-Port Denison town sites. The proposal includes clearing of up to 17 ha of native vegetation to support the following: Construction and operation of a new gas processing plant with a maximum export capacity of 250 terajoules per day; Drilling of up to 6 new production wells to supplement the existing 2 wells; Installation of a gas gathering system comprising of flowlines... Read more...Last updated: January 28, 2021
The Revised Proposal outlines a significant increase in ground disturbance to that previously approved, a revised materials management strategy, a Life of Mine water management strategy including Managed Aquifer Reinjection, a significant increase in dewatering volumes and establishment of permanent surface water diversion structures. Read more...Last updated: January 25, 2021
Changes to Schedule 1 and Condition 12 (Odour Management) of Ministerial Statement 755 in order to: • Amend a key proposal characteristic in Schedule 1 regarding venting of odours. • Review the suitability of Condition 12 in light of the proposed change to Schedule 1 and having regard to the Licence requirements under Part V of the EP Act. Read more...Last updated: January 7, 2021
Alcoa of Australia have requested changes to conditions 8, 9, 10, 11 and 12 of Ministerial Statement 728 and 1069 in order to facilitate an increase in production to 3.3 million tonnes per annum (Mtpa). Read more...Last updated: January 4, 2021
Robe River Mining Co. proposes to develop the West Angelas C, D and G iron ore deposits to sustain production at the existing West Angelas iron ore operations. The proposal is located approximately 130 km northwest of Newman. Mining of the C, D and G iron ore deposits will involve the additional clearing of up to 4,310 ha of native vegetation within a mine development envelope of 26,400 ha. Mine dewatering will be required to accommodate below water table mining, requiring an additional ... Read more...Last updated: December 21, 2020
In 1998 Main Roads Western Australia (Main Roads) referred Stages 2, 3 and 4 of the Karratha – Tom Price Road, now called the Manuwarra Red Dog Highway (the Original Proposal), to the Environmental Protection Authority (EPA). The EPA assessed the Original Proposal and published EPA Report 1159. Ministerial Statement (MS) 677 was published in 2005. Construction of Stage 2 was completed in 2008. Stage 3 of the Original Proposal is currently under construction and is expected to be completed in... Read more...Last updated: December 2, 2020
Bennett Resources is proposing to undertake an unconventional exploration drilling and hydraulic fracture stimulation program within Petroleum Exploration Permit EP 371 (EP 371) within the Shire of Derby, West Kimberley. The proposal area is located approximately 123 kilometres south east of the town of Derby. The proposal comprises the construction of up to six wells in a region of the Canning Basin that has been previously surveyed and explored for petroleum purposes. The proposal is... Read more...Last updated: November 30, 2020
Austral Bricks is proposing the redevelopment of the Cardup Brickworks, which includes the expansion of the existing factory, increasing the design capacity from 200,000 to 250,000 tonnes per annum. The site is located in the southern extremity of Byford. Additional ancillary improvements include the installation of a new baghouse scrubber and a new primary crusher located in the floor of the pit. The proposal would include: Expanding the capacity from 200,000 to 250,000 tonnes per annum; ... Read more...Last updated: November 3, 2020
The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Read more...