ProjectProponent: NewGen Power Pty LtdProposal description: The construction, operation and maintenance of a nominal 320 megawatt combined cycle base load power plant at Kwinana, as documented in schedule 1 of the ministerial statement. Assessment Number: 1583Region: PerthReferred under EP Act: s38Industry sector: Power generationLast updated: April 24, 2024Current Status: Ministerial Statement published 2. Decision on whether to assess this proposalChair's Determination: Environmental Protection Statement (EPS)Preliminary Environmental Factors: Marine Environmental QualityDate published: Monday, 8 August, 2005 4. EPA Report on assessmentEPA Report Number: 1190EPA Report: Kwinana Gas-Fired Power Station (Water Cooled Condenser) (PDF, 3.56 MB)Key Environmental Factors: Social SurroundingsMarine Environmental QualityMarine FaunaDate published: Monday, 8 August, 2005Appeals close: Monday, 22 August, 2005 5. Decision on proposal and implementation of proposalMinisterial StatementDate of approval: Monday, 7 November, 2005Ministerial Statement: Statement 698.pdf (PDF, 2.37 MB) Post-assessment changess. 45C amendments: Attachment to Statement 698 - Amendment of Schedule 1 – Key Proposal Characteristics Table 1 - change to proposal approved on 15 August 2007. Attachment 2 to Statement 698 Include an additional mode of operation Increase the authorised limit of oxides of nitrogen (NOx) Update location maps (Figures 1 and 2) Changes approved under S45c on 3 November 2020. Attachment 3 to Statement 698 - Increase in power generation capacity and thermal efficiency. Changes approved under S45c on 22 April 2024. Date of approval s. 45C: Wednesday, 15 August, 2007Tuesday, 3 November, 2020Wednesday, 24 April, 2024