This "Search Proposal" function provides all assessment documentation associated with a specific proposal, from referral through to Ministerial Statement, where relevant. Information on a specific proposal not available through this search function can be obtained by contacting DWER, EPA services: info.epa@dwer.wa.gov.au
Visit Environment Online Portal if you cannot locate a specific proposal here.
Last updated: March 27, 2025
The proposal is to design and construct the extension of the Tonkin Highway from Mills Road West to South Western Highway. The proposal is approximately 32 km in length and includes the design, construction and use of a highway of six lanes from Mills Road West to Mundijong Road and four lanes from Mundijong Road to South Western Highway. Read more...Last updated: March 23, 2025
Italia Stone Group proposes to develop a hard rock quarry at Lot 800 Pruden Road Whitby, approximately 3.5 kilometres east of Mundijong in the Shire of Serpentine-Jarrahdale. The proposed quarry is on freehold land and is for the extraction of 50,000 to 100,000 tonnes of hard rock per annum for a period of 20 years. The material will be extracted by drill and blast methods and hauled by truck to a processing area for crushing and stockpiling on site. Read more...Last updated: December 18, 2024
Reward Minerals propose to develop the Lake Disappointment Potash Project (located approximately 320 km east of Newman). The proposal is to abstract brine from sediments and use solar evaporation ponds on the surface of the lake to create the potash product. The proposal would disturb 7,250 ha of land which includes 437 ha of vegetation, with the remainder of disturbance to the surface of Lake Disappointment. Read more...Last updated: December 18, 2024
The proposal is to develop a silver, lead and zinc mine, associated infrastructure and processing facilities approximately 50 kilometres north of Kununurra, with the concentrate produced transported by road and shipped through Wyndham Port. Read more...Last updated: November 25, 2024
Albemarle Lithium Pty Ltd (Albemarle) is proposing to stablish the Albemarle Kemerton Plant, a Lithium hydroxide Product manufacturing plant and associated infrastructure, within the Kemerton Strategic Industrial Area (KSIA), approximately 17 kilometres north-east of Bunbury. The Albemarle Kemerton Plant will produce up to 100,000 tonne per annum (tpa) of lithium hydroxide monohydrate (Lithium Hydroxide Product) from five 20,000 tpa process trains and produce up to 1,100,000 tpa of tailings.... Read more...Last updated: November 25, 2024
The proposal is to develop eight iron ore deposits at five locations, between 35 and 85 kilometres (km) south of Pannawonica. A heavy-haulage railway approximately 285 km in length would be developed to connect the mine area with a port to be constructed at Anketell Point, 25 km north-east of Karratha. The project would produce up to 30 million tonnes per annum (Mtpa) of iron ore. This Ministerial Statement was superseded by Statement 1026 and Statement 1027 published on 4 February 2016. Read more...Last updated: November 25, 2024
FI Joint Venture Pty Ltd is proposing to construct and operate a magnetite iron ore project, with mining, processing and associated infrastructure. The proposed mine is located approximately 225 kilometres (km) east-northeast of Geraldton and 15 km northeast of Yalgoo within the Shire of Yalgoo. The proposal includes a magnetite slurry pipeline and a water pipeline to Geraldton Port and a gas supply pipeline from the Dampier to Bunbury Natural Gas Pipeline network. Mining of the magnetite will... Read more...Last updated: September 27, 2024
The Utah Point Berth Project consists of two separate stages: Stage A: Dredging and Reclamation; and Stage B: Construction and Operation. Stage A, dredging and reclamation works for the UPBP was approved by the Minister for Environment as an amendment to the existing Fortescue Metals Group (FMG) approval and managed according to the approved conditions. The works for Stage A have been successfully completed. The EPA determined that Stage B, the construction and ongoing operation of stockyard... Read more...Last updated: September 4, 2024
The Shire of Esperance proposes to develop a new Waste Management Facility (WMF) at Lot 12 Kirwan Road, Merivale. The proposed WMF will be a 17 ha Class III Putrescible Landfill with a lifespan of 30 years. Read more...Last updated: June 28, 2024
The proposal is to extend the existing Dardanup Mine to allow mining of the Burekup Mineral Sands Deposit located approximately 20 kilometres east of Bunbury, Western Australia. Mining is to depths up to 14 metres below ground level and will require dewatering. Read more...Last updated: April 24, 2024
The proposal is for the Stage 2 expansion of the Murrin Murrin Nickel-Cobalt mining and processing operation (Stage 1), 60 kilometres east of Leonora. The Stage 2 expansion includes the mining of additional ore; an expansion of the processing plant to process additional ore; and the development of additional infrastructure associated with mining and processing of the ore. Read more...Last updated: April 19, 2024
The Public Transport Authority (PTA) proposes to extend the existing Joondalup railway line by 7.3 kilometres from Butler Station to the suburb of Eglinton in the City of Wanneroo. The proposal is to construct and operate the rail extension and includes two new intermodal (rail, bus, ‘park and ride’, ‘kiss and ride’, walk and cycle) transit stations at Alkimos and Eglinton. The PTA will operate train services between Perth and Eglinton Stations and bus services from the Alkimos and Eglinton... Read more...Last updated: February 23, 2024
The proposal, located 280km south east of Halls Creek and 20km west of the Western Australian-Northern Territory border, involves producing approximately 400,000t of ore for gold production from two open pits, Sandpiper and Kookaburra. The ore will be provided for blending with ore from underground mining at the existing operation (Coyote Stage 1). No crushing or processing will be conducted on site and infrastructure will be minimal. Both pits will be mined below the watertable and will not be... Read more...Last updated: February 9, 2024
The proposal includes the existing Cloudbreak iron ore mine and proposed expansion. The existing mine includes open pit strip mining, backfilling of pits, progressive rehabilitation and ore processing. The expansion includes increasing ore production, development of new pits and permanent waste landforms, the development of new infrastructure, additional dewatering and water disposal activities, an upgrade of the ore processing facility. Read more...Last updated: November 6, 2023
Fortescue Metals Group Ltd proposes to develop the Eliwana Mine Project in the Pilbara region of Western Australia. The Eliwana Mine Project Area is located approximately 90 km west-northwest of Tom Price. Over the life of the mine, the average annual production rate is estimated at 30 Mtpa but infrastructure will be constructed to reflect peaks in the annual production rate up to 50 Mtpa. The estimated mine life is 24 years. The proposal involves the clearing of up to 8,560 ha of native... Read more...Last updated: September 18, 2023
The proposal involves the excavation and processing of a low-grade (2.7%) heavy mineral sands deposit near Keysbrook to produce 920,000 tonnes of Heavy Mineral Concentrate (HMC) over 8 years. An area of 30 hectares (ha) would be progressively mined at any time. Topsoil would be removed and stockpiled for use in rehabilitation. The ore would be excavated and unloaded into a dump hopper located on the pit floor. The ore would be conveyed to a screening plant where oversize material would be... Read more...Last updated: September 4, 2023
K plus S Salt Australia Pty Ltd is seeking approval to construct and operate a 3.5 million tonnes per annum (Mtpa) Solar Salt Project located approximately 40 km south-west of the township of Onslow, within the Shire of Ashburton. Read more...Last updated: June 26, 2023
The proposal is to construct and operate a new 48 km section of the Great Northern Highway within the Shire of Chittering. The proposal would bypass the town of Bindoon located approximately 70 km north east of Perth, Western Australia. The Proposal would consist of a combination of four lane dual carriageway, four lane single carriageway and two lane single carriageway and would divert from the existing GNH at the Chittering Roadhouse running west of Bindoon and re-joining the GNH between Hay... Read more...Last updated: June 22, 2023
The Public Transport Authority (PTA) proposes to construct and operate a new 14.5 kilometre (km) dual railway track to extend the existing Thornlie passenger line to Cockburn Central Station on the Mandurah line and duplicate the existing 3 km of single track between Beckenham Junction and Thornlie Station. The proposal requires the relocation of 11 km of freight line within the existing rail reserve. The proposal requires the construction and operation of two new stations at Ranford and... Read more...Last updated: November 8, 2022
Sheffield Resources Limited is seeking approval to develop the Thunderbird Mineral Sands Project located on the Dampier Peninsula, approximately 75 kilometres southwest of Derby, Western Australia. The proposal is for a mineral sands operation with an estimated 40 year life of mine. Mineral product will be mined from the Thunderbird Deposit and processed onsite before being transported by road to the Derby Wharf for storage and subsequent export. Read more...